An Intelligent Manufacturing System for Heat Treatment Scheduling
暂无分享,去创建一个
[1] Peter Brucker,et al. A Branch & Bound Algorithm for the Open-shop Problem , 1997, Discret. Appl. Math..
[2] Alejandra Duenas,et al. Multi-objective genetic algorithm for single machine scheduling problem under fuzziness , 2008, Fuzzy Optim. Decis. Mak..
[3] Teodor Gabriel Crainic,et al. Benchmark-problem instances for static scheduling of task graphs with communication delays on homogeneous multiprocessor systems , 2006, Comput. Oper. Res..
[4] Tung-Kuan Liu,et al. Improved genetic algorithm for the job-shop scheduling problem , 2006 .
[5] Riccardo Poli,et al. Particle Swarm Optimisation , 2011 .
[6] Yoshiro Ikura,et al. Efficient scheduling algorithms for a single batch processing machine , 1986 .
[7] Ling Wang,et al. An effective hybrid optimization strategy for job-shop scheduling problems , 2001, Comput. Oper. Res..
[8] James E. Baker,et al. Adaptive Selection Methods for Genetic Algorithms , 1985, International Conference on Genetic Algorithms.
[9] S. M. Johnson,et al. Optimal two- and three-stage production schedules with setup times included , 1954 .
[10] Marc Gravel,et al. Scheduling continuous casting of aluminum using a multiple objective ant colony optimization metaheuristic , 2002, Eur. J. Oper. Res..
[11] Peter Brucker,et al. Scheduling Algorithms , 1995 .
[12] Sami Khuri,et al. Genetic Algorithms for Solving Open Shop Scheduling Problems , 1999, EPIA.
[13] John W. Fowler,et al. Heuristic scheduling of jobs on parallel batch machines with incompatible job families and unequal ready times , 2005, Comput. Oper. Res..
[14] Marco Dorigo,et al. Ant system: optimization by a colony of cooperating agents , 1996, IEEE Trans. Syst. Man Cybern. Part B.
[15] E.L. Lawler,et al. Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey , 1977 .
[16] Marco Dorigo,et al. Optimization, Learning and Natural Algorithms , 1992 .
[17] Kenneth Alan De Jong,et al. An analysis of the behavior of a class of genetic adaptive systems. , 1975 .
[18] David E. Goldberg,et al. Genetic Algorithms in Search Optimization and Machine Learning , 1988 .
[19] Jan Karel Lenstra,et al. Scheduling subject to resource constraints: classification and complexity , 1983, Discret. Appl. Math..
[20] Joseph Y.-T. Leung,et al. Minimizing Mean Flow Time in Two-Machine Open Shops and Flow Shops , 1993, J. Algorithms.
[21] Lai Soon Lee,et al. A genetic algorithm on single machine family scheduling problem to minimise total weighted completion time , 2009 .
[22] W. Kubiak,et al. A Note On The Complexity Of Openshop Scheduling Problems , 1991 .
[23] Jan Karel Lenstra,et al. Complexity of machine scheduling problems , 1975 .
[24] Reha Uzsoy,et al. Benchmarks for shop scheduling problems , 1998, Eur. J. Oper. Res..
[25] Jyh-Shing Roger Jang,et al. ANFIS: adaptive-network-based fuzzy inference system , 1993, IEEE Trans. Syst. Man Cybern..
[26] Sean R Eddy,et al. What is dynamic programming? , 2004, Nature Biotechnology.
[27] R. Lewontin. ‘The Selfish Gene’ , 1977, Nature.
[28] Jürgen Dorn,et al. Scheduling of production processes , 1993 .
[29] Maysam Abbod,et al. Multi-agent System for Dynamic Manufacturing System Optimization , 2008, ICCS.
[30] Christos Koulamas. Single-machine scheduling with time windows and earliness/tardiness penalties , 1996 .
[31] Christian Prins,et al. An Overview of Scheduling Problems Arising in Satellite Communications , 1994 .
[32] Fred W. Glover,et al. Future paths for integer programming and links to artificial intelligence , 1986, Comput. Oper. Res..
