Modeling the Impacts of Traffic Flow Arrival Profiles on Ramp Metering Queues

An adequate queue storage length is critical for a metered on-ramp to prevent ramp queue spillback to the upstream signalized intersection. Previous research on queue length estimation or queue storage length design at metered ramps has not taken into account the potential impact of various on-ramp traffic flow arrival profiles on ramp queue lengths. This paper depicts the traffic flow arrival profiles and queue generation processes at three different metered ramp categories. Based on a large number of microscopic simulation runs, it is found that, under a given demand-to-capacity scenario, the queue at a metered ramp with two on-ramp feeding movements is more likely to be cleared in a cycle than at a metered ramp with three on-ramp feeding movements. Also, the platoon dispersion effect significantly reduces the ramp queue length, and hence the queue storage needs at a metered ramp. In addition, this paper reveals that ramp queue length tends to increase linearly with upstream signal cycle length. The design of queue storage length for a metered on-ramp hence needs to fully consider the various ramp configurations and upstream signal timing settings.

[1]  Edward Chung,et al.  Traffic Queue Estimation for Metered Motorway On-Ramps through use of Loop Detector Time Occupancies , 2013 .

[2]  Nagui M. Rouphail,et al.  OVERFLOW QUEUES AND DELAYS WITH RANDOM AND PLATOONED ARRIVALS AT SIGNALIZED INTERSECTIONS , 1994 .

[3]  David M Levinson,et al.  Ramp Metering and Freeway Bottleneck Capacity , 2009 .

[4]  Xinkai Wu,et al.  Improving Queue Size Estimation for Minnesota's Stratified Zone Metering Strategy , 2007 .

[5]  Kevin Balke,et al.  Modeling Impact of Ramp Metering Queues on Diamond Interchange Operations , 2004 .

[6]  Jingcheng Wu,et al.  Methodologies for Estimating Vehicle Queue Length at Metered On-Ramps , 2008 .

[7]  Mark Vandehey,et al.  Predicting Arrival Flow Profiles and Platoon Dispersion for Urban Street Segments , 2010 .

[8]  Kaan Ozbay,et al.  Quantifying effects of ramp metering on freeway safety. , 2006, Accident; analysis and prevention.

[9]  Michael J. Cassidy,et al.  Increasing Capacity of an Isolated Merge by Metering its On-Ramp , 2004 .

[10]  David M Levinson,et al.  Ramp Meters on Trial: Evidence from the Twin Cities Metering Holiday , 2006 .

[11]  Pravin Varaiya,et al.  Analysis of Queue Estimation Methods Using Wireless Magnetic Sensors , 2011 .

[12]  Alexander Skabardonis,et al.  Prediction of Arrival Profiles and Queue Lengths along Signalized Arterials by using a Markov Decision Process , 2005 .

[13]  Zong Tian,et al.  Queue length estimation at metered freeway‐to‐freeway connectors , 2016 .

[14]  Markos Papageorgiou,et al.  Real-time estimation of vehicle-count within signalized links , 2008 .

[15]  Markos Papageorgiou,et al.  Freeway ramp metering: an overview , 2002, IEEE Trans. Intell. Transp. Syst..

[16]  Feng-Bor Lin,et al.  Variations in Queue Discharge Patterns and Their Implications in Analysis of Signalized Intersections , 2004 .