Reliability modeling and availability analysis of combined cycle power plants
暂无分享,去创建一个
Mahmud Fotuhi-Firuzabad | Payman Dehghanian | Ali Abbaspour | Hamed Sabouhi | M. Fotuhi‐Firuzabad | Hamed Sabouhi | A. Abbaspour | P. Dehghanian
[1] Z W Birnbaum,et al. ON THE IMPORTANCE OF DIFFERENT COMPONENTS IN A MULTICOMPONENT SYSTEM , 1968 .
[2] J. B. Fussell,et al. How to Hand-Calculate System Reliability and Safety Characteristics , 1975, IEEE Transactions on Reliability.
[3] J. B. Fussell. HowtoHand-Calculate System Reliability andSafety Characteristics , 1975 .
[4] Roy Billinton,et al. Reliability evaluation of power systems , 1984 .
[5] Roy Billinton,et al. Reliability evaluation of engineering systems : concepts and techniques , 1992 .
[6] P. Kundur,et al. Dynamics models for combines cycle plants in power system studies , 1994 .
[7] L. Balling,et al. Probabilistic outage analysis of a combined-cycle power plant , 1995 .
[8] M. E. Beehler,et al. Reliability centered maintenance for transmission systems , 1996 .
[9] S. Camporeale,et al. Design and off-design performance of advanced mixed gas-steam cycle power plants , 1996, IECEC 96. Proceedings of the 31st Intersociety Energy Conversion Engineering Conference.
[10] Rc Okonkwo. Thermal Power Stations' Reliability Evaluation in a Hydrothermal System , 1997 .
[11] D. Sáez,et al. Fuzzy modelling for a combined cycle power plant , 1999, FUZZ-IEEE'99. 1999 IEEE International Fuzzy Systems. Conference Proceedings (Cat. No.99CH36315).
[12] P. L. So,et al. Dynamic modelling of a combined cycle plant for power system stability studies , 2000, 2000 IEEE Power Engineering Society Winter Meeting. Conference Proceedings (Cat. No.00CH37077).
[13] Marzuki Khalid,et al. Modeling of a superheater for a combined cycle power plant , 2000, 2000 TENCON Proceedings. Intelligent Systems and Technologies for the New Millennium (Cat. No.00CH37119).
[14] W. Reder,et al. Reliability centered maintenance for distribution underground systems , 2000, 2000 Power Engineering Society Summer Meeting (Cat. No.00CH37134).
[15] S. Suzaki,et al. Mathematical model for a combined cycle plant and its implementation in an analogue power system simulator , 2000, 2000 IEEE Power Engineering Society Winter Meeting. Conference Proceedings (Cat. No.00CH37077).
[16] S. Takriti,et al. Coordinating Fuel Inventory and Electric Power Generation under Uncertainty , 2001, IEEE Power Engineering Review.
[17] W. Li,et al. A reliability based approach to transmission maintenance planning and its application in BC Hydro system , 2001, 2001 Power Engineering Society Summer Meeting. Conference Proceedings (Cat. No.01CH37262).
[18] Lina Bertling,et al. Reliability-centred maintenance for electric power distribution systems , 2002 .
[19] J. Munoz,et al. Natural gas network modeling for power systems reliability studies , 2003, 2003 IEEE Bologna Power Tech Conference Proceedings,.
[20] J. Munoz-Estrada,et al. Including combined-cycle power plants in generation system reliability studies , 2005, 2004 International Conference on Probabilistic Methods Applied to Power Systems.
[21] Wenyuan Li,et al. Risk Assessment Of Power Systems: Models, Methods, and Applications , 2004 .
[22] A.F. Brandao,et al. Optimization of the maintenance of oil filled power transformers based on reliability criteria , 2004, 2004 IEEE/PES Transmision and Distribution Conference and Exposition: Latin America (IEEE Cat. No. 04EX956).
[23] J.S. Heo,et al. A multi-agent system-based intelligent steady-state model for a power plant , 2005, Proceedings of the 13th International Conference on, Intelligent Systems Application to Power Systems.
[24] Black. Power Plant Engineering , 2005 .
[25] Chen-Ching Liu,et al. Implementation of reliability-centered maintenance for circuit breakers , 2005, IEEE Power Engineering Society General Meeting, 2005.
[26] D.W. Holladay,et al. Reliability Centered Maintenance Study on Voltage Regulators , 2006, ESMO 2006 - 2006 IEEE 11th International Conference on Transmission & Distribution Construction, Operation and Live-Line Maintenance.
[27] V. Miranda,et al. Multiobjective Optimization Applied to Maintenance Policy for Electrical Networks , 2007, IEEE Transactions on Power Systems.
[28] J. Buchta,et al. Reliability of large power units in probabilistic approach , 2007, 2007 9th International Conference on Electrical Power Quality and Utilisation.
[29] Armen Der Kiureghian,et al. Availability, reliability and downtime of systems with repairable components , 2007, Reliab. Eng. Syst. Saf..
[30] Gilberto Francisco Martha de Souza,et al. Availability Analysis of Gas Turbines Used in Power Plants , 2009 .
[31] Lin Gao,et al. Modeling of combined cycle power plant based on a genetic algorithm parameter identification method , 2010, 2010 Sixth International Conference on Natural Computation.
