Cost overruns and financial risk in the construction of nuclear power reactors: A critical appraisal

Lovering and colleagues attempt to advance understanding of construction cost escalation risks inherent in building nuclear reactors and power plants, a laudable goal. Although we appreciate their focus on capital cost increases and overruns, we maintain in this critical appraisal that their study conceptualizes cost issues in a limiting way. Methodological choices in treating different cost categories by the authors mean that their conclusions are more narrowly applicable than they describe. We also argue that their study is factually incorrect in its criticism of the previous peer-reviewed literature. Earlier work, for instance, has compared historical construction costs for nuclear reactors with other energy sources, in many countries, and extending over several decades. Lastly, in failing to be transparent about the limitations of their own work, Lovering et al. have recourse to a selective choice of data, unbalanced analysis, and biased interpretation.

[1]  Didier Sornette,et al.  Reassessing the safety of nuclear power , 2016 .

[2]  Joshua M. Pearce Limitations of Nuclear Power as a Sustainable Energy Source , 2012 .

[3]  Geoffrey G. Eichholz Nukenomics: The Commercialization of Britain’s Nuclear Industry , 2008 .

[4]  Didier Sornette,et al.  Of Disasters and Dragon Kings: A Statistical Analysis of Nuclear Power Incidents and Accidents , 2015, Risk analysis : an official publication of the Society for Risk Analysis.

[5]  N. Hultman The political economy of nuclear energy , 2011 .

[6]  Sanne Lemmens,et al.  Assessment of the actual sustainability of nuclear fission power , 2014 .

[7]  Nathan E. Hultman,et al.  A reactor-level analysis of busbar costs for US nuclear plants, 1970-2005 , 2007 .

[8]  Yi-chong Xu,et al.  The Politics of Nuclear Energy in China , 2010 .

[9]  Brian Wynne,et al.  Technical analysis of IIASA energy scenarios , 1984, Nature.

[10]  Benjamin K. Sovacool,et al.  Construction Cost Overruns and Electricity Infrastructure: An Unavoidable Risk? , 2014 .

[11]  Alexander Q. Gilbert,et al.  Risk, innovation, electricity infrastructure and construction cost overruns: Testing six hypotheses , 2014 .

[12]  Kristin Sharon Shrader-Frechette,et al.  Climate Change, Nuclear Economics, and Conflicts of Interest , 2011, Sci. Eng. Ethics.

[13]  Mark Bolinger,et al.  Utility-Scale Solar 2012: An Empirical Analysis of Project Cost, Performance, and Pricing Trends in the United States , 2014 .

[14]  Arnulf Grubler,et al.  The costs of the French nuclear scale-up: A case of negative learning by doing , 2010 .

[15]  Ryan Wiser,et al.  2009 Wind Technologies Market Report , 2010 .

[16]  Benjamin K. Sovacool,et al.  The National Politics of Nuclear Power: Economics, Security, and Governance , 2012 .

[17]  Arthur Yip,et al.  Historical construction costs of global nuclear power reactors , 2016 .

[18]  D. Lidgate Technocrats and Nuclear Politics , 1989 .

[19]  Steve Thomas,et al.  Competitive energy markets and nuclear power: Can we have both, do we want either? , 2010 .

[20]  J. Besant-Jones,et al.  Estimating Construction Costs and Schedules: Experience With Power Generation Projects in Developing Countries , 1996 .

[21]  Benjamin K. Sovacool,et al.  An international comparative assessment of construction cost overruns for electricity infrastructure , 2014 .

[22]  Robert Gross,et al.  Cost estimates for nuclear power in the UK , 2013 .

[23]  John M. Marshall,et al.  Costs of Nuclear Power Plant Construction: Theory and New Evidence , 1991 .

[24]  M. Ramana,et al.  Back to the Future , 2015 .