Evaluating the Critical Success Factors of Industrialised Building System Implementation in Nigeria: The Stakeholders’ Perception

Globally, the adoption of Industrialised building system (IBS) has been acknowledged as a panacea for housing delivery performance. However, in most developing nations, especially Nigeria, its successful adoption is confronted with myriad of factors that are differently perceived by stakeholders resulting in poor performance and low uptake. The focus of this study is, therefore, to identify and evaluate those inhibiting factors as perceived by key construction stakeholders in the Nigerian construction industry. Initially, sixty-four (64) factors were identified through literature and structured interview. After which, a panel of experts, through Delphi method, considered forty-seven (47) of the factors contextual to IBS performance in Nigeria. 210 (70%) multidisciplinary construction professionals responded to the 300 administered questionnaires anchored on a Likert scale of I-5, (1-least significant to 5-Most Significant). Mean score approach was employed for data analysis. All the success factors were perceived to be critical. However, while forty (40) factors were perceived to excise high influence, seven (7) factors were found to moderately influence IBS performance. The five (5) critical success factors (CSFs) based on mean score (MS) are; Clear and precise goals (3.986), knowledge & skills (3.976), planning & control (3.948), top management support (3.938), and transportation (3.924). Having the knowledge of factors critical to IBS performance will assist key stakeholders' in their decision-making towards achieving effective project delivery.

[1]  J. Jacoby,et al.  Is There an Optimal Number of Alternatives for Likert Scale Items? Study I: Reliability and Validity , 1971 .

[2]  M. Arif,et al.  Making a case for offsite construction in China , 2010 .

[3]  A. Ogwueleka The critical success factors influencing project performance in Nigeria , 2011 .

[4]  Kamarul Anuar Mohamad Kamar,et al.  Industrialized Building Systems: Strategic Outlook for Manufactured Construction in Malaysia , 2012 .

[5]  R. Reed,et al.  Factors impeding the offsite production of housing construction in China: an investigation of current practice , 2014 .

[6]  Malik M.A. Khalfan,et al.  Current State of Off-Site Manufacturing in Australian and Chinese Residential Construction , 2014 .

[7]  Mohd Sapuan Salit,et al.  THE EXPERIENCES OF MALAYSIA AND OTHER COUNTRIES IN INDUSTRIALISED BUILDING SYSTEM , 2022 .

[8]  Sherif Ali Mohtady Mohamed,et al.  Factors affecting the performance of construction projects in the Gaza Strip , 2009 .

[9]  Jack Steven Goulding,et al.  Review of Motivations, Success Factors, and Barriers to the Adoption of Offsite Manufacturing in Nigeria , 2017 .

[10]  George Ofori,et al.  Building waste assessment score: design-based tool , 2004 .

[11]  Albert P.C. Chan,et al.  Developing a benchmark model for project construction time performance in Hong Kong , 2004 .

[12]  Alistair G.F. Gibb,et al.  Future opportunities for offsite in the UK , 2007 .

[13]  C. S Lim,et al.  Criteria of project success: an exploratory re-examination , 1999 .

[14]  Ron Wakefield,et al.  Drivers, constraints and the future of offsite manufacture in Australia , 2007 .

[15]  Chi Sun Poon,et al.  Sustainable construction aspects of using prefabrication in dense urban environment: a Hong Kong case study , 2008 .

[16]  Jack Steven Goulding,et al.  Offsite Manufacturing Construction: A Big Opportunity for Housing Delivery in Nigeria , 2014 .

[17]  J. Jacoby,et al.  Three-Point Likert Scales Are Good Enough , 1971 .

[18]  J. Dawes Do Data Characteristics Change According to the Number of Scale Points Used? An Experiment Using 5-Point, 7-Point and 10-Point Scales , 2008 .

[19]  Paul. Olomolaiye,et al.  Critical success criteria for mass house building projects in developing countries , 2008 .

[20]  Ahmad Baharuddin Abd. Rahman,et al.  Issues and challenges in the implementation of Industrialised Building Systems in Malaysia , 2006 .

[21]  Jalan Pahang,et al.  BARRIERS TO INDUSTRIALIZED BUILDING SYSTEM (IBS): THE CASE OF MALAYSIA , 2009 .

[22]  Andrew R.J. Dainty,et al.  Perspectives of UK housebuilders on the use of offsite modern methods of construction , 2007 .

[23]  A. Jiboye Urbanization challenges and housing delivery in Nigeria: The need for an effective Policy framework for Sustainable Development , 2010 .

[24]  Akintola Akintoye,et al.  Analysis of factors influencing project cost estimating practice , 2000 .