Reliability modeling and availability analysis of combined cycle power plants

[1]  Z W Birnbaum,et al.  ON THE IMPORTANCE OF DIFFERENT COMPONENTS IN A MULTICOMPONENT SYSTEM , 1968 .

[2]  J. B. Fussell,et al.  How to Hand-Calculate System Reliability and Safety Characteristics , 1975, IEEE Transactions on Reliability.

[3]  J. B. Fussell HowtoHand-Calculate System Reliability andSafety Characteristics , 1975 .

[4]  Roy Billinton,et al.  Reliability evaluation of power systems , 1984 .

[5]  Roy Billinton,et al.  Reliability evaluation of engineering systems : concepts and techniques , 1992 .

[6]  P. Kundur,et al.  Dynamics models for combines cycle plants in power system studies , 1994 .

[7]  L. Balling,et al.  Probabilistic outage analysis of a combined-cycle power plant , 1995 .

[8]  M. E. Beehler,et al.  Reliability centered maintenance for transmission systems , 1996 .

[9]  S. Camporeale,et al.  Design and off-design performance of advanced mixed gas-steam cycle power plants , 1996, IECEC 96. Proceedings of the 31st Intersociety Energy Conversion Engineering Conference.

[10]  Rc Okonkwo Thermal Power Stations' Reliability Evaluation in a Hydrothermal System , 1997 .

[11]  D. Sáez,et al.  Fuzzy modelling for a combined cycle power plant , 1999, FUZZ-IEEE'99. 1999 IEEE International Fuzzy Systems. Conference Proceedings (Cat. No.99CH36315).

[12]  P. L. So,et al.  Dynamic modelling of a combined cycle plant for power system stability studies , 2000, 2000 IEEE Power Engineering Society Winter Meeting. Conference Proceedings (Cat. No.00CH37077).

[13]  Marzuki Khalid,et al.  Modeling of a superheater for a combined cycle power plant , 2000, 2000 TENCON Proceedings. Intelligent Systems and Technologies for the New Millennium (Cat. No.00CH37119).

[14]  W. Reder,et al.  Reliability centered maintenance for distribution underground systems , 2000, 2000 Power Engineering Society Summer Meeting (Cat. No.00CH37134).

[15]  S. Suzaki,et al.  Mathematical model for a combined cycle plant and its implementation in an analogue power system simulator , 2000, 2000 IEEE Power Engineering Society Winter Meeting. Conference Proceedings (Cat. No.00CH37077).

[16]  S. Takriti,et al.  Coordinating Fuel Inventory and Electric Power Generation under Uncertainty , 2001, IEEE Power Engineering Review.

[17]  W. Li,et al.  A reliability based approach to transmission maintenance planning and its application in BC Hydro system , 2001, 2001 Power Engineering Society Summer Meeting. Conference Proceedings (Cat. No.01CH37262).

[18]  Lina Bertling,et al.  Reliability-centred maintenance for electric power distribution systems , 2002 .

[19]  J. Munoz,et al.  Natural gas network modeling for power systems reliability studies , 2003, 2003 IEEE Bologna Power Tech Conference Proceedings,.

[20]  J. Munoz-Estrada,et al.  Including combined-cycle power plants in generation system reliability studies , 2005, 2004 International Conference on Probabilistic Methods Applied to Power Systems.

[21]  Wenyuan Li,et al.  Risk Assessment Of Power Systems: Models, Methods, and Applications , 2004 .

[22]  A.F. Brandao,et al.  Optimization of the maintenance of oil filled power transformers based on reliability criteria , 2004, 2004 IEEE/PES Transmision and Distribution Conference and Exposition: Latin America (IEEE Cat. No. 04EX956).

[23]  J.S. Heo,et al.  A multi-agent system-based intelligent steady-state model for a power plant , 2005, Proceedings of the 13th International Conference on, Intelligent Systems Application to Power Systems.

[24]  Black Power Plant Engineering , 2005 .

[25]  Chen-Ching Liu,et al.  Implementation of reliability-centered maintenance for circuit breakers , 2005, IEEE Power Engineering Society General Meeting, 2005.

[26]  D.W. Holladay,et al.  Reliability Centered Maintenance Study on Voltage Regulators , 2006, ESMO 2006 - 2006 IEEE 11th International Conference on Transmission & Distribution Construction, Operation and Live-Line Maintenance.

[27]  V. Miranda,et al.  Multiobjective Optimization Applied to Maintenance Policy for Electrical Networks , 2007, IEEE Transactions on Power Systems.

[28]  J. Buchta,et al.  Reliability of large power units in probabilistic approach , 2007, 2007 9th International Conference on Electrical Power Quality and Utilisation.

[29]  Armen Der Kiureghian,et al.  Availability, reliability and downtime of systems with repairable components , 2007, Reliab. Eng. Syst. Saf..

[30]  Gilberto Francisco Martha de Souza,et al.  Availability Analysis of Gas Turbines Used in Power Plants , 2009 .

[31]  Lin Gao,et al.  Modeling of combined cycle power plant based on a genetic algorithm parameter identification method , 2010, 2010 Sixth International Conference on Natural Computation.

