APPLICATION OF ANALYSIS TOOLS TO EVALUATE THE TRAVEL IMPACTS OF HIGHWAY RECONSTRUCTION WITH EMPHASIS ON MICROCOMPUTER APPLICATIONS

The objective of this report is to provide guidance to highway agency officials on the use of available analysis tools to evaluate the travel impacts of major highway reconstruction projects. A process for travel impact evaluation is outlined. Guidelines on the selection of appropriate analysis tools are presented. Specific recommendations are made for three project scenarios (minor capacity reduction, partial closure, total closure). Five categories of available analysis tools with potential application to the evaluation process are reviewed: network-based highway and transit planning models, quick-response estimation techniques, highway capacity analysis procedures, traffic simulation models, and traffic optimization models. Corridor traffic management planning efforts in five cities (Pittsburgh, Boston, Philadelphia, Detroit, and Minneapolis) are also reviewed.

[1]  W D Cunagin,et al.  PASSER IV QUICK RESPONSE PROCEDURES , 1985 .

[2]  W W Recker,et al.  ENGINEERING STRATEGIES FOR MAJOR RECONSTRUCTION OF URBAN HIGHWAYS. FINAL REPORT. VOLUME 1: CARHOP ENVIRONMENT , 1985 .

[3]  C J Messer,et al.  ARTERIAL SIGNAL TIMING OPTIMIZATION USING PASSER II-87. MICROCOMPUTER USER'S GUIDE. FINAL REPORT , 1988 .

[4]  J. J. Wang,et al.  PLANNING AND SCHEDULING WORK ZONE TRAFFIC CONTROL , 1981 .

[5]  Stephen H Richards,et al.  TRAFFIC CAPACITY THROUGH URBAN FREEWAY WORK ZONES IN TEXAS , 1982 .

[6]  J M Morales,et al.  ANALYTICAL PROCEDURES FOR ESTIMATING FREEWAY TRAFFIC CONGESTION , 1986 .

[7]  A J Neveu,et al.  A PLANNING PROCESS TO DEVELOP TRAFFIC MANAGEMENT PLANS DURING HIGHWAY RECONSTRUCTION , 1986 .

[8]  R H Kermode,et al.  FREEWAY LANE CLOSURES , 1970 .

[9]  D. Noyce,et al.  TRAFFIC SIGNALS , 1934 .

[10]  Stephen L Cohen,et al.  ANALYSIS OF FREEWAY RECONSTRUCTION ALTERNATIVES USING TRAFFIC SIMULATION , 1987 .

[11]  C L Dudek,et al.  A MODEL TO CALCULATE THE ROAD USER COSTS AT WORK ZONES , 1982 .

[12]  A D May,et al.  FREQ8PE: A FREEWAY CORRIDOR SIMULATION AND RAMP METERING OPTIMIZATION MODEL , 1985 .

[13]  A E Radwan,et al.  A COMPARISON OF ARTERIAL AND NETWORK SOFTWARE PROGRAMS , 1987 .

[14]  R A Krammes,et al.  COMPUTER MODEL FOR EVALUATING AND SCHEDULING FREEWAY WORK-ZONE LANE CLOSURES , 1987 .

[15]  W W Recker,et al.  ENGINEERING STRATEGIES FOR MAJOR RECONSTRUCTION OF URBAN HIGHWAYS. FINAL REPORT. VOLUME 2: APPLICATION TO THE I-5 RECONSTRUCTION PROJECT , 1985 .

[16]  Michael D Meyer,et al.  RECONSTRUCTING MAJOR TRANSPORTATION FACILITIES: THE CASE OF BOSTON'S SOUTHEAST EXPRESSWAY , 1985 .

[17]  G Wickstrom,et al.  QUICK-RESPONSE URBAN TRAVEL ESTIMATION TECHNIQUES AND TRANSFERABLE PARAMETERS. USER'S GUIDE , 1978 .

[18]  C Z Beltt,et al.  THE I-394 INTERIM HOV LANE: A VALUABLE CONSTRUCTION ZONE TRAFFIC MANAGEMENT SYSTEM , 1986 .

[19]  W T Steffens,et al.  CORRIDOR TRANSPORTATION MANAGEMENT FOR HIGHWAY RECONSTRUCTION: SOUTHEAST EXPRESSWAY, MASSACHUSETTS 1984-1985 , 1986 .

[20]  R B Goldblatt DEVELOPMENT AND TESTING OF INTRAS, A MICROSCOPIC FREEWAY SIMULATION MODEL, VOLUME 3: VALIDATION AND APPLICATION , 1980 .

[21]  Conrad L Dudek,et al.  QUEUE AND USER COST EVALUATION OF WORK ZONES (QUEWZ) , 1984 .

[22]  R A Krammes,et al.  Microcomputer Tool for Freeway Work Zone Planning and Scheduling , 1987 .

[23]  D R Samdahl,et al.  Highway traffic data for urbanized area project planning and design , 1982 .

[24]  Werner Eichorn,et al.  PHILADELPHIA, SCHUYLKILL EXPRESSWAY , 1987 .

[25]  Nagui M. Rouphail,et al.  FLOW CHARACTERISTICS AT FREEWAY LANE CLOSURES , 1985 .

[26]  R R Tadi,et al.  IMPACT OF THE LODGE FREEWAY RECONSTRUCTION CLOSURE ON SURFACE STREETS IN DETROIT , 1988 .

[27]  R W Stokes,et al.  APPLICATION OF AN ALGORITHM FOR ESTIMATING FREEWAY TRIP TABLES , 1984 .

[28]  E B Lieberman,et al.  TRAFLO: A NEW TOOL TO EVALUATE TRANSPORTATION SYSTEM MANAGEMENT STRATEGIES , 1980 .

[29]  Butler ECONOMIC ANALYSIS OF ROADWAY OCCUPANCY FOR FREEWAY PAVEMENT MAINTENANCE AND REHABILITATION VOLUME I - FINAL REPORT , 1974 .

[30]  Samuel Yagar Dynamic traffic assignment by individual path minimization and queuing , 1971 .

[31]  R B Goldblatt,et al.  DEVELOPMENT AND TESTING OF INTRAS, A MICROSCOPIC FREEWAY SIMULATION MODEL, VOLUME 4: PROGRAM DOCUMENTATION , 1977 .

[32]  C E Wallace,et al.  Handbook of computer models for traffic operations analysis: final report , 1982 .

[33]  Steven Z Levine,et al.  DEVELOPING A SCHEDULING TOOL FOR WORK ZONES ON HOUSTON FREEWAYS , 1984 .

[34]  Bruce N. Janson,et al.  STUDY OF ALTERNATIVE TRANSPORTATION STRATEGIES DURING RECONSTRUCTION OF THE PARKWAY EAST, I-376, PITTSBURGH, PENNSYLVANIA. REPORT ON THE SECOND RECONSTRUCTION SEASON , 1983 .

[35]  C E Prem STREAMLINING THE TECHNICAL PLANNING PROCESS , 1987 .

[36]  D A Wicks,et al.  DEVELOPMENT AND TESTING OF INTRAS, A MICROSCOPIC FREEWAY SIMULATION MODEL: VOL. 2, USER'S MANUAL: FINAL REPORT. , 1980 .

[37]  R W Stokes,et al.  USE AND EFFECTIVENESS OF SYNTHETIC ORIGIN-DESTINATION DATA IN A MACROSCOPIC FREEWAY SIMULATION MODEL , 1986 .