Optimal planning of oil and gas development projects considering long-term production and transmission

Abstract This paper proposes an integrated model for making a group of strategic decisions about oil and gas development projects simultaneously over a long-term planning horizon. These decisions involve: selection of field and pipeline development projects, scheduling of selected projects, production planning, and upstream transmission planning. The proposed model is formulated as a linear mixed-integer-programming model. It is implemented in a case study to demonstrate its usefulness and applicability in practice. Finally, a number of sensitivity analyses are carried out to analyze the impact of most influential uncertainties on the solutions and the corresponding results are discussed.

[1]  Global Optimization of Oil Production Systems, A Unified Operational View , 2001 .

[2]  Andrea Sundby Langvik,et al.  Optimization of Oil Production - Applied to the Marlim Field , 2012 .

[3]  R. N. Horne,et al.  Multivariate optimization of production systems: The time dimension , 1993 .

[4]  Nina Linn Ulstein,et al.  Tactical planning of offshore petroleum production , 2007, Eur. J. Oper. Res..

[5]  Gaute Rannem Johansen Optimization of offshore natural gas field development , 2011 .

[6]  Bjørn Nygreen,et al.  Applied Mathematical Programming in Norwegian Petroleum Field and Pipeline Development: Some Highlights from the Last 30 Years , 2010 .

[7]  M. M. Orman,et al.  Applying modern portfolio theory to upstream investment decision making , 1999 .

[8]  Erlend Torgnes,et al.  Petroleum production planning optimization: Applied to the StatoilHydro offshore oil and gas field Troll West , 2009 .

[9]  Pengju Wang,et al.  Development and applications of production optimization techniques for petroleum fields , 2003 .

[10]  Santanu Barua,et al.  Application of a General-Purpose Network Optimizer to Oil and Gas Production , 1997 .

[11]  Kunal Dutta-Roy,et al.  Computer-Aided Gas Field Planning and Optimization , 1997 .

[12]  K. Aziz,et al.  Optimization of Production Operations in Petroleum Fields , 2002 .

[13]  J. G. Ross Risk and uncertainty in portfolio characterisation , 2004 .

[14]  Papsrpsarapprowd Fob,et al.  A Generalized Well-Management Scheme for Reservoir Simulation , 1996 .

[15]  V. Kumar,et al.  A Decision Support System for Prioritizing Oil and Gas Exploration Activities , 1990, Oper. Res..

[16]  K. K. Lo,et al.  Use of Well Management Schemes for Rate Forecasts , 1992 .

[17]  Dag Haugland,et al.  Mathematical and computer modelling reports: Models for petroleum field exploitation , 1988 .

[18]  R. Horne,et al.  Multivariate Optimization of Production Systems , 1992 .

[19]  K. Jörnsten Sequencing offshore oil and gas fields under uncertainty , 1992 .

[20]  H. D. Attra,et al.  Application of Optimizing Techniques for Studying Field Producing Operations , 1961 .

[21]  Arne Bang Huseby,et al.  Multi-reservoir production optimization , 2009, Eur. J. Oper. Res..

[22]  Kjetil K. Haugen,et al.  A Stochastic Dynamic Programming model for scheduling of offshore petroleum fields with resource uncertainty , 1996 .

[23]  José M. Pinto,et al.  A general modeling framework for the operational planning of petroleum supply chains , 2004, Comput. Chem. Eng..

[24]  Colin Atkinson,et al.  A mathematical model of an oil and gas field development process , 2010, European Journal of Applied Mathematics.

[25]  Roland N. Horne,et al.  Reservoir Development and Design Optimization , 1997 .

[26]  Erik Demeulemeester,et al.  Project scheduling : a research handbook , 2002 .

[27]  Roland N. Horne,et al.  Multivariate Optimization of Networked Production Systems , 1995 .

[28]  Seyed Ali Torabi,et al.  A REVIEW OF MATHEMATICAL OPTIMIZATION APPLICATIONS IN OIL-AND-GAS UPSTREAM & MIDSTREAM MANAGEMENT , 2013 .

[29]  Aie World Energy Outlook 2011 , 2001 .

[30]  Kamy Sepehrnoori,et al.  Optimal Hydrocarbon Reservoir Production Policies , 1986, Oper. Res..

[31]  Dale Doty,et al.  An Improved Method for Gas Lift Allocation Optimization , 1995 .

[32]  John M. Bohannon,et al.  A Linear Programming Model for Optimum Development of Multi-Reservoir Pipeline Systems , 1970 .

[33]  M.C.A. Carvalho,et al.  An MILP model and solution technique for the planning of infrastructure in offshore oilfields , 2006 .

[34]  Marielle Christiansen,et al.  Modeling Norwegian petroleum productionand transportation , 1998, Ann. Oper. Res..

[35]  Kunal Dutta-Roy,et al.  A New Approach to Gas-Lift Allocation Optimization , 1997 .

[36]  Steven A. Gabriel,et al.  Interdependencies Among E&P Projects and Portfolio Risk Management , 1999 .

[37]  George Mavrotas,et al.  Effective implementation of the epsilon-constraint method in Multi-Objective Mathematical Programming problems , 2009, Appl. Math. Comput..

[38]  Leon S. Lasdon,et al.  Development Planning and Management of Petroleum Reservoirs Using Tank Models and Nonlinear Programming , 1984, Oper. Res..

[39]  Roland N. Horne,et al.  Nonlinear optimization of well production considering gas lift and phase behavior , 1996 .

[40]  J. S. Aronofsky,et al.  A Linear Programming Model for Scheduling Crude Oil Production , 1958 .

[41]  Jianzhong Zhang,et al.  A Bilevel Programming Method for Pipe Network Optimization , 1996, SIAM J. Optim..

[42]  Kurt Jörnsten,et al.  A mathematical programming model for the development of petroleum fields and transport systems , 1989 .

[43]  Michael R. Walls,et al.  Combining decision analysis and portfolio management to improve project selection in the exploration and production firm , 2004 .

[44]  A. Herrán,et al.  A mathematical model for planning transportation of multiple petroleum products in a multi-pipeline system , 2010, Comput. Chem. Eng..

[45]  Louis J. Durlofsky,et al.  Optimization of Nonconventional Well Type, Location, and Trajectory , 2003 .

[46]  Dale Doty,et al.  An Improved Method for Gas Lift Allocation Optimization , 1995 .

[47]  Marielle Christiansen,et al.  Well management in the North Sea , 1993, Ann. Oper. Res..

[48]  Bjarne A. Foss,et al.  Oil production optimization - A piecewise linear model, solved with two decomposition strategies , 2010, Comput. Chem. Eng..

[49]  Kunal Dutta-Roy,et al.  Surface Facilities Management for Thermal Recovery Processes , 1997 .

[50]  Bjarne A. Foss,et al.  Integrated field operation and optimization , 2012 .