Service Reliability and the Optimal Interruptible Rate Option in Residential Electricity Pricing
暂无分享,去创建一个
[1] D. McFadden,et al. Some uses of the expenditure function in public finance , 1974 .
[2] Maurice Marchand,et al. Pricing power supplied on an interruptible basis , 1974 .
[3] M. A. Crew,et al. Peak Load Pricing with a Diverse Technology , 1976 .
[4] Benjamin Avi-Itzhak,et al. Variable Load Pricing in the Face of Loss of Load Probability , 1977 .
[5] John C. Panzar,et al. Public utility pricing under risk: the case of self-rationing , 1978 .
[6] P. Kleindorfer,et al. Reliability and public utility pricing , 1978 .
[7] John Tschirhart,et al. Behavior of a monopoly offering interruptible service , 1979 .
[8] M. Munasinghe. Costs incurred by residential electricity consumers due to power failures , 1980 .
[9] S. Abraham Ravid,et al. A Simple Method for Evaluating the Marginal Cost of Unsupplied Electricity , 1982 .
[10] Arun P. Sanghvi,et al. Economic costs of electricity supply interruptions: US and foreign experience , 1982 .
[11] H. Chao. Peak Load Pricing and Capacity Planning with Demand and Supply Uncertainty , 1983 .
[12] Arun P. Sanghvi,et al. Household Welfare Loss Due to Electricity Supply Disruptions , 1983 .