Economic and environmental savings of structural buildings refurbishment with demolition and reconstruction - A Portuguese benchmarking

Abstract Europe is a consolidated continent, characterized by a wide range of ancient buildings that urgently need refurbishments, especially in seismic zones such as Portugal, where structural reinforcement is imperative. However, demolishing and reconstructing also contributes to real estate renovation. In these cases it is simpler to build earthquake safe buildings that comply with current standards of comfort and quality. The question now is whether refurbishment (and what type) is environmentally and/or economically profitable or needed compared with new construction. To answer this question, this work used the life cycle approach in two complementary approaches: a literature review that theoretically compares different LCA works for refurbished and new buildings; and a real LCA and LCC case study for a classified ancient Portuguese building located in Lisbon, where real refurbishment is compared with hypothetical demolition, followed by complete reconstruction on the same site, respecting the same architecture, constraints and demands, and using reinforced concrete and clay brick walls. This issue is very urgent in Portugal, because of its extensive stock of ancient buildings needing refurbishment works. Moreover, there are few studies reporting whether the refurbishment can be economically and environmentally more efficient, according to the Portuguese economic environment. Thus, this study mostly contributes to this debate, first at a national level, and then as a new case study reporting this kind of benchmarking, and its significance is related to the actual results measured at the construction site for the traditional refurbishment works made in Portugal. This comparison showed that structural refurbishment seems to be environmentally more positive. Nevertheless, in the case-study gains were not as high as commonly suggested, mainly because of the massive use of structural steel and shotcrete required for the seismic and structural strengthening of the ancient building. Finally, as far as the economic approach is concerned, this paper concludes that in those conditions rebuilding would make more economic sense than refurbishing. These conclusions indicate that an integrated decision-making process is needed and also stress the development of new financial facilities for refurbishment and, especially, the development of less costly solutions that could save scarce resources and incentives.

[1]  Joan Rieradevall,et al.  Life cycle assessment of wood wastes: A case study of ephemeral architecture. , 2006, The Science of the total environment.

[2]  Martin Pehnt,et al.  Dynamic life cycle assessment (LCA) of renewable energy technologies , 2006 .

[3]  Bin Song,et al.  LCAs of a polycrystalline photovoltaic module and a wind turbine , 2011 .

[4]  Rehan Sadiq,et al.  Sustainability assessment of flooring systems in the city of Tehran: An AHP-based life cycle analysis , 2011 .

[5]  Maurizio Cellura,et al.  Energy and environmental benefits in public buildings as a result of retrofit actions , 2011 .

[6]  Oscar Ortiz,et al.  The environmental impact of the construction phase: An application to composite walls from a life cycle perspective , 2010 .

[7]  Ambrose Dodoo,et al.  Carbon implications of end-of-life management of building materials. , 2009 .

[8]  Hans-Jürgen Dr. Klüppel,et al.  The Revision of ISO Standards 14040-3 - ISO 14040: Environmental management – Life cycle assessment – Principles and framework - ISO 14044: Environmental management – Life cycle assessment – Requirements and guidelines , 2005 .

[9]  David Pennington,et al.  Recent developments in Life Cycle Assessment. , 2009, Journal of environmental management.

[10]  G. Klunder Towards ecological life-cycle design : Measuring the environmental impact of housing transformations , 2003 .

[11]  Jurgita Antucheviciene,et al.  Multiple criteria evaluation of rural building's regeneration alternatives , 2007 .

[12]  Daniel Castro-Lacouture,et al.  Housing refurbishment contractors selection based on a hybrid fuzzy-QFD approach , 2009 .

[13]  Arnold Janssens,et al.  Quantification of the impact of the end-of-life scenario on the overall resource consumption for a dwelling house , 2009 .

[14]  Luciana Paulo Gomes,et al.  Life cycle analysis (LCA) for the incorporation of rice husk ash in mortar coating , 2010 .

[15]  Oscar Ortiz,et al.  Sustainability in the construction industry: A review of recent developments based on LCA , 2009 .

[16]  B. Solberg,et al.  Environmental and economic impacts of substitution between wood products and alternative materials: a review of micro-level analyses from Norway and Sweden , 2005 .

[17]  Robert Ries,et al.  Comparative environmental life cycle assessment of green roofs , 2007 .

[18]  Janusz Adamczyk,et al.  Economic and environmental benefits of thermal insulation of building external walls , 2011 .

[19]  Daniel J. Watts,et al.  Life cycle analysis of retrofitting with high energy efficiency air-conditioner and fluorescent lamp in existing buildings , 2009 .

[20]  Maurizio Cellura,et al.  Building energy performance : A LCA case study of kenaf-fibres insulation board , 2008 .

[21]  Joaquim Ferreira,et al.  In search of better energy performance in the Portuguese buildings—The case of the Portuguese regulation , 2011 .

[22]  Hans-Jörg Althaus,et al.  Relevance of simplifications in LCA of building components , 2009 .

[23]  Arianna Dominici Loprieno,et al.  A life cycle approach to Green Public Procurement of building materials and elements: A case study on windows , 2011 .

[24]  Ravi Prakash,et al.  Life cycle energy analysis of buildings: An overview , 2010 .

[25]  K. Stanecki,et al.  Global Population Profile: 2002. International Population Reports. , 2004 .

[26]  P. Parker,et al.  Measuring buildings for sustainability: Comparing the initial and retrofit ecological footprint of a century home – The REEP House , 2012 .

[27]  K. J Eaton,et al.  A comparative life cycle assessment of steel and concrete framed office buildings , 1997 .

[28]  Xu Zhang,et al.  Environmental performance optimization of window–wall ratio for different window type in hot summer and cold winter zone in China based on life cycle assessment , 2010 .

[29]  R. Raiteri,et al.  Comparative life cycle analysis for green faades and living wall systems , 2011 .

[30]  Nuno M.M. Ramos,et al.  Towards a methodology to include building energy simulation uncertainty in the Life Cycle Cost analysis of rehabilitation alternatives , 2015 .

[31]  B. Dong,et al.  TO RETROFIT OR REBUILD, THAT IS THE QUESTION Using Life-cycle Energy Performance for Comparing Construction Options , 2002 .

[32]  Varun,et al.  Life cycle assessment of buildings: A review , 2011 .

[33]  E Syrrakou,et al.  Eco-efficiency evaluation of a smart window prototype. , 2006, The Science of the total environment.

[34]  D. Huntzinger,et al.  A life-cycle assessment of Portland cement manufacturing: comparing the traditional process with alternative technologies , 2009 .

[35]  Shabbir H. Gheewala,et al.  A decision making matrix with life cycle perspective of materials for roofs in Sri Lanka , 2007 .

[36]  Edmundas Kazimieras Zavadskas,et al.  Crisis management in construction and real estate: Conceptual modeling at the micro-, meso- and macro-levels , 2011 .

[37]  Agis M. Papadopoulos,et al.  Environmental performance evaluation of thermal insulation materials and its impact on the building , 2007 .

[38]  Riccardo Battisti,et al.  Environmental assessment of solar thermal collectors with integrated water storage , 2005 .

[39]  Anne Grete Hestnes,et al.  Energy use in the life cycle of conventional and low-energy buildings: A review article , 2007 .

[40]  Giuseppe Tassielli,et al.  Comparative Life Cycle Assessment of flooring materials: ceramic versus marble tiles , 2002 .