Automated Assembly Sequence Planning and Subassembly Detection
暂无分享,去创建一个
Soundar Kumara | Deepak Agrawal | Daniel A. Finke | Soundar R. T. Kumara | D. Finke | Deepak Agrawal
[1] Kalyan Ghosh,et al. A simplified and efficient representation for evaluation and selection of assembly sequences , 2003, Comput. Ind..
[2] Jean-Claude Latombe,et al. A General Framework for Assembly Planning: The Motion Space Approach , 1998, SCG '98.
[3] Hyoung-Ro Lee,et al. Improved methods of assembly sequence determination for automatic assembly systems , 2001, Eur. J. Oper. Res..
[4] Arthur C. Sanderson,et al. AND/OR graph representation of assembly plans , 1986, IEEE Trans. Robotics Autom..
[5] Heedong Ko,et al. Automatic assembling procedure generation from mating conditions , 1987 .
[6] Hoda A. ElMaraghy,et al. GAPP: A generative assembly process planner , 1996 .
[7] Marco Santochi,et al. Computer-aided planning of assembly operations : the selection of assembly sequences , 1992 .
[8] N. S. Ong,et al. Automatic Subassembly Detection from a Product Model for Disassembly Sequence Generation , 1999 .
[9] Sun Jin,et al. Design automation and optimization of assembly sequences for complex mechanical systems , 2010 .
[10] Arthur C. Sanderson,et al. Representations of mechanical assembly sequences , 1991, IEEE Trans. Robotics Autom..
[11] Qiang Su,et al. A hierarchical approach on assembly sequence planning and optimal sequences analyzing , 2009 .
[12] Zhongqin Lin,et al. Automated sequencing and sub-assembly detection in automobile body assembly planning , 2002 .
[13] Jean-Claude Latombe,et al. Geometric Reasoning About Mechanical Assembly , 1994, Artif. Intell..
[14] Michael H. Goldwasser,et al. AN EFFICIENT SYSTEM FOR GEOMETRIC ASSEMBLY SEQUENCE GENERATION AND EVALUATION , 1995 .
[15] Dong-Ho Lee,et al. Parallel disassembly sequencing with sequence-dependent operation times , 2001 .
[16] Geoffrey Boothroyd,et al. Product design for manufacture and assembly , 1994, Comput. Aided Des..
[17] David Ben-Arieh,et al. Computer-aided process planning for assembly: generation of assembly operations sequence , 1994 .
[18] D. Dutta,et al. Automatic Disassembly and Total Ordering in Three Dimensions , 1991 .