The effect of load uncertainty on unit commitment risk
暂无分享,去创建一个
[1] A. Merlin,et al. A New Method for Unit Commitment at Electricite De France , 1983, IEEE Transactions on Power Apparatus and Systems.
[2] C.K. Pang,et al. Optimal short-term thermal unit commitment , 1976, IEEE Transactions on Power Apparatus and Systems.
[3] F. N. Lee,et al. Short-term thermal unit commitment-a new method , 1988 .
[4] R. Adapa,et al. Gauss-Markov Load Model for Application in Risk Evaluation and Production Simulation , 1992, IEEE Power Engineering Review.
[5] F. N. Lee,et al. Unit commitment risk with sequential rescheduling , 1991 .
[6] Probability Subcommittee,et al. IEEE Reliability Test System , 1979, IEEE Transactions on Power Apparatus and Systems.
[7] N.D. Reppen,et al. Operating reserve and generation risk analysis for the PJM interconnection , 1975, IEEE Transactions on Power Apparatus and Systems.
[8] R. Billinton,et al. The IEEE Reliability Test System???Extensions to and Evaluation of the Generating System , 1986, IEEE Power Engineering Review.
[9] Roy Billinton,et al. Reliability evaluation of power systems , 1984 .
[10] F. Albuyeh,et al. Evaluation of Dynamic Programming Based Methods and Multiple area Representation for Thermal Unit Commitments , 1981, IEEE Transactions on Power Apparatus and Systems.
[11] L. T. Anstine,et al. Application of Probability Methods to the Determination of Spinning Reserve Requirements for the Pennsylvania-New Jersey-Maryland Interconnection , 1963 .