Wood Frame Building Response to Rapid-Onset Flooding
暂无分享,去创建一个
[1] W. Roos,et al. Damage to buildings , 2003 .
[2] Robert B. Haehnel,et al. Maximum Impact Force of Woody Debris on Floodplain Structures , 2004 .
[3] R. K. Chadha,et al. Effects of the 2004 great Sumatra tsunami : Southeast Indian coast , 2007 .
[4] David V. Rosowsky,et al. Reliability of Light-Frame Wall Systems Subject to Combined Axial and Transverse Loads , 2005 .
[5] D. I. Smith. Flood damage estimation - A review of urban stage-damage curves and loss functions , 1994 .
[6] Emergency Response,et al. Characterization of building-related construction and demolition debris in the United States , 1998 .
[7] Stephanie E. Chang,et al. HAZUS-MH Flood Loss Estimation Methodology. II. Damage and Loss Assessment , 2006 .
[8] John L. Nieber,et al. DESIGN ASPECTS OF BUILDINGS FOR FLOOD PLAIN LOCATIONS. , 1975 .
[9] H. Ronald Riggs,et al. Lessons from Hurricane Katrina Storm Surge on Bridges and Buildings , 2007 .