Priority Scheduling for a Flexible Job Shop with a Reconfigurable Manufacturing Cell

This paper considers a scheduling problem in a flexible job shop with a reconfigurable manufacturing cell. The flexible job shop has both operation and routing flexibilities, which can be represented in the form of a multiple process plan, i.e. each part can be processed through alternative operations, each of which can be processed on alternative machines. The scheduling problem has three decision variables: (a) selecting operation/machine pairs for each part; (b) sequencing of parts to be fed into the reconfigurable manufacturing cell; and (c) sequencing of the parts assigned to each machine. Due to the reconfigurable manufacturing cell’s ability of adjusting the capacity, functionality and flexibility to the desired levels, the priority scheduling approach is proposed in which the three decisions are made at the same time by combining operation/machine selection rules, input sequencing rules and part sequencing rules. To show the performances of various rule combinations, simulation experiments were done on various instances generated randomly using the experiences of the manufacturing experts, and the results are reported for the objectives of minimizing makespan, mean flow time and mean tardiness, respectively.

[1]  Thomas E. Morton,et al.  Myopic Heuristics for the Single Machine Weighted Tardiness Problem , 1982 .

[2]  Lale Özbakir,et al.  Using multiple objective tabu search and grammars to model and solve multi-objective flexible job shop scheduling problems , 2004, J. Intell. Manuf..

[3]  Lihui Wang,et al.  Reconfigurable manufacturing systems: the state of the art , 2008 .

[4]  Amiya K. Chakravarty,et al.  Production Scheduling During Phased Implementation of Flexible Manufacturing Cells , 1990 .

[5]  Hyoung-Ho Doh,et al.  A priority scheduling approach for flexible job shops with multiple process plans , 2013 .

[6]  Yeong-Dae Kim,et al.  Capacity planning for phased implementation of flexible manufacturing systems under budget restrictions , 1998 .

[7]  Ming Liang,et al.  Combined part selection, load sharing and machine loading problem in hybrid manufacturing systems , 1992 .

[8]  A. Galip Ulsoy,et al.  Trends and perspectives in flexible and reconfigurable manufacturing systems , 2002, J. Intell. Manuf..

[9]  Milton L. Smith,et al.  A dynamic heuristic-based algorithm to part input sequencing in flexible manufacturing systems for mass customization capability , 2007 .

[10]  Jesuk Ko,et al.  A symbiotic evolutionary algorithm for the integration of process planning and job shop scheduling , 2003, Comput. Oper. Res..

[11]  Mitsuo Gen,et al.  A hybrid genetic and variable neighborhood descent algorithm for flexible job shop scheduling problems , 2008, Comput. Oper. Res..

[12]  Ying-Chin Ho,et al.  Solving cell formation problems in a manufacturing environment with flexible processing and routeing capabilities , 1996 .

[13]  Dong-Ho Lee,et al.  Part-mix allocation in a hybrid manufacturing system with a flexible manufacturing cell and a conventional jobshop , 1996 .

[14]  A. Galip Ulsoy,et al.  Reconfigurable manufacturing systems: Key to future manufacturing , 2000, J. Intell. Manuf..

[15]  C Riago TARDINESS MINIMIZATION IN A FLEXIBLE JOB SHOP: A TABU SEARCH APPROACH , 2004 .

[16]  Jean-Charles Billaut,et al.  A tabu search and a genetic algorithm for solving a bicriteria general job shop scheduling problem , 2008, Eur. J. Oper. Res..

[17]  Yeong-Dae Kim,et al.  Two-stage heuristic algorithms for part input sequencing in flexible manufacturing systems , 2001, Eur. J. Oper. Res..

[18]  Yeong-Dae Kim,et al.  Scheduling algorithms for flexible manufacturing systems with partially grouped machines , 1999 .

[19]  Mitsuo Gen,et al.  Scheduling jobs and maintenances in flexible job shop with a hybrid genetic algorithm , 2006, J. Intell. Manuf..

[20]  F. Jovane,et al.  Reconfigurable Manufacturing Systems , 1999 .

[21]  Lale Özbakır,et al.  Mathematical models for job-shop scheduling problems with routing and process plan flexibility , 2010 .

[22]  Kavita Guliani,et al.  Capacity Planning , 2015, login Usenix Mag..

[23]  Yong-Ju Kwon,et al.  Input sequencing and scheduling for a reconfigurable manufacturing system with a limited number of fixtures , 2013 .

[24]  Hyoung-Ho Doh,et al.  Loading algorithms for flexible manufacturing systems with partially grouped unrelated machines and additional tooling constraints , 2012 .

[25]  Zhiming Wu,et al.  An effective hybrid optimization approach for multi-objective flexible job-shop scheduling problems , 2005, Comput. Ind. Eng..

[26]  Taïcir Loukil,et al.  A multi-objective production scheduling case study solved by simulated annealing , 2007, Eur. J. Oper. Res..