[32] Mirko Palazzo,et al. Availability analysis of combined cycle power plant layouts which employ generator circuit-breakers and three-winding step-up transformers , 2010, 2010 IEEE International Energy Conference.
[33] Lasse Rosendahl. Advanced power plant materials, design and technology , 2010 .
[34] Ebrahim Babaei,et al. A new modeling method for reliability evaluation of Thermal Power Plants , 2010, 2010 IEEE International Conference on Power and Energy.
[35] Jun Deng,et al. Modeling and simulation of combined diesel and gas turbine propulsion system mission reliability , 2011, Proceedings 2011 International Conference on Transportation, Mechanical, and Electrical Engineering (TMEE).
[36] Sharif,et al. AN APPROACH ON CRITICAL COMPONENT IDENTIFICATION IN RELIABILITY CENTERED MAINTENANCE OF POWER DISTRIBUTION SYSTEMS BASED ON ANALYTICAL HIERARCHICAL PROCESS , 2011 .
[37] Janusz Buchta,et al. Estimation of reliability indices of power machinery in 370 MW rated power units operating in polish power system , 2011, 11th International Conference on Electrical Power Quality and Utilisation.
[38] Mun-Kyeom Kim,et al. A Reliability-Centered Approach to an Optimal Maintenance Strategy in Transmission Systems Using a Genetic Algorithm , 2011, IEEE Transactions on Power Delivery.
[39] Payman Dehghanian,et al. A reliability-oriented outlook on the critical components of power distribution systems , 2012 .
[40] M. L. Dewal,et al. System Reliability and Fault Tree Analysis of SeSHRS-Based Augmentation of Hydrogen: Dedicated for Combined Cycle Power Plants , 2012, IEEE Systems Journal.
[41] N. Taylor,et al. Identifying Critical Components for Transmission System Reliability , 2012, IEEE Transactions on Power Systems.
[42] Mahmud Fotuhi-Firuzabad,et al. Critical Component Identification in Reliability Centered Asset Management of Power Distribution Systems Via Fuzzy AHP , 2012, IEEE Systems Journal.
[43] Mladen Kezunovic,et al. Assessing circuit breaker life cycle using condition-based data , 2013, 2013 IEEE Power & Energy Society General Meeting.
[44] Mladen Kezunovic,et al. Security-based circuit breaker maintenance management , 2013, 2013 IEEE Power & Energy Society General Meeting.
[45] Mladen Kezunovic,et al. Cost/benefit analysis for circuit breaker maintenance planning and scheduling , 2013, 2013 North American Power Symposium (NAPS).
[46] J. Rubio-Romero,et al. A model for the preventive maintenance scheduling of power plants including wind farms , 2013, Reliab. Eng. Syst. Saf..
[47] R. Billinton,et al. A Comprehensive Scheme for Reliability-Centered Maintenance in Power Distribution Systems—Part II: Numerical Analysis , 2013, IEEE Transactions on Power Delivery.
[48] Abdullah Al Mamun,et al. A new schematic design of STG and GTG based power plant with higher efficiency , 2013, 2013 International Conference on Informatics, Electronics and Vision (ICIEV).
[49] R. Billinton,et al. A Comprehensive Scheme for Reliability Centered Maintenance in Power Distribution Systems—Part I: Methodology , 2013, IEEE Transactions on Power Delivery.
[50] G. R. Biswal,et al. Cool the Generators: System Reliability and Fault Tree Analysis of Hydrogen Cooling Systems , 2013, IEEE Industrial Electronics Magazine.
[51] Janusz Buchta,et al. Modelling of thermal power plants reliability , 2013, 4th International Conference on Power Engineering, Energy and Electrical Drives.
[52] Mladen Kezunovic,et al. Circuit breaker operational health assessment via condition monitoring data , 2014, 2014 North American Power Symposium (NAPS).
[53] Roy Billinton,et al. A practical application of the Delphi method in maintenance-targeted resource allocation of distribution utilities , 2014, 2014 International Conference on Probabilistic Methods Applied to Power Systems (PMAPS).
[54] S. S. Kachhwaha,et al. Development of reliability index for combined cycle power plant using graph theoretic approach , 2014 .
[55] Aydogan Ozdemir,et al. RCAM model for Turkish National Power Transmission System: SF6 circuit breakers, transmission lines, transformer centers and protection relays , 2014, 2014 International Conference on Probabilistic Methods Applied to Power Systems (PMAPS).
[56] Mahmud Fotuhi-Firuzabad,et al. Identifying critical components for reliability centred maintenance management of deregulated power systems , 2015 .
[57] Nicolás J. Scenna,et al. An optimization model for evaluating the economic impact of availability and maintenance notions during the synthesis and design of a power plant , 2015, Comput. Chem. Eng..
[58] Navid Ayoobian,et al. Multi-objective optimization of maintenance programs in nuclear power plants using Genetic Algorithm and Sensitivity Index decision making , 2016 .
[59] Mahmud Fotuhi-Firuzabad,et al. A New Multiattribute Decision Making Support Tool for Identifying Critical Components in Power Transmission Systems , 2018, IEEE Systems Journal.