On the alignment of lot sizing decisions in a remanufacturing system in the presence of random yield
暂无分享,去创建一个
[1] Nikolaos V. Sahinidis,et al. Accelerating Branch-and-Bound through a Modeling Language Construct for Relaxation-Specific Constraints , 2005, J. Glob. Optim..
[2] M. Toffel. Strategic Management of Product Recovery , 2004 .
[3] Luk N. Van Wassenhove,et al. So What If Remanufacturing Cannibalizes My New Product Sales? , 2010 .
[4] D. Schrady. A deterministic inventory model for reparable items , 1967 .
[5] R. Dekker,et al. Reverse logistics : quantitative models for closed-loop supply chains , 2004 .
[6] Hau L. Lee,et al. Lot Sizing with Random Yields: A Review , 1995, Oper. Res..
[7] K. Inderfurth,et al. How to set the holding cost rates in average cost inventory models with reverse logistics , 2000 .
[8] Ioannis Konstantaras,et al. A note on: Developing an exact solution for an inventory system with product recovery , 2008 .
[9] R. Teunter. Economic ordering quantities for recoverable item inventory systems , 2001 .
[10] K. Richter,et al. Analysis of the EOQ repair and waste disposal problem with integer setup numbers , 1999 .
[11] Karl Inderfurth,et al. Heuristics for solving disassemble-to-order problems with stochastic yields , 2006, OR Spectr..
[12] Tobias Schulz,et al. A new Silver–Meal based heuristic for the single-item dynamic lot sizing problem with returns and remanufacturing , 2011 .
[13] Marc Salomon,et al. Strategic Issues in Product Recovery Management , 1995 .
[14] Scott Webster,et al. Competitive strategy in remanufacturing and the impact of take-back laws , 2007 .
[15] Ruud H. Teunter,et al. Dynamic lot sizing with product returns and remanufacturing , 2006 .
[16] Ruud H. Teunter,et al. Economic Lot Scheduling Problem with Returns , 2006 .
[17] Stefan Minner,et al. Lot Sizing Decisions in Product Recovery Management , 2004 .
[18] K. Richter. The extended EOQ repair and waste disposal model , 1996 .
[19] L LeeHau,et al. Lot Sizing with Random Yields , 1995 .
[20] R. W. Grubbström,et al. Considering stochastic lead times in a manufacturing/remanufacturing system with deterministic demands and returns , 2005 .
[21] Ruud H. Teunter,et al. Lot-sizing for inventory systems with product recovery , 2003, Comput. Ind. Eng..
[22] Yigal Gerchak,et al. Multiple Lotsizing in Production to Order with Random Yields: Review of Recent Advances , 2004, Ann. Oper. Res..
[23] Margarete A. Seitz,et al. Challenging the implementation of corporate sustainability: The case of automotive engine remanufacturing , 2006, Bus. Process. Manag. J..
[24] Geraldo Ferrer. Yield information and supplier responsiveness in remanufacturing operations , 2003, Eur. J. Oper. Res..
[25] Reha Uzsoy,et al. Experimental Evaluation of Heuristic Optimization Algorithms: A Tutorial , 2001, J. Heuristics.