[32]  Mirko Palazzo,et al.  Availability analysis of combined cycle power plant layouts which employ generator circuit-breakers and three-winding step-up transformers , 2010, 2010 IEEE International Energy Conference.

[33]  Lasse Rosendahl Advanced power plant materials, design and technology , 2010 .

[34]  Ebrahim Babaei,et al.  A new modeling method for reliability evaluation of Thermal Power Plants , 2010, 2010 IEEE International Conference on Power and Energy.

[35]  Jun Deng,et al.  Modeling and simulation of combined diesel and gas turbine propulsion system mission reliability , 2011, Proceedings 2011 International Conference on Transportation, Mechanical, and Electrical Engineering (TMEE).

[36]  Sharif,et al.  AN APPROACH ON CRITICAL COMPONENT IDENTIFICATION IN RELIABILITY CENTERED MAINTENANCE OF POWER DISTRIBUTION SYSTEMS BASED ON ANALYTICAL HIERARCHICAL PROCESS , 2011 .

[37]  Janusz Buchta,et al.  Estimation of reliability indices of power machinery in 370 MW rated power units operating in polish power system , 2011, 11th International Conference on Electrical Power Quality and Utilisation.

[38]  Mun-Kyeom Kim,et al.  A Reliability-Centered Approach to an Optimal Maintenance Strategy in Transmission Systems Using a Genetic Algorithm , 2011, IEEE Transactions on Power Delivery.

[39]  Payman Dehghanian,et al.  A reliability-oriented outlook on the critical components of power distribution systems , 2012 .

[40]  M. L. Dewal,et al.  System Reliability and Fault Tree Analysis of SeSHRS-Based Augmentation of Hydrogen: Dedicated for Combined Cycle Power Plants , 2012, IEEE Systems Journal.

[41]  N. Taylor,et al.  Identifying Critical Components for Transmission System Reliability , 2012, IEEE Transactions on Power Systems.

[42]  Mahmud Fotuhi-Firuzabad,et al.  Critical Component Identification in Reliability Centered Asset Management of Power Distribution Systems Via Fuzzy AHP , 2012, IEEE Systems Journal.

[43]  Mladen Kezunovic,et al.  Assessing circuit breaker life cycle using condition-based data , 2013, 2013 IEEE Power & Energy Society General Meeting.

[44]  Mladen Kezunovic,et al.  Security-based circuit breaker maintenance management , 2013, 2013 IEEE Power & Energy Society General Meeting.

[45]  Mladen Kezunovic,et al.  Cost/benefit analysis for circuit breaker maintenance planning and scheduling , 2013, 2013 North American Power Symposium (NAPS).

[46]  J. Rubio-Romero,et al.  A model for the preventive maintenance scheduling of power plants including wind farms , 2013, Reliab. Eng. Syst. Saf..

[47]  R. Billinton,et al.  A Comprehensive Scheme for Reliability-Centered Maintenance in Power Distribution Systems—Part II: Numerical Analysis , 2013, IEEE Transactions on Power Delivery.

[48]  Abdullah Al Mamun,et al.  A new schematic design of STG and GTG based power plant with higher efficiency , 2013, 2013 International Conference on Informatics, Electronics and Vision (ICIEV).

[49]  R. Billinton,et al.  A Comprehensive Scheme for Reliability Centered Maintenance in Power Distribution Systems—Part I: Methodology , 2013, IEEE Transactions on Power Delivery.

[50]  G. R. Biswal,et al.  Cool the Generators: System Reliability and Fault Tree Analysis of Hydrogen Cooling Systems , 2013, IEEE Industrial Electronics Magazine.

[51]  Janusz Buchta,et al.  Modelling of thermal power plants reliability , 2013, 4th International Conference on Power Engineering, Energy and Electrical Drives.

[52]  Mladen Kezunovic,et al.  Circuit breaker operational health assessment via condition monitoring data , 2014, 2014 North American Power Symposium (NAPS).

[53]  Roy Billinton,et al.  A practical application of the Delphi method in maintenance-targeted resource allocation of distribution utilities , 2014, 2014 International Conference on Probabilistic Methods Applied to Power Systems (PMAPS).

[54]  S. S. Kachhwaha,et al.  Development of reliability index for combined cycle power plant using graph theoretic approach , 2014 .

[55]  Aydogan Ozdemir,et al.  RCAM model for Turkish National Power Transmission System: SF6 circuit breakers, transmission lines, transformer centers and protection relays , 2014, 2014 International Conference on Probabilistic Methods Applied to Power Systems (PMAPS).

[56]  Mahmud Fotuhi-Firuzabad,et al.  Identifying critical components for reliability centred maintenance management of deregulated power systems , 2015 .

[57]  Nicolás J. Scenna,et al.  An optimization model for evaluating the economic impact of availability and maintenance notions during the synthesis and design of a power plant , 2015, Comput. Chem. Eng..

[58]  Navid Ayoobian,et al.  Multi-objective optimization of maintenance programs in nuclear power plants using Genetic Algorithm and Sensitivity Index decision making , 2016 .

[59]  Mahmud Fotuhi-Firuzabad,et al.  A New Multiattribute Decision Making Support Tool for Identifying Critical Components in Power Transmission Systems , 2018, IEEE Systems Journal.