[33] Mohan M. Kumaraswamy,et al. Applying Pareto Ranking and Niche Formation to Genetic Algorithm-Based Multiobjective Time–Cost Optimization , 2005 .
[34] Ravi Sethi,et al. The Complexity of Flowshop and Jobshop Scheduling , 1976, Math. Oper. Res..
[35] Kevin M. Passino,et al. Biomimicry of bacterial foraging for distributed optimization and control , 2002 .
[36] Bernd Freisleben,et al. A Genetic Local Search Approach to the Quadratic Assignment Problem , 1997, ICGA.
[37] Lili Liu,et al. Minimizing Number of Tardy Jobs on a Batch Processing Machine with Incompatible Job Families , 2008, 2008 ISECS International Colloquium on Computing, Communication, Control, and Management.
[38] Lixin Tang,et al. A mathematical programming model and solution for scheduling production orders in Shanghai Baoshan Iron and Steel Complex , 2007, Eur. J. Oper. Res..
[39] Don T. Phillips,et al. A state-of-the-art survey of dispatching rules for manufacturing job shop operations , 1982 .
[40] Robert L. Bulfin,et al. Scheduling ordered open shops , 1987, Comput. Oper. Res..
[41] Chinyao Low,et al. Genetic algorithm-based heuristics for an open shop scheduling problem with setup, processing, and removal times separated , 2009 .
[42] H. Tanaka,et al. Individual aging in genetic algorithms , 1996, 1996 Australian New Zealand Conference on Intelligent Information Systems. Proceedings. ANZIIS 96.
[43] Helena Ramalhinho Dias Lourenço,et al. Combining the Large-Step Optimization with Tabu-Search: Application to The Job-Shop Scheduling Problem , 1996 .
[44] Martin Charles Golumbic,et al. Constraint Satisfiability Algorithms for Interactive Student Scheduling , 1989, IJCAI.
[45] Gary D. Scudder,et al. Sequencing with Earliness and Tardiness Penalties , 1989 .
[46] R. Saravanan,et al. Scheduling optimisation of flexible manufacturing systems using particle swarm optimisation algorithm , 2005 .
[47] F. Pettersson,et al. Hybrid ant colony optimization and visibility studies applied to a job-shop scheduling problem , 2007, Appl. Math. Comput..
[48] Yuehong Yin,et al. A genetic algorithm based approach to flowshop scheduling , 2004, Fifth World Congress on Intelligent Control and Automation (IEEE Cat. No.04EX788).
[49] Abdelhay A. Sallam,et al. Swarming of intelligent particles for solving the nonlinear constrained optimization problem , 2001 .
[50] Józef Grabowski,et al. Some local search algorithms for no-wait flow-shop problem with makespan criterion , 2005, Comput. Oper. Res..
[51] Joachim Born,et al. Modelling and Simulation of Distributed Evolutionary Search Processes for Function Optimization , 1990, Parallel Problem Solving from Nature.
[52] Gary D. Scudder,et al. Sequencing with Earliness and Tardiness Penalties: A Review , 1990, Oper. Res..
[53] Martin Feldmann,et al. Benchmarks for scheduling on a single machine against restrictive and unrestrictive common due dates , 2001, Comput. Oper. Res..
[54] Chandrasekharan Rajendran,et al. Efficient dispatching rules for scheduling in a job shop , 1997 .
[55] Ridha Gharbi,et al. An introduction to artificial intelligence applications in petroleum exploration and production , 2005 .
[56] Maged M. Dessouky,et al. A virtual plant modeller (VPMOD) for batch-chemical processes , 1999, J. Intell. Manuf..
[57] R. Nakano,et al. A fusion of crossover and local search , 1996, Proceedings of the IEEE International Conference on Industrial Technology (ICIT'96).
[58] A. Land,et al. An Automatic Method for Solving Discrete Programming Problems , 1960, 50 Years of Integer Programming.
[59] S. Ponnambalam,et al. A TSP-GA multi-objective algorithm for flow-shop scheduling , 2004 .
[60] Michael Randolph Garey,et al. Johnson: "computers and intractability , 1979 .
[61] James E. Baker,et al. Reducing Bias and Inefficienry in the Selection Algorithm , 1987, ICGA.
