Human and robotic repair of a solar array wing during ISS assembly mission 10A

Abstract With the installation of a new module and the relocation of three other modules, including multiple hand-offs from the station arm (SSRMS) to the shuttle arm (SRMS), International Space Station (ISS) assembly mission 10A/STS-120 was anticipated to be one of the most complicated ISS assembly missions ever attempted. The assembly operations became even more complex when a solar array wing (SAW) on the relocated Port-6 (P6) truss segment ripped while being extended. Repairing the torn SAW became the single most important objective for the remainder of STS-120, with future ISS assembly missions threatened by reduced power generation capacity if the SAW could not be repaired. Precise coordination between the space shuttle and ISS robotics teams led to an operational concept that combined the capabilities of the SRMS and SSRMS robotic systems in ways far beyond their original design capacities. Benefits of consistent standards for ISS robotic interfaces have been previously identified, but the advantages of having two such versatile and compatible robotic systems have never been quite so spectacular. This paper describes the role of robotics in the emergency SAW repair and highlights how versatility within space robotics systems can allow operations far beyond the intended design scenarios.