Optimizing the Periodic Inspection Interval for a 1-out-of-2 Cold Standby System Using the Delay-Time Concept

In this article, we deal with a 1-out-of-2 system with a cold-standby component. The failure process of these two components is statistically identical and characterized by the delay-time concept, which divides the component's life into a two-stage process with a normal stage from new to a defect initiation point and a following failure delay stage from this point to failure. A fixed interval periodic inspection is carried out to check whether the working component is defective or not. If a defect is identified, the working component is shut down and sent to be repaired. The repair shop capacity is limited for repairing one component only. If the repair shop is occupied by the standby component (under repair) when the working one is failed, the system is shut down. There are five scenarios of the state of the system at an inspection epoch, which are derived analytically. The expected total cost per unit time of the system consists of the expected cost caused by preventive repair, unplanned failure repair, and system downtime. In this article, these three costs are determined and the optimal inspection interval with respect to the minimum of the expected total cost per unit time is found. To incorporate a nonexponential distribution for the normal time, delay stages, and repair time of the components, the elapsed time in the normal time, delay stages, and repair time at inspection is taken into consideration. A stationary distribution of the elapsed time exists, and it is calculated by an iteration method. Copyright © 2012 John Wiley & Sons, Ltd.

[1]  Ming J. Zuo,et al.  Optimal design of a repairable k-out-of-n system considering maintenance , 2011, 2011 Proceedings - Annual Reliability and Maintainability Symposium.

[2]  D. Pandey,et al.  Reliability analysis of a powerloom plant with cold standby for its strategic unit , 1996 .

[3]  A H Christer Modelling Inspection Policies for Building Maintenance , 1982, The Journal of the Operational Research Society.

[4]  Rose Baker,et al.  Estimating the delay-time distribution of faults in repairable machinery from failure data , 1991 .

[5]  R. Subramanyam Naidu,et al.  Stochastic behavior of a 1-server n-unit system subject to arbitrary failure, exponential inspection and repair , 1983 .

[6]  Pietro Cerone Inspection interval for maximum future reliability using the delay time model , 1993 .

[7]  Michael N. Chanin,et al.  Maintenance Float Policy: A Critical Component of Capacity Strategy , 1989 .

[8]  M. Zuo,et al.  Optimal Reliability Modeling: Principles and Applications , 2002 .

[9]  Wenbin Wang A model of multiple nested inspections at different intervals , 2000, Comput. Oper. Res..

[10]  Rommert Dekker,et al.  Preventive maintenance in a 1 out of n system: The uptime, downtime and costs , 1997 .

[11]  A. H. Christer,et al.  Modelling maintenance practice of production plant using the delay-time concept , 1995 .

[12]  W. Wang,et al.  Solution algorithms for a nonhomogeneous multi-component inspection model , 2003, Comput. Oper. Res..

[13]  Wenbin Wang,et al.  A multi-component and multi-failure mode inspection model based on the delay time concept , 2010, Reliab. Eng. Syst. Saf..

[14]  Wenbin Wang,et al.  A modelling procedure to optimize component safety inspection over a finite time horizon , 1997 .

[15]  Ming Jian Zuo,et al.  Availability of a general k-out-of-n: G system with non-identical components considering shut-off rules using quasi-birth-death process , 2011, Reliab. Eng. Syst. Saf..

[16]  Lev V. Utkin,et al.  Optimal reliability allocation of redundant units and repair facilities by arbitrary failure and repair distributions , 1995 .

[17]  Who Kee Chung A k-out-of-N:G redundant system with cold standby units and common-cause failures , 1984 .

[18]  Rose Baker,et al.  Developing and Testing the Delay-Time Model , 1993 .

[19]  A. H. Christer,et al.  Reducing Production Downtime Using Delay-Time Analysis , 1984 .

[20]  Wendai Wang,et al.  Reliability/availability of K-out-of-N system with M cold standby units , 2002, Annual Reliability and Maintainability Symposium. 2002 Proceedings (Cat. No.02CH37318).

[21]  Antoine Grall,et al.  Continuous-time predictive-maintenance scheduling for a deteriorating system , 2002, IEEE Trans. Reliab..

[22]  Shaomin Wu Optimal inspection policy for three-state systems monitored by variable sample size control charts , 2011 .

[23]  Hoang Pham,et al.  A Novel Approach for Optimal Cost-Effective Design of Complex Repairable Systems , 2007, IEEE Transactions on Systems, Man, and Cybernetics - Part A: Systems and Humans.

[24]  Mahmut Parlar,et al.  A survey of maintenance models for multi-unit systems , 1991 .

[25]  A. H. Christer,et al.  Problem identification in maintenance modelling: a case study , 2008 .

[26]  Gregory Levitin,et al.  Approximation algorithm for evaluating time-to-failure distribution of k-out-of-n system with shared standby elements , 2010, Reliab. Eng. Syst. Saf..