[62] Yasuhiro Tsujimura,et al. A tutorial survey of job-shop scheduling problems using genetic algorithms, part II: hybrid genetic search strategies , 1999 .
[63] FEDERICO DELLA CROCE,et al. A genetic algorithm for the job shop problem , 1995, Comput. Oper. Res..
[64] Lixin Tang,et al. A modified genetic algorithm for single machine scheduling , 1999 .
[65] David S. Johnson,et al. Computers and Intractability: A Guide to the Theory of NP-Completeness , 1978 .
[66] Ching-Fang Liaw,et al. A hybrid genetic algorithm for the open shop scheduling problem , 2000, Eur. J. Oper. Res..
[67] A. Hertz. Tabu search for large scale timetabling problems , 1991 .
[68] Jean-Charles Billaut,et al. Multicriteria scheduling , 2005, Eur. J. Oper. Res..
[69] Russell C. Eberhart,et al. Tracking and optimizing dynamic systems with particle swarms , 2001, Proceedings of the 2001 Congress on Evolutionary Computation (IEEE Cat. No.01TH8546).
[70] Daniel S. Weld. An Introduction to Least Commitment Planning , 1994, AI Mag..
[71] Michael Pinedo,et al. Scheduling: Theory, Algorithms, and Systems , 1994 .
[72] Ujjwal Maulik,et al. Incorporating Chromosome Differentaition in Genetic Algorithms , 1998, Inf. Sci..
[73] Yuehong Yin,et al. Scheduling of an assembly line with a multi-objective genetic algorithm , 2006 .
[74] Rainer Kolisch,et al. PSPLIB - a project scheduling problem library , 1996 .
[75] Y. Yoshitomi. A Genetic Algorithm Approach to Solving Stochastic Job‐shop Scheduling Problems , 2002 .
[76] Hartmut Schmeck,et al. Ant colony optimization for resource-constrained project scheduling , 2000, IEEE Trans. Evol. Comput..
[77] Stavros G. Kolliopoulos,et al. Approximation algorithms for minimizing the total weighted tardiness on a single machine , 2006, Theor. Comput. Sci..
[78] A. Kan. Machine Scheduling Problems: Classification, Complexity and Computations , 1976 .
[79] Sheik Meeran,et al. Deterministic job-shop scheduling: Past, present and future , 1999, Eur. J. Oper. Res..
[80] Kalyanmoy Deb,et al. A Comparative Analysis of Selection Schemes Used in Genetic Algorithms , 1990, FOGA.
[81] William L. Maxwell,et al. Theory of scheduling , 1967 .
[82] E. Lawler. A “Pseudopolynomial” Algorithm for Sequencing Jobs to Minimize Total Tardiness , 1977 .
[83] Lothar Thiele,et al. A Comparison of Selection Schemes used in Genetic Algorithms , 1995 .
[84] Éric D. Taillard,et al. Benchmarks for basic scheduling problems , 1993 .
[85] Mitsuo Gen,et al. Effects of symbiotic evolution in genetic algorithms for job-shop scheduling , 2001, Proceedings of the 34th Annual Hawaii International Conference on System Sciences.
[86] Ioan Cristian Trelea,et al. The particle swarm optimization algorithm: convergence analysis and parameter selection , 2003, Inf. Process. Lett..
[87] Peter Ross,et al. A Promising Hybrid GA/Heuristic Approach for Open-Shop Scheduling Problems , 1994, ECAI.
[88] Russell C. Eberhart,et al. A discrete binary version of the particle swarm algorithm , 1997, 1997 IEEE International Conference on Systems, Man, and Cybernetics. Computational Cybernetics and Simulation.
[89] Matteo Fischetti,et al. The Fixed Job Schedule Problem with Working-Time Constraints , 1989, Oper. Res..
[90] Ranga V. Ramasesh. Dynamic job shop scheduling: A survey of simulation research , 1990 .
[91] Éric D. Taillard,et al. Parallel Taboo Search Techniques for the Job Shop Scheduling Problem , 1994, INFORMS J. Comput..
