A discrete multi-objective fireworks algorithm for flowshop scheduling with sequence-dependent setup times
暂无分享,去创建一个
Wenfeng Li | Lijun He | Yu Zhang | Yulian Cao | Lijun He | Wenfeng Li | Yu Zhang | Yulian Cao
[1] Chee Keong Kwoh,et al. Feasibility Structure Modeling: An Effective Chaperone for Constrained Memetic Algorithms , 2010, IEEE Transactions on Evolutionary Computation.
[2] Xianpeng Wang,et al. An adaptive multi-population differential evolution algorithm for continuous multi-objective optimization , 2016, Inf. Sci..
[3] Hamed Mojallali,et al. Solving nonlinear equations systems with a new approach based on invasive weed optimization algorithm and clustering , 2012, Swarm Evol. Comput..
[4] Kalyanmoy Deb,et al. A fast and elitist multiobjective genetic algorithm: NSGA-II , 2002, IEEE Trans. Evol. Comput..
[5] Hamid R. Tizhoosh,et al. Opposition-Based Learning: A New Scheme for Machine Intelligence , 2005, International Conference on Computational Intelligence for Modelling, Control and Automation and International Conference on Intelligent Agents, Web Technologies and Internet Commerce (CIMCA-IAWTIC'06).
[6] Caroline Gagné,et al. Enhanced migrating birds optimization algorithm for the permutation flow shop problem with sequence dependent setup times , 2018, Eur. J. Oper. Res..
[7] Nicola Beume,et al. SMS-EMOA: Multiobjective selection based on dominated hypervolume , 2007, Eur. J. Oper. Res..
[8] M. Kowsalya,et al. A new power system reconfiguration scheme for power loss minimization and voltage profile enhancement using Fireworks Algorithm , 2014 .
[9] Juan M. Corchado,et al. An enhanced scatter search with combined opposition-based learning for parameter estimation in large-scale kinetic models of biochemical systems , 2017, Eng. Appl. Artif. Intell..
[10] Yuhong Sheng,et al. Relative Entropy Model of Uncertain Random Shortest Path , 2015 .
[11] Ali Allahverdi,et al. The third comprehensive survey on scheduling problems with setup times/costs , 2015, Eur. J. Oper. Res..
[12] Li-Jun He,et al. A fitness assignment strategy based on the grey and entropy parallel analysis and its application to MOEA , 2018, Eur. J. Oper. Res..
[13] Dipti Srinivasan,et al. A Survey of Multiobjective Evolutionary Algorithms Based on Decomposition , 2017, IEEE Transactions on Evolutionary Computation.
[14] Xiaoping Li,et al. Adaptive Hybrid Algorithms for the Sequence-Dependent Setup Time Permutation Flow Shop Scheduling Problem , 2012, IEEE Transactions on Automation Science and Engineering.
[15] S. Afshin Mansouri,et al. Bicriteria scheduling of a two-machine flowshop with sequence-dependent setup times , 2009 .
[16] Xin Xiao-long,et al. Partial Entropy and Relative Entropy of Fuzzy Sets , 2005 .
[17] Xiangtao Li,et al. Multiobjective Local Search Algorithm-Based Decomposition for Multiobjective Permutation Flow Shop Scheduling Problem , 2015, IEEE Transactions on Engineering Management.
[18] Qingfu Zhang,et al. Decomposition-Based Multiobjective Evolutionary Algorithm With an Ensemble of Neighborhood Sizes , 2012, IEEE Transactions on Evolutionary Computation.
[19] A. Subash Babu,et al. Improvement of constructive heuristics using variable neighbourhood descent for scheduling a flow shop with sequence dependent setup time , 2014 .
[20] Ying Tan,et al. The bare bones fireworks algorithm: A minimalist global optimizer , 2018, Appl. Soft Comput..
[21] Jun Zhang,et al. Orthogonal Learning Particle Swarm Optimization , 2011, IEEE Trans. Evol. Comput..
[22] Dechang Pi,et al. A multi-objective discrete invasive weed optimization for multi-objective blocking flow-shop scheduling problem , 2018, Expert Syst. Appl..
[23] Xiang-tao Li,et al. A Hybrid Local Search Algorithm for the Sequence Dependent Setup Times Flowshop Scheduling Problem with Makespan Criterion , 2017 .
[24] Yongquan Zhou,et al. Invasive weed optimization algorithm for optimization no-idle flow shop scheduling problem , 2014, Neurocomputing.
[25] Quan-Ke Pan,et al. Solving the large-scale hybrid flow shop scheduling problem with limited buffers by a hybrid artificial bee colony algorithm , 2015, Inf. Sci..
[26] F. Jolai,et al. A novel hybrid genetic algorithm to solve the make-to-order sequence-dependent flow-shop scheduling problem , 2014 .
