Mechanism of Early-Onset Breakdown at On-Ramp Bottlenecks on Shanghai, China, Expressways
暂无分享,去创建一个
[1] Michael J. Cassidy,et al. Test of Theory of Driver Behavior on Homogeneous Freeways , 2004 .
[2] R. Bertini,et al. Empirical Study of Traffic Features at a Freeway Lane Drop , 2005 .
[3] Amjad Dehman. Breakdown Maturity Phenomenon at Wisconsin Freeway Bottlenecks , 2012 .
[4] 黒田 孝次,et al. Highway Capacity Manual改訂の動向--テイラ-教授の講演より , 1984 .
[5] Carlos F. Daganzo,et al. A BEHAVIORAL THEORY OF MULTI-LANE TRAFFIC FLOW. PART I, LONG HOMOGENEOUS FREEWAY SECTIONS , 1999 .
[6] Carlos F. Daganzo,et al. A BEHAVIORAL THEORY OF MULTI-LANE TRAFFIC FLOW. PART II, MERGES AND THE ONSET OF CONGESTION , 1999 .
[7] Y. Sugiyama,et al. Traffic jams without bottlenecks—experimental evidence for the physical mechanism of the formation of a jam , 2008 .
[8] Gábor Orosz,et al. Exciting traffic jams: nonlinear phenomena behind traffic jam formation on highways. , 2009, Physical review. E, Statistical, nonlinear, and soft matter physics.
[9] Peter Hidas,et al. Modelling vehicle interactions in microscopic simulation of merging and weaving , 2005 .
[10] Michael J. Cassidy,et al. Increasing Capacity of an Isolated Merge by Metering its On-Ramp , 2004 .
[11] Robert L. Bertini,et al. Some observed queue discharge features at a freeway bottleneck , 2002 .
[12] Steven A. Smith,et al. Freeway data collection for studying vehicle interactions : technical report , 1985 .
[13] M. Cassidy,et al. Lane changing patterns of bane and benefit: Observations of an uphill expressway , 2011 .
[14] Wei Shen,et al. Numerical Investigation of Stop-and-Go Traffic Patterns Upstream of Freeway Lane Drop , 2009 .
[15] D. Levinson,et al. Some Properties of Flows at Freeway Bottlenecks , 2004 .
[16] Boris S. Kerner,et al. Introduction to Modern Traffic Flow Theory and Control: The Long Road to Three-Phase Traffic Theory , 2009 .
[17] S. Wong,et al. An analytical shock-fitting algorithm for LWR kinematic wave model embedded with linear speed–density relationship , 2002 .
[18] Hani S. Mahmassani,et al. Predicting Flow Breakdown Probability and Duration in Stochastic Network Models: Impact on Travel Time Reliability , 2011 .
[19] H. Michael Zhang,et al. Oscillatory Traffic Flow Patterns Induced by Queue Spillback in a Simple Road Network , 2008, Transp. Sci..
[20] M. Cassidy,et al. Some traffic features at freeway bottlenecks , 1999 .
[21] H. M. Zhang,et al. Investigation of Early-Onset Breakdown Phenomenon at Urban Expressway Bottlenecks in Shanghai, China , 2013 .
[22] C. Daganzo,et al. Possible explanations of phase transitions in highway traffic , 1999 .
[23] L. Craig Davis,et al. Introduction to Modern Traffic Flow Theory and Control: The Long Road to Three-Phase Traffic Theory , 2009 .
[24] Jian Sun,et al. Observations and Analysis of Multistep-Approach Lane Changes at Expressway Merge Bottlenecks in Shanghai, China , 2013 .