High voltage AC (HVAC) transmission system is preferred to be used in off-shore wind power plant which is located within 40km from the seashore. Capacitance of HVAC cables is naturally higher than that of overhead lines, and it should be properly compensated. P model of three-core XLPE cable which is widely used in off-shore wind power plant was applied in the paper. Based on this model, impacts of reactive power compensation on HVAC transmission system, including capacity and location of compensation equipment, were analyzed and simulated then. Research showed that inductive compensation at off-shore side of the cable is more effective to decrease power loss along the cable and increase its transmission capacity than that at onshore side, while the latter is more appropriate to improve the power factor at onshore access point of the wind power plant to grid. Compensation capacity was optimized to realize the best economy with designated certain parameters of HVAC system by Sequential Quadratic Programming (SQP) method. Finally by SQP costs of 35kV and 220kV HVAC transmission system were compared, critical distance and transmission capacity of these two systems adoption were found. These results can be a reference of HVAC transmission system design of off-shore wind power plant.
[1]
Chih-Ju Chou,et al.
Comparative Evaluation of the HVDC and HVAC Links Integrated in a Large Offshore Wind Farm—An Actual Case Study in Taiwan
,
2012
.
[2]
P. B. Eriksen,et al.
Selected studies on offshore wind farm cable connections - challenges and experience of the Danish TSO
,
2008,
2008 IEEE Power and Energy Society General Meeting - Conversion and Delivery of Electrical Energy in the 21st Century.
[3]
Thomas Ackermann,et al.
Loss evaluation of HVAC and HVDC transmission solutions for large offshore wind farms
,
2006
.
[4]
J. R. Carson.
Wave propagation in overhead wires with ground return
,
1926
.
[5]
Xiao Wei Dui,et al.
Reactive Compensation Research of HVAC Cables for Offshore Wind Farms
,
2014
.
[6]
O. B. Fosso,et al.
Investment cost of HVAC cable reactive power compensation off-shore
,
2012,
2012 IEEE International Energy Conference and Exhibition (ENERGYCON).
[7]
H. Brakelmann.
Efficiency of HVAC power transmission from offshore-windmills to the grid
,
2003,
2003 IEEE Bologna Power Tech Conference Proceedings,.