Forwarding during final felling: work element-specific distributions of driving distances at the stand level

ABSTRACT Automatic data collection is becoming increasingly common in cut-to-length forest operations. However, only few studies have analyzed automatically collected follow-up data from forwarders. In this study, we analyzed the driving distances of the four work elements Driving empty, Loading drive, Driving loaded, and Unloading drive (the sum of which being Total driven distance) of two forwarders operating in central Sweden. The analysis included finding the most appropriate probability density functions for each distance at the stand level (46 final felling stands in total, with one load as the unit of observation). The results showed that the mean intra-stand Total driven distance ranged 364–2393 m, and that most distances in the majority of the stands were positively skewed. Versatile probability distributions like Generalized Extreme Value and Log-logistic were the most common probability distributions. Our results provide researchers and managers a numeric understanding of the intra- and inter-stand variation of forwarding work. Hence, our study can help spread awareness of this variation to managers and foresters. With this awareness, managers, foresters, and researchers can better understand the pros and cons of follow-up data from forwarders, and how to best use and collect it. Our results can also be used by researchers as high-resolution indata during simulations of forwarding work. Additionally, the results can be used as a reference or control when determining the most suitable data distributions in future studies.

[1]  Lars Eliasson Effects of Establishment and Thinning of Shelterwoods on Harvester Performance , 2000 .

[2]  Denis Cormier,et al.  The impact of disc settings and slash characteristics on the Bracke three-row disc trencher’s performance , 2017 .

[3]  S. Berg,et al.  Distance driven and driving speed when forwarding during final felling in Central Sweden , 2019, Journal of Forest Science.

[4]  S. Grigolato,et al.  Tensile Force Monitoring on Large Winch-Assist Forwarders Operating in British Columbia , 2018 .

[5]  Shane Ward,et al.  Effect of Working Conditions on Forwarder Productivity in Cut-to-length Timber Harvesting on Sensitive Forest Sites in Ireland , 2004 .

[6]  S. Berg,et al.  Productivity of loaders and forwarders in Japanese forestry operation conditions , 2018 .

[7]  Mattias Eriksson,et al.  Productivity of harvesters and forwarders in CTL operations in northern Sweden based on large follow-up datasets , 2014 .

[8]  Johan Femling Uppföljning av planerat skotningsavstånd med hjälp av geografisk informationsteknologi (GIT) , 2010 .

[9]  Olle Gelin,et al.  Forwarder crane’s boom tip control system and beginner-level operators , 2017 .

[10]  Y. Nuutinen Possibilities to use automatic and manual timing in time studies on harvester operations , 2013 .

[11]  G. Schwarz Estimating the Dimension of a Model , 1978 .

[12]  Giovanna Ottaviani Aalmo,et al.  Operator performance improvement through training in a controlled cable yarding study , 2014 .

[13]  Natascia Magagnotti,et al.  A comparison of tractor-trailer units and high-speed forwarders used in Alpine forestry , 2015 .

[14]  C. R. Silversides,et al.  Operational Efficiency in Forestry , 1989, Forestry Sciences.

[15]  Jussi Manner Automatic and experimental methods to studying forwarding work , 2015 .

[16]  M. Acuna,et al.  Time consumption and productivity of a forwarder operating on a slope in a cut-to-length harvest system in a Pinus radiata D. Don pine plantation , 2017 .

[17]  Mikael Strandström,et al.  Metsäteiden lisärakentamistarpeen määrittäminen paikkatietoaineistojen avulla , 1970 .

[18]  Tomas Nordfjell,et al.  Vibration Exposure in Forwarder Work: Effects of Work Element and Grapple Type , 2016 .

[19]  Ola Lindroos,et al.  Scrutinizing the Theory of Comparative Time Studies with Operator as a Block Effect , 2010 .

[20]  Matti Sirén,et al.  Equipping a Conventional Wheeled Forwarder for Peatland Operations , 2011 .

[21]  Hideo Sakai,et al.  Comparison of productivity and cost depending on slope when forwarding short length logs with small Japanese forwarders , 2017 .

[22]  Tomas Nordfjell,et al.  Load level forwarding work element analysis based on automatic follow-up data , 2016 .

[23]  Karl Stampfer,et al.  Utilization Rates and Cost Factors in Timber Harvesting Based on Long-term Machine Data , 2011 .

[24]  Jussi Manner,et al.  Comparing forwarder boom-control systems based on an automatically recorded follow-up dataset , 2019, Silva Fennica.

[25]  Jori Uusitalo,et al.  Time consumption analysis of the mechanized cut-to-length harvesting system , 2006 .

[26]  Pete Bettinger,et al.  Thinning Productivity and Cost for a Mechanized Cut-to-Length System in the Northwest Pacific Coast Region of the USA , 1994 .