Developing a life cycle cost model for real-time condition monitoring in railways under uncertainty
暂无分享,去创建一个
Lei Dai | Clive Roberts | Di Zhang | Hao Hu
[1] John Andrews,et al. A modelling approach to railway track asset management , 2013 .
[2] A Harding. Reliability, Maintenance and Logistic Support: A Life Cycle Approach , 2002, J. Oper. Res. Soc..
[3] Andrew Roden. Monitoring System Gives Early Warning of Problems , 2005 .
[4] M. Ghazel,et al. A Behavioural Model for the Level Crossing Collision Risk Assessment , 2009 .
[5] Narendra J. Sheth,et al. Statistical Design and Analysis of Engineering Experiments , 1973 .
[6] Christoph Lindemann,et al. Performance Modelling with Deterministic and Stochastic Petri Nets , 1998, PERV.
[7] Lei Dai,et al. Railway Train Wheel Maintenance Model and Its Application , 2014 .
[8] K. El-Akruti,et al. The Role of Life Cycle Cost in Engineering Asset Management , 2015 .
[9] Kyoon-Tai Kim,et al. Development of a life cycle cost estimate system for structures of light rail transit infrastructure , 2010 .
[10] Ettore Stella,et al. A Real-Time Visual Inspection System for Railway Maintenance: Automatic Hexagonal-Headed Bolts Detection , 2007, IEEE Transactions on Systems, Man, and Cybernetics, Part C (Applications and Reviews).
[11] John D. Andrews,et al. A stochastic model for railway track asset management , 2014, Reliab. Eng. Syst. Saf..
[12] Clive Roberts,et al. Life cycle costs for railway condition monitoring , 2008 .
[13] Zdenek Vintr,et al. An assessment of mean time between failures for a group of rolling bearings , 2011, 2011 International Conference on Quality, Reliability, Risk, Maintenance, and Safety Engineering.
[14] Sigmund J. Amster,et al. The Statistical Treatment of Fatigue Experiments , 1964 .
[15] J.L.A. Ferreira,et al. An investigation of rail bearing reliability under real conditions of use , 2003 .