Determination method for loss‐minimum configuration considering reconnection of distributed generators
暂无分享,去创建一个
Yasuhiro Hayashi | Hirotaka Takano | Junya Matsuki | Takafumi Tomida | Y. Hayashi | J. Matsuki | H. Takano | T. Tomida
[1] Akihiko Yokoyama. 総論;総論;General Remarks , 2005 .
[2] Takao Hirai,et al. Technical Issues Concerning Interconnection due to Increase of Distributed Generators , 2005 .
[3] M. Kitagawa,et al. Implementation of genetic algorithm for distribution systems loss minimum re-configuration , 1992 .
[4] Hiromu Kobayashi. Development Trend and Subjects of New Distribution Network Technology , 2004 .
[5] Masahide Hojo,et al. Active coordinated operation of distribution network system for many connections of distributed generators , 2007 .
[6] Yasuhiro Hayashi,et al. Computation of locational and hourly maximum output of a distributed generator connected to a distribution feeder , 2006 .
[7] S. S. Venkata,et al. An expert system operational aid for restoration and loss reduction of distribution systems , 1988 .
[8] Yasuhiro Hayashi,et al. Service Restoration Method Considering Simultaneous Disconnection of Distributed Generators by One Bank Fault of Distribution System , 2006 .
[9] J. Matsuki,et al. Loss minimum configuration of distribution system considering N-1 security of dispersed generators , 2004, IEEE Transactions on Power Systems.
[10] Koichi Nara,et al. Method for Loss Minimum Re-configuration Problem of Distribution System by Tabu Search , 2003 .
[11] R. Taleski,et al. Distribution network reconfiguration for energy loss reduction , 1997 .
[12] Yasuhiro Hayashi,et al. Determination Method of Loss-Minimum Configuration with Mathematical Optimality in a Three Sectionalized and Three Connected Distribution Feeder Network , 2006 .