Planning performance based contracts of repairable system using discrete event simulation

This paper investigates a discrete event simulation approach for managing performance based contracts of repairable systems. We focus on an integrated service delivery environment where the manufacturer develops capital-intensive systems and also provides after-sales support. We propose a simulation model to calculate system availability comprehending four performance drivers: life time distribution, repair time distribution, spare parts inventory, and repair facility. This simulation model allows the service supplier to minimize the total cost by optimizing the four performance drivers. In this simulation model, the failure time and repair time can follow arbitrary distribution. This will allow the customer to monitor the supplier’s service through comparing the actual availability and its theoretical value. The costs of three maintenance policies also can be studied under the performance based contracts framework. Two cases are considered in this paper. One is a system containing single unit, one warehouse, and one repair center. Another is a system containing two fleets with different installed units, two spare part warehouses with one for each fleet, and a central repair depot.

[1]  Hank J. Devries,et al.  Performance-Based Logistics - Barriers and Enablers to Effective Implementation , 2005 .

[2]  Jyotirmoy Sarkar,et al.  Avaliability of a one-unit system supported by several spares and repair facilities , 2010 .

[3]  P. Wang,et al.  Planning performance based contracts considering reliability and uncertain system usage , 2012, J. Oper. Res. Soc..

[4]  Matthias C. M. Troffaes,et al.  Data analysis and robust modelling of the impact of renewable generation on long term security of supply and demand , 2015, 2015 IEEE Power & Energy Society General Meeting.

[6]  Rakesh K. Sarin,et al.  Performance-Based Incentive Plans , 1980 .

[7]  Serguei Netessine,et al.  Impact of Performance-Based Contracting on Product Reliability: An Empirical Analysis , 2011, Manag. Sci..

[8]  Dong Seong Kim,et al.  Reliability and availability analysis for an on board computer in a satellite system using standby redundancy and rejuvenation , 2012 .

[9]  Rajesh Piplani,et al.  A study of repairable parts inventory system operating under performance-based contract , 2011, Eur. J. Oper. Res..

[10]  Tongdan Jin,et al.  Understanding operational availability in performance-based logistics and maintenance services , 2013, 2013 Proceedings Annual Reliability and Maintainability Symposium (RAMS).

[11]  G. A. Hamoud,et al.  Assessment of customer supply reliability in performance-based contracts , 2003 .

[12]  R. Barlow,et al.  Optimum Preventive Maintenance Policies , 1960 .