暂无分享,去创建一个
[1] D. Malcolm,et al. Application of a Technique for Research and Development Program Evaluation , 1959 .
[2] Hélène Fargier,et al. Fuzzy PERT in series-parallel graphs , 2000, Ninth IEEE International Conference on Fuzzy Systems. FUZZ- IEEE 2000 (Cat. No.00CH37063).
[3] Matthew J. Liberatore,et al. Critical Path Analysis With Fuzzy Activity Times , 2008, IEEE Transactions on Engineering Management.
[4] S. Chanas,et al. THE USE OF FUZZY VARIABLES IN PERT , 1981 .
[5] Pawel Zielinski,et al. Critical path analysis in the network with fuzzy activity times , 2001, Fuzzy Sets Syst..
[6] Pawel Zielinski,et al. The computational complexity of the criticality problems in a network with interval activity times , 2002, Eur. J. Oper. Res..
[7] A. I. Slyeptsov,et al. A Method of Computation of Characteristics of Operations in a Problem of Fuzzy Network Planning and Management , 2003 .
[8] L. Zadeh. Calculus of fuzzy restrictions , 1996 .
[9] M. Mares,et al. Computation Over Fuzzy Quantities , 1994 .
[10] Stefan Chanas,et al. On the hardness of evaluating criticality of activities in a planar network with duration intervals , 2003, Oper. Res. Lett..
[11] Didier Dubois,et al. On the sure criticality of tasks in activity networks with imprecise durations , 2002, IEEE Trans. Syst. Man Cybern. Part B.
[12] James E. Kelley,et al. Critical-Path Planning and Scheduling: Mathematical Basis , 1961 .
[13] Heinrich Rommelfanger. Network analysis and information flow in fuzzy environment , 1994 .
[14] Madan M. Gupta,et al. Approximate reasoning in decision analysis , 1982 .
[15] Dorota Kuchta,et al. Discrete fuzzy optimization , 1999 .
[16] Didier Dubois,et al. On latest starting times and floats in activity networks with ill-known durations , 2003, Eur. J. Oper. Res..
[17] Stefan Chanas. FUZZY SETS IN FEW CLASSICAL OPERATIONAL RESEARCH PROBLEMS , 1993 .
[18] Pawel Zielinski,et al. On computing the latest starting times and floats of activities in a network with imprecise durations , 2005, Fuzzy Sets Syst..
[19] F. Lootsma. Stochastic and Fuzzy Pert , 1989 .
[20] S. H. Nasution. Fuzzy Critical Path Method , 1994, IEEE Trans. Syst. Man Cybern. Syst..
[21] Roman Slowinski,et al. Fuzzy priority heuristics for project scheduling , 1996, Fuzzy Sets Syst..