Modeling and Analysis of Sorting Traffic and Buffer Capacities for Disassembly Systems with Reverse Blocking
暂无分享,去创建一个
[1] Surendra M. Gupta,et al. Near optimal buffer allocation in remanufacturing systems with N-policy , 2010, Comput. Ind. Eng..
[2] Surendra M. Gupta,et al. Buffer allocation plan for a remanufacturing cell , 2005, Comput. Ind. Eng..
[3] Alfred J.D. Lambert,et al. Environment conscious manufacturing , 2007 .
[4] Deniz Türsel Eliiyi,et al. The state of the art on buffer allocation problem: a comprehensive survey , 2014, J. Intell. Manuf..
[5] Fulya Altiparmak,et al. Buffer allocation and performance modeling in asynchronous assembly system operations: An artificial neural network metamodeling approach , 2007, Appl. Soft Comput..
[6] Surendra M. Gupta,et al. Optimal management of remanufacturing systems with server vacations , 2011 .
[7] Mehmet Ali Ilgin,et al. Environmentally conscious manufacturing and product recovery (ECMPRO): A review of the state of the art. , 2010, Journal of environmental management.
[8] Chun Su,et al. Buffer allocation for hybrid manufacturing/remanufacturing system considering quality grading , 2014 .
[9] J. MacGregor Smith,et al. Buffer and throughput trade-offs in M/G/1/K queueing networks : a bi-criteria approach , 2010 .
[10] Masayuki Matsui,et al. A performance evaluation of disassembly systems with reverse blocking , 2009, Comput. Ind. Eng..