Optimum sizing of wind-battery systems incorporating resource uncertainty

The inherent uncertainty of the wind is a major impediment for successful implementation of wind based power generation technology. A methodology has been proposed in this paper to incorporate wind speed uncertainty in sizing wind-battery system for isolated applications. The uncertainty associated with the wind speed is incorporated using chance constraint programming approach. For a pre-specified reliability requirement, a deterministic equivalent energy balance equation may be derived from the chance constraint that allows time series simulation of the entire system. This results in a generation of the entire set of feasible design options, satisfying different system level constraints, on a battery capacity vs. generator rating diagram, also known as the design space. The proposed methodology highlights the trade-offs between the wind turbine rating, rotor diameter and the battery size for a given reliability of power supply. The optimum configuration is chosen on the basis of the minimum cost of energy (US$/kWh). It is shown with the help of illustrative examples that the proposed methodology is generic and flexible to incorporate alternate sub-component models.

[1]  A. Louche,et al.  Decentralized wind energy systems providing small electrical loads in remote areas , 2001 .

[2]  Rangan Banerjee,et al.  Optimum sizing of battery-integrated diesel generator for remote electrification through design-space approach , 2008 .

[3]  S. C. Mullick,et al.  Techno-economics of small wind electric generator projects for decentralized power supply in India , 2007 .

[4]  Orhan Ekren,et al.  Break-even analysis and size optimization of a PV/wind hybrid energy conversion system with battery storage - A case study , 2009 .

[5]  W. R. Powell,et al.  An analytical expression for the average output power of a wind machine , 1981 .

[6]  John K. Kaldellis,et al.  Sizing a hybrid wind-diesel stand-alone system on the basis of minimum long-term electricity production cost , 2006 .

[7]  A. Charnes,et al.  Chance-Constrained Programming , 1959 .

[8]  G. T. Polley,et al.  Heat Exchanger Design Through Parameter Plotting , 1996 .

[9]  John K. Kaldellis,et al.  Parametric investigation concerning dimensions of a stand-alone wind-power system , 2004 .

[10]  Fushuan Wen,et al.  A chance constrained programming approach to transmission system expansion planning , 2005 .

[11]  P. S. Kulkarni,et al.  A case study of solar photovoltaic power system at Sagardeep Island, India , 2009 .

[12]  A.F. Gubina,et al.  Unified Approach to Reliability Assessment in an Isolated RES System , 2006, 2006 International Conference on Probabilistic Methods Applied to Power Systems.

[13]  S. C. Mullick,et al.  Providing electricity access to remote areas in India: An approach towards identifying potential areas for decentralized electricity supply , 2008 .

[14]  Orhan Ekren,et al.  Size optimization of a PV/wind hybrid energy conversion system with battery storage using simulated annealing , 2010 .

[15]  S. Bandyopadhyay,et al.  Determination of design space and optimization of solar water heating systems , 2007 .

[16]  Wei Zhou,et al.  A novel optimization sizing model for hybrid solar-wind power generation system , 2007 .

[17]  Santanu Bandyopadhyay,et al.  Optimum Design of Battery-Integrated Diesel Generator Systems Incorporating Demand Uncertainty , 2009 .

[18]  K. Ashenayi,et al.  A knowledge-based approach to the design of integrated renewable energy systems , 1992 .

[19]  Shireesh B. Kedare,et al.  Design of solar thermal systems utilizing pressurized hot water storage for industrial applications , 2008 .

[20]  Orhan Ekren,et al.  Size optimization of a PV/wind hybrid energy conversion system with battery storage using response surface methodology , 2008 .

[21]  Ziyad M. Salameh,et al.  Methodology for optimally sizing the combination of a battery bank and PV array in a wind/PV hybrid system , 1996 .

[22]  Guohe Huang,et al.  Community-scale renewable energy systems planning under uncertainty—An interval chance-constrained programming approach , 2009 .

[23]  Roy Billinton,et al.  Incorporating reliability index distributions in small isolated generating system reliability performance assessment , 2004 .

[24]  Christian Langer,et al.  A method for the identification of configurations of PV/wind hybrid systems for the reliable supply of small loads , 1996 .

[25]  Roy Billinton,et al.  Capacity reserve assessment using system well-being analysis , 1999 .

[26]  Ziyad M. Salameh,et al.  Sizing of a stand-alone hybrid wind-photovoltaic system using a three-event probability density approximation , 1996 .

[27]  Ziyad M. Salameh,et al.  Dynamic response of a stand-alone wind energy conversion system with battery energy storage to a wind gust , 1997 .

[28]  H. Nfaoui,et al.  Modelling of a wind/diesel system with battery storage for Tangiers, Morocco , 1994 .

[29]  Athanasios Papoulis,et al.  Probability, Random Variables and Stochastic Processes , 1965 .

[30]  S. M. Shaahid,et al.  Optimal sizing of battery storage for hybrid (wind+diesel) power systems , 1999 .

[31]  Santanu Bandyopadhyay,et al.  Optimization of solar water heating systems through water replenishment , 2009 .

[32]  Cw W. Yu,et al.  An investigation of reactive power planning based on chance constrained programming , 2007 .

[33]  Thomas Degner,et al.  Assessing the maximum fuel savings obtainable in simple wind-diesel systems , 1997 .

[34]  Saifur Rahman,et al.  Unit sizing and control of hybrid wind-solar power systems , 1997 .

[35]  Santanu Bandyopadhyay,et al.  Optimum sizing of photovoltaic battery systems incorporating uncertainty through design space approach , 2009 .

[36]  Walter G. Scott,et al.  Distributed Power Generation Planning and Evaluation , 2000 .

[37]  Ali Naci Celik,et al.  Techno-economic analysis of autonomous PV-wind hybrid energy systems using different sizing methods , 2003 .

[38]  Getachew Bekele,et al.  Feasibility study for a standalone solar–wind-based hybrid energy system for application in Ethiopia , 2010 .

[39]  H. Beyer,et al.  Operational behaviour of wind diesel systems incorporating short-term storage: An analysis via simulation calculations , 1995 .

[40]  G. L. Johnson,et al.  Wind energy systems , 1985 .

[41]  Salvina Gagliano,et al.  Hybrid solar/wind power system probabilistic modelling for long-term performance assessment , 2006 .

[42]  B. J. Brinkworth,et al.  Sizing and techno-economical optimization for hybrid solar photovoltaic/wind power systems with battery storage , 1997 .

[43]  James F. Manwell,et al.  A combined probabilistic/time series model for wind diesel systems simulation , 1994 .

[44]  P. B. S. Lissaman,et al.  Applied Aerodynamics of Wind Power Machines , 1974, Renewable Energy.

[45]  A. A. Abou El-Ela,et al.  Optimal planning of wind—diesel generation units in an isolated area , 1991 .

[46]  Wenyuan Li,et al.  Reliability Assessment of Electric Power Systems Using Monte Carlo Methods , 1994 .

[47]  R. Billinton,et al.  Cost-effective wind energy utilization for reliable power supply , 2004, IEEE Transactions on Energy Conversion.

[48]  T. Markvart Sizing of hybrid photovoltaic-wind energy systems , 1996 .

[49]  A Mani,et al.  Wind energy data for India , 1983 .

[50]  Santanu Bandyopadhyay,et al.  Application of design space methodology for optimum sizing of wind–battery systems , 2009 .