Tunneling with full face shielded machines: A study on the backfilling of the tail void
暂无分享,去创建一个
In mechanized tunneling the annular gap between the segmental lining and the surrounding soil caused by tunnel driving, must be backfilled almost instantaneously with an adequate grouting mortar. The objective of this research is to perform a fully three dimensional modeled parametric study using FLAC 3D and evaluate the effects of backfill grouting on the tunneling performance. The research focuses on comparisons between different injection materials and state-of-the-art Bi-Component grout and their effects on the settlements on the surface. The research consists of testing a regular situation of tunnel excavation using a shielded machine with face under pressure. The tunnel dimensions and the soil properties are selected as close as possible to the reality and based on Turin Metro case.
[1] Günther Meschke,et al. On the influence of face pressure, grouting pressure and TBM design in soft ground tunnelling , 2006 .
[2] Günther Meschke,et al. A 3D finite element simulation model for TBM tunnelling in soft ground , 2004 .
[3] Günther Meschke,et al. A numerical study of the effect of soil and grout material properties and cover depth in shield tunnelling , 2006 .
[4] Daniele Peila,et al. The behaviour of a two-component backfilling grout used in a Tunnel-Boring Machine , 2011 .