[27] Taïcir Loukil,et al. Minimizing the Number of Tardy Jobs in a Permutation Flowshop Scheduling Problem with Setup Times and Time Lags Constraints , 2013, J. Math. Model. Algorithms.
[28] Tamer Eren,et al. A bicriteria m-machine flowshop scheduling with sequence-dependent setup times , 2010 .
[29] Mohsen Ziaee,et al. General flowshop scheduling problem with the sequence dependent setup times: A heuristic approach , 2013, Inf. Sci..
[30] Marcelo Seido Nagano,et al. A constructive heuristic for total flowtime minimization in a no-wait flowshop with sequence-dependent setup times , 2015 .
[31] Jun Zhang,et al. Evolutionary Computation Meets Machine Learning: A Survey , 2011, IEEE Computational Intelligence Magazine.
[32] Qingfu Zhang,et al. A Constrained Decomposition Approach With Grids for Evolutionary Multiobjective Optimization , 2018, IEEE Transactions on Evolutionary Computation.
[33] Jie Zhang,et al. A Simple and Fast Hypervolume Indicator-Based Multiobjective Evolutionary Algorithm , 2015, IEEE Transactions on Cybernetics.
[34] Ling Wang,et al. An effective estimation of distribution algorithm for solving the distributed permutation flow-shop scheduling problem , 2013 .
[35] Marcelo Seido Nagano,et al. An evolutionary clustering search for the no-wait flow shop problem with sequence dependent setup times , 2014, Expert Syst. Appl..
[36] Chin-Chia Wu,et al. An iterated local search for the multi-objective permutation flowshop scheduling problem with sequence-dependent setup times , 2017, Appl. Soft Comput..
[37] Ling Wang,et al. A competitive memetic algorithm for multi-objective distributed permutation flow shop scheduling problem , 2017, Swarm and Evolutionary Computation.
[38] Ying Tan,et al. The Effect of Information Utilization: Introducing a Novel Guiding Spark in the Fireworks Algorithm , 2017, IEEE Transactions on Evolutionary Computation.
[39] Mohamed Amine El Majdouli,et al. Fireworks algorithm framework for Big Data optimization , 2016, Memetic Comput..
[40] Saúl Zapotecas Martínez,et al. LIBEA: A Lebesgue Indicator-Based Evolutionary Algorithm for multi-objective optimization , 2019, Swarm Evol. Comput..
[41] Mohammad Hossein Fazel Zarandi,et al. Relative entropy collaborative fuzzy clustering method , 2015, Pattern Recognit..
[42] Rubén Ruiz,et al. Multi-objective sequence dependent setup times permutation flowshop: A new algorithm and a comprehensive study , 2013, Eur. J. Oper. Res..
[43] P. N. Suganthan,et al. Differential Evolution Algorithm With Strategy Adaptation for Global Numerical Optimization , 2009, IEEE Transactions on Evolutionary Computation.
[44] Saeed Gholizadeh,et al. An improved fireworks algorithm for discrete sizing optimization of steel skeletal structures , 2018 .
[45] Jian Lin,et al. An effective hybrid biogeography-based optimization algorithm for the distributed assembly permutation flow-shop scheduling problem , 2016, Comput. Ind. Eng..
[46] Shih-Wei Lin,et al. Minimizing makespan for no-wait flowshop scheduling problems with setup times , 2018, Comput. Ind. Eng..
[47] N. Rajasekar,et al. Parameter extraction of two diode solar PV model using Fireworks algorithm , 2016 .
[48] Ping Zhang,et al. The high performing backtracking algorithm and heuristic for the sequence-dependent setup times flowshop problem with total weighted tardiness , 2016 .
[49] Rui Lin,et al. Relative entropy method for fuzzy multiple attribute decision making and its application to software quality evaluation , 2014, J. Intell. Fuzzy Syst..
[50] Chao Lu,et al. A hybrid multi-objective grey wolf optimizer for dynamic scheduling in a real-world welding industry , 2017, Eng. Appl. Artif. Intell..
[51] Qing Hui,et al. A hybrid ACO algorithm based on Bayesian factorizations and reinforcement learning for continuous optimization , 2016, 2016 IEEE Congress on Evolutionary Computation (CEC).
[52] Xiangtao Li,et al. Multiobjective Discrete Artificial Bee Colony Algorithm for Multiobjective Permutation Flow Shop Scheduling Problem With Sequence Dependent Setup Times , 2017, IEEE Transactions on Engineering Management.
[53] Ravi Kumar,et al. Fuzzy relative entropy based classification scheme for discrimination of odors/gases using a poorly selective sensor array , 2016, 2016 IEEE International Conference on Fuzzy Systems (FUZZ-IEEE).
[54] Marco César Goldbarg,et al. New VNS heuristic for total flowtime flowshop scheduling problem , 2012, Expert Syst. Appl..