Stochastic scheduling of an automated two-machine robotic cell with in-process inspection system
暂无分享,去创建一个
[1] Atabak Elmi,et al. A scheduling problem in blocking hybrid flow shop robotic cells with multiple robots , 2013, Comput. Oper. Res..
[2] Dvir Shabtay,et al. A combined robot selection and scheduling problem for flow-shops with no-wait restrictions , 2014 .
[3] Linguo Gong,et al. The effect of testing errors on a repetitive testing process , 2012, Eur. J. Oper. Res..
[4] Mehmet Savsar,et al. A stochastic model for the analysis of a two-machine flexible manufacturing cell , 2005, Comput. Ind. Eng..
[5] Feng Chu,et al. Series production in a basic re-entrant shop to minimize makespan or total flow time , 2010, Comput. Ind. Eng..
[6] Cengiz Kahraman,et al. Modeling a flexible manufacturing cell using stochastic Petri nets with fuzzy parameters , 2010, Expert Syst. Appl..
[7] H. Neil Geismar,et al. Robotic cells with stochastic processing times , 2010 .
[8] Kouroush Jenab,et al. Cycle time analysis in reentrant robotic cells with swap ability , 2012 .
[9] Ali Allahverdi,et al. A survey of scheduling problems with no-wait in process , 2016, Eur. J. Oper. Res..
[10] Marie-Ange Manier,et al. A linear optimization approach to the heterogeneous r-cyclic hoist scheduling problem , 2013, Comput. Ind. Eng..
[11] T. C. Edwin Cheng,et al. Complexity of cyclic scheduling problems: A state-of-the-art survey , 2010, Comput. Ind. Eng..
[12] Christian Bierwirth,et al. A heuristic scheduling procedure for multi-item hoist production lines , 2007 .
[13] Nadia Brauner. Identical part production in cyclic robotic cells: Concepts, overview and open questions , 2008, Discret. Appl. Math..
[14] Chengbin Chu,et al. Robust optimization for the cyclic hoist scheduling problem , 2015, Eur. J. Oper. Res..
[15] Kouroush Jenab,et al. Productivity analysis in a robotic cell , 2009 .
[16] Chengbin Chu,et al. Multi-degree cyclic scheduling of two robots in a no-wait flowshop , 2005, IEEE Transactions on Automation Science and Engineering.
[17] Celik Parkan,et al. Decision-making and performance measurement models with applications to robot selection , 1999 .
[18] Biswajit Sarkar,et al. Product inspection policy for an imperfect production system with inspection errors and warranty cost , 2016, Eur. J. Oper. Res..
[19] Pengyu Yan,et al. Hybrid discrete differential evolution algorithm for biobjective cyclic hoist scheduling with reentrance , 2016, Comput. Oper. Res..
[20] Wieslaw Kubiak,et al. Sequencing of parts and robot moves in a robotic cell , 1989 .
[21] Mario F. M. Campos,et al. Bi-objective data gathering path planning for vehicles with bounded curvature , 2017, Comput. Oper. Res..
[22] Gerd Finke,et al. Scheduling of coupled tasks and one-machine no-wait robotic cells , 2009, Comput. Oper. Res..
[23] Atabak Elmi,et al. Multi-degree cyclic flow shop robotic cell scheduling problem: Ant colony optimization , 2016, Comput. Oper. Res..
[24] Yousef Ibrahim,et al. Scheduling rotationally arranged robotic cells served by a multi-function robot , 2014 .
[25] Mohsen Elhafsi,et al. An efficient new heuristic for the hoist scheduling problem , 2016, Comput. Oper. Res..
[26] Mohammad Hossein Fazel Zarandi,et al. Two-machine robotic cell scheduling problem with sequence-dependent setup times , 2013, Comput. Oper. Res..
[27] H. Neil Geismar,et al. Sequencing and Scheduling in Robotic Cells: Recent Developments , 2005, J. Sched..
[28] Bijan Sarkar,et al. A De Novo multi-approaches multi-criteria decision making technique with an application in performance evaluation of material handling device , 2015, Comput. Ind. Eng..
[29] Sbs Stephan Heil,et al. In situ spectroscopic ellipsometry as a versatile tool for studying atomic layer deposition , 2009 .
[30] Javad Rezaeian,et al. Two meta-heuristic algorithms for flexible flow shop scheduling problem with robotic transportation and release time , 2016, Appl. Soft Comput..
[31] Sinan Kayaligil,et al. Loading of pallets on identical CNC machines with cyclic schedules , 2002 .
[32] Chelliah Sriskandarajah,et al. Scheduling robotic cells served by a dual-arm robot , 2012 .
[33] Muhammad Azmi Ayub,et al. In-line Inspection of Roundness Using Machine Vision , 2014 .
[34] Min-Hyuk Kim,et al. Social-welfare based task allocation for multi-robot systems with resource constraints , 2012, Comput. Ind. Eng..
[35] Philippe Lacomme,et al. Metaheuristics for the Stochastic Hoist Scheduling Problem (SHSP) , 2001 .
[36] Yves Crama,et al. Cyclic Scheduling of Identical Parts in a Robotic Cell , 1997, Oper. Res..
[37] Eugene Levner,et al. Cyclic routing algorithms in graphs: Performance analysis and applications to robot scheduling , 2011, Comput. Ind. Eng..
[38] Y. Ting,et al. A path planning algorithm for industrial robots , 2002 .