LH 음식폐기물 제로화 사업추진 방향

This study aims to conduct long time operation of pilot scale of zero food waste system by utilizing fermentation-extinction with bio wood-chips in residential complex. Currently, Detached houses(Yongin-si) went live in June 2015 and is fully operational. In addition, It is planning to build a variety of housing complex.