Short-term scheduling for multiproduct batch chemical plants
暂无分享,去创建一个
[1] P. E. Bigham,et al. Converging Branch Multi-Stage Production Schedules with Finite Production Rates and Start-up Delays , 1979 .
[2] T. Prabhakar. A Production Scheduling Problem with Sequencing Considerations , 1974 .
[3] Lawrence M. Seiford,et al. Production Runs for Multiple Products: The Full-Capacity Heuristic , 1980 .
[4] H. D. Ratliff,et al. Technical Note - A Production-Scheduling Problem with Batch Processing , 1974, Oper. Res..
[5] Robert J Willis,et al. Schedule Based M.R.P.: An Integrated Approach to Production Scheduling and Material Requirements Planning , 1982 .
[6] S. S. Law,et al. A Method for Single Facility Multiple Products Scheduling , 1980 .
[7] M. G. Korgaonker. Integrated Production Inventory Policies for Multistage Multiproduct Batch Production Systems , 1979 .
[8] Gabriel R. Bitran,et al. Hierarchical Production Planning: A Two-Stage System , 1982, Oper. Res..
[9] K. Hitomi. Optimization of multistage production systems with variable production times and costs , 1977 .
[10] B. J. Lageweg,et al. A General Bounding Scheme for the Permutation Flow-Shop Problem , 1978, Oper. Res..
[11] Matthew J. Liberatore,et al. Using MRP and EOQ/Safety Stock for Raw Materials Inventory Control: Discussion and Case Study , 1979 .