Construction of a high voltage test facility
暂无分享,去创建一个
Manitoba Hydro has constructed a facility for dielectric testing of equipment rated up to 500 kVac and 500 kVdc. A test system for induced, no-load and full load tests on large power transformers is being added.
[1] W. McDermid. Rationale for a high voltage test facility , 2010, 2010 International Conference on High Voltage Engineering and Application.