On the alignment of lot sizing decisions in a remanufacturing system in the presence of random yield

In the area of reverse logistics, remanufacturing has been proven to be a valuable option for product recovery. In many industries, each step of the products' recovery is carried out in lot sizes which leads to the assumption that for each of the different recovery steps some kind of fixed costs prevail. Furthermore, holding costs can be observed for all recovery states of the returned product. Although several authors study how the different lot sizes in a remanufacturing system shall be determined, they do not consider the specificity of the remanufacturing process itself. Thus, the disassembly operations which are always neglected in former analyses are included in this contribution as a specific recovery step. In addition, the assumption of deterministic yields (number of reworkable components obtained by disassembly) is extended in this work to study the system behavior in a stochastic environment. Three different heuristic approaches are presented for this environment that differ in their degree of sophistication. The least sophisticated method ignores yield randomness and uses the expected yield fraction as certainty equivalent. As a numerical experiment shows, this method already yields fairly good results in most of the investigated problem instances in comparison to the other heuristics which incorporate yield uncertainties. However, there exist instances for which the performance loss between the least and the most sophisticated heuristic approach amounts to more than 6%.

[1]  Nikolaos V. Sahinidis,et al.  Accelerating Branch-and-Bound through a Modeling Language Construct for Relaxation-Specific Constraints , 2005, J. Glob. Optim..

[2]  M. Toffel Strategic Management of Product Recovery , 2004 .

[3]  Luk N. Van Wassenhove,et al.  So What If Remanufacturing Cannibalizes My New Product Sales? , 2010 .

[4]  D. Schrady A deterministic inventory model for reparable items , 1967 .

[5]  R. Dekker,et al.  Reverse logistics : quantitative models for closed-loop supply chains , 2004 .

[6]  Hau L. Lee,et al.  Lot Sizing with Random Yields: A Review , 1995, Oper. Res..

[7]  K. Inderfurth,et al.  How to set the holding cost rates in average cost inventory models with reverse logistics , 2000 .

[8]  Ioannis Konstantaras,et al.  A note on: Developing an exact solution for an inventory system with product recovery , 2008 .

[9]  R. Teunter Economic ordering quantities for recoverable item inventory systems , 2001 .

[10]  K. Richter,et al.  Analysis of the EOQ repair and waste disposal problem with integer setup numbers , 1999 .

[11]  Karl Inderfurth,et al.  Heuristics for solving disassemble-to-order problems with stochastic yields , 2006, OR Spectr..

[12]  Tobias Schulz,et al.  A new Silver–Meal based heuristic for the single-item dynamic lot sizing problem with returns and remanufacturing , 2011 .

[13]  Marc Salomon,et al.  Strategic Issues in Product Recovery Management , 1995 .

[14]  Scott Webster,et al.  Competitive strategy in remanufacturing and the impact of take-back laws , 2007 .

[15]  Ruud H. Teunter,et al.  Dynamic lot sizing with product returns and remanufacturing , 2006 .

[16]  Ruud H. Teunter,et al.  Economic Lot Scheduling Problem with Returns , 2006 .

[17]  Stefan Minner,et al.  Lot Sizing Decisions in Product Recovery Management , 2004 .

[18]  K. Richter The extended EOQ repair and waste disposal model , 1996 .

[19]  L LeeHau,et al.  Lot Sizing with Random Yields , 1995 .

[20]  R. W. Grubbström,et al.  Considering stochastic lead times in a manufacturing/remanufacturing system with deterministic demands and returns , 2005 .

[21]  Ruud H. Teunter,et al.  Lot-sizing for inventory systems with product recovery , 2003, Comput. Ind. Eng..

[22]  Yigal Gerchak,et al.  Multiple Lotsizing in Production to Order with Random Yields: Review of Recent Advances , 2004, Ann. Oper. Res..

[23]  Margarete A. Seitz,et al.  Challenging the implementation of corporate sustainability: The case of automotive engine remanufacturing , 2006, Bus. Process. Manag. J..

[24]  Geraldo Ferrer Yield information and supplier responsiveness in remanufacturing operations , 2003, Eur. J. Oper. Res..

[25]  Reha Uzsoy,et al.  Experimental Evaluation of Heuristic Optimization Algorithms: A Tutorial , 2001, J. Heuristics.