Technology of Unmanned Construction System in Japan

∗1Kokankyo Engineering Corporation 4-30-3 Sendagaya, Sibuya, Tokyo 151-0015, Japan E-mail: chayama@eae.co.jp ∗2Civil Engineering Technology Department, Construction Division, Fujita Corporation 4-25-2 Sendagaya, Sibuya, Tokyo 151-8570, Japan E-mail: fujioka@fujita.co.jp ∗3Tokyo Medical and Dental University 2-3-10 Kanda-Surugadai, Chiyoda, Tokyo 101-0062, Japan E-mail: kkawa.bmc@tmd.ac.jp ∗4Kanto Technology Development Office, Ministry of Land, Infrastructure, Transport and Tourism (MLIT) 6-12-1 Gokou-Nishi, Matsudo, Chiba 270-2218, Japan E-mail: yamamoto-h2i4@ktr.mlit.go.jp ∗5Matsue National Highway office, Ministry of Land, Infrastructure, Transport and Tourism (MLIT) 2-6-28 Nishitsuda, Matsue, Shimane 690-0017, Japan E-mail: nitta-y92qx@cgr.mlit.go.jp ∗6Tokyo Architectural Construction Branch, Kajima Corporation 2-14-27 Akasaka, Minato, Tokyo 107-0052, Japan E-mail: ueki@kajima.com ∗7Department of Precision Engineering, The University of Tokyo 7-3-1 Hongo, Bunkyo, Tokyo 113-8656, Japan E-mail: {yamashita, asama}@robot.t.u-tokyo.ac.jp

[1]  Atsushi Yamashita,et al.  Parallel line-based structure from motion by using omnidirectional camera in textureless scene , 2013, Adv. Robotics.

[2]  Hajime Asama,et al.  Adaptive Division-of-Labor Control Algorithm for Multi-Robot Systems , 2010, J. Robotics Mechatronics.

[3]  Shin'ichi Yuta,et al.  Development of the autonomous hydraulic excavator prototype using 3-D information for motion planning and control , 2010, 2010 IEEE/SICE International Symposium on System Integration.

[4]  Shigeo Kitahara,et al.  Proposals of disaster response robots built in and institutional problems solved for evolution of promising unmanned construction system , 2013, 2013 IEEE Region 10 Humanitarian Technology Conference.

[5]  H. Hongo,et al.  A Practical Calibration Method for Top View Image Generation , 2008, 2008 Digest of Technical Papers - International Conference on Consumer Electronics.

[6]  Edward Jones,et al.  Equidistant Fish-Eye Calibration and Rectification by Vanishing Point Extraction , 2010, IEEE Transactions on Pattern Analysis and Machine Intelligence.

[7]  Ken Endo,et al.  Example of Experimental Use of 3D Measurement System for Construction Robot Based on Component Design Concept , 2006 .

[8]  Takashi Tsubouchi,et al.  Autonomous Scooping of Rock Pile by Wheel Loader : Abstract of "YAMAZUMI" Project , 2004 .

[9]  Kazuo Fujishima,et al.  Digging control system for hydraulic excavator , 2001 .

[10]  Jun Ota,et al.  Motion planning of multiple mobile robots for Cooperative manipulation and transportation , 2003, IEEE Trans. Robotics Autom..

[11]  Hui Shao,et al.  Automatic Excavation Planning of Hydraulic Excavator , 2008, ICIRA.

[12]  Hiroshi Yamamoto,et al.  Introduction to the General Technology Development Project: Research and Development of Advanced Execution Technology by Remote Control Robot and Information Technology , 2006 .

[13]  Takeshi Yamauchi,et al.  Development, Application and Evaluation of Remote Survey System for Construction Management , 2004 .

[14]  Hiroshi Yamamoto,et al.  Motion Analysis of Hydraulic Excavator in Excavating and Loading Work for Autonomous Control , 2006 .

[15]  Takeshi Yamauchi,et al.  Development and Application of a Tele-Operated Robot for a Type Mountable to General-Purpose Construction Machines , 2004 .