[92] Charles E. Taylor. Adaptation in Natural and Artificial Systems: An Introductory Analysis with Applications to Biology, Control, and Artificial Intelligence. Complex Adaptive Systems.John H. Holland , 1994 .
[93] Bart Selman,et al. Algorithm portfolios , 2001, Artif. Intell..
[94] George E. Totten,et al. Steel Heat Treatment Handbook , 2005 .
[95] John R. King,et al. Production Scheduling , 1988, Computer-Aided Production Management.
[96] Emanuel Falkenauer,et al. A genetic algorithm for job shop , 1991, Proceedings. 1991 IEEE International Conference on Robotics and Automation.
[97] Rajendran Saravanan. Manufacturing Optimization through Intelligent Techniques (Manufacturing Engineering and Materials Processing) , 2006 .
[98] D. Y. Sha,et al. A Multi-objective PSO for job-shop scheduling problems , 2009 .
[99] Yoshikazu Fukuyama,et al. A hybrid particle swarm optimization for distribution state estimation , 2003, 2003 IEEE Power Engineering Society General Meeting (IEEE Cat. No.03CH37491).
[100] Takeshi Yamada,et al. Conventional Genetic Algorithm for Job Shop Problems , 1991, ICGA.
[101] Colin R. Reeves,et al. Genetic Algorithms and Neighbourhood Search , 1994, Evolutionary Computing, AISB Workshop.
[102] Vitaly A. Strusevich,et al. Non-preemptive two-machine open shop scheduling with non-availability constraints , 2003, Math. Methods Oper. Res..
[103] R. Haupt,et al. A survey of priority rule-based scheduling , 1989 .
[104] A. J. Clewett,et al. Introduction to sequencing and scheduling , 1974 .
[105] Russell C. Eberhart,et al. Recent advances in particle swarm , 2004, Proceedings of the 2004 Congress on Evolutionary Computation (IEEE Cat. No.04TH8753).
[106] M. Mathirajan,et al. Heuristic algorithms for scheduling heat-treatment furnaces of steel casting industries , 2007 .
[107] A. Eiben,et al. A multi-sexual genetic algorithm for multiobjective optimization , 1997, Proceedings of 1997 IEEE International Conference on Evolutionary Computation (ICEC '97).
[108] Mitsuo Gen,et al. A tutorial survey of job-shop scheduling problems using genetic algorithms: Part II. Hybrid , 1999 .
[109] Ching-Jong Liao,et al. An ant colony system approach for scheduling problems , 2003 .
[110] Naoharu Yoshitani,et al. Model-based control of strip temperature for the heating furnace in continuous annealing , 1998, IEEE Trans. Control. Syst. Technol..
[111] Qiang Liu,et al. A Hybrid Genetic Algorithm for the Single Machine Scheduling Problem , 1999, J. Heuristics.
[112] Hamilton Emmons,et al. One-Machine Sequencing to Minimize Certain Functions of Job Tardiness , 1969, Oper. Res..
[113] Chris N. Potts,et al. Single Machine Tardiness Sequencing Heuristics , 1991 .
[114] Teofilo F. Gonzalez,et al. Open Shop Scheduling to Minimize Finish Time , 1976, JACM.
[115] Robert McNaughton,et al. Scheduling with Deadlines and Loss Functions , 1959 .
[116] Michael J. Shaw,et al. An Artificial Intelligence Approach to the Scheduling of Flexible Manufacturing Systems , 1989 .
[117] Suresh P. Sethi,et al. Earliness-Tardiness Scheduling Problems, II: Deviation of Completion Times About a Restrictive Common Due Date , 1991, Oper. Res..
[118] Edward G. Coffman,et al. Computer and job-shop scheduling theory , 1976 .
[119] Sönke Hartmann,et al. Self-adapting genetic algorithms with an application to project scheduling , 1999 .
[120] Dominique de Werra,et al. Open shop scheduling with some additional constraints , 1996, Graphs Comb..
[121] Maysam Abbod,et al. Modelling and Optimisation of Reheat Furnace , 2008, 2008 Second UKSIM European Symposium on Computer Modeling and Simulation.
[122] E. L. Johnson. Integer programming , 1980 .