Generating system reliability optimization
暂无分享,去创建一个
[1] Guangbin Lian. THE APPLICATION OF THE MONTE CARLO SIMULATION METHOD TO TERMINAL STATIONS , 1990 .
[2] Pravin Varaiya,et al. Markets and pricing for interruptible electric power , 1993 .
[3] Roy Billinton,et al. Overall adequacy assessment of an electric power system , 1992 .
[4] Roy Billinton,et al. Station reliability evaluation using a Monte Carlo approach , 1993 .
[5] T.A.M. Sharaf,et al. Reliability Optimization for Transmission Expansion Planning , 1982, IEEE Transactions on Power Apparatus and Systems.
[6] Roy Billinton,et al. Basic Power System Reliability Concepts , 1990 .
[7] R. Ramakumar,et al. An approach to assess the performance of utility-interactive wind electric conversion systems , 1991 .
[8] Ron Allan,et al. Modeling and assessment of station originated outages for composite systems reliability evaluation , 1988 .
[9] Z. M. Salameh,et al. Optimum windmill-site matching , 1992 .
[10] Keith D. C. Stoodley,et al. Time Series Analysis: Theory and Practice I , 1982 .
[11] Roy Billinton,et al. Incorporation of wind energy conversion systems in conventional generating capacity adequacy assessment , 1992 .
[12] A. O. Ekwue. Economics and reliability of supply of developing power systems , 1986 .
[13] Roy Billinton,et al. Impact of power wheeling on composite system adequacy evaluation , 1996 .
[14] Ellis Horowitz,et al. Fundamentals of Data Structures , 1984 .
[15] C. Singh,et al. Reliability Modeling of Generation Systems Including Unconventional Energy Sources , 1985, IEEE Transactions on Power Apparatus and Systems.
[16] G. Thomann,et al. The time variation of wind speeds and windfarm power output in Kansas , 1988 .
[17] Anastasios G. Bakirtzis,et al. A probabilistic method for the evaluation of the performance and the reliability of wind-diesel energy systems , 1993 .
[18] Roy Billinton,et al. Reliability Evaluation of Engineering Systems , 1983 .
[19] R. Billinton,et al. Determination of interruptible load carrying capability using sequential Monte Carlo simulation , 1999, Engineering Solutions for the Next Millennium. 1999 IEEE Canadian Conference on Electrical and Computer Engineering (Cat. No.99TH8411).
[20] J. Endrenyi,et al. Reliability Evaluation of Transmission Systems with Switching After Faults Approximations and a Computer Program , 1973 .
[21] R. Billinton,et al. A Reliability Test System for Educational Purposes-Basic Data , 1989, IEEE Power Engineering Review.
[22] Roy Billinton,et al. Utilization of interrupted energy assessment rates to evaluate reliability worth in electric power systems , 1993 .
[23] Roy Billinton,et al. Station-initiated outages in composite-system adequacy evaluation , 1987 .
[24] Roy Billinton,et al. A minimum cost assessment method for composite generation and transmission system expansion planning , 1993 .
[25] H. Outhred,et al. Forward contracts for the operation of an electricity industry under spot pricing , 1990 .
[26] R. Billinton,et al. Comparison of Two Alternate Methods to Establish an Interrupted Energy Assessment Rate , 1987, IEEE Transactions on Power Systems.
[27] A. Sallam,et al. Evaluation of optimal-reliability indices for electrical distribution systems , 1990 .
[28] T. Gedra. Optional forward contracts for electric power markets , 1994 .
[29] John A. Cornell. Classical and Modern Regression With Applications , 1987 .
[30] A. V. Machias,et al. Fuzzy risk index of wind sites , 1992 .
[31] Adly A. Girgis,et al. Optimization of power system reliability level by stochastic programming , 1993 .
[32] M. S. Kandil,et al. Generation expansion planning: an expert system approach , 1988 .
[33] N. Chowdhury,et al. Interruptible load considerations in spinning reserve assessment of isolated and interconnected generating systems , 1990 .
[34] Luís Ferreira. Evaluation of short-term wind predictability , 1992 .
[35] Hua Chen,et al. Effect of wind turbine parameters on the capacity adequacy of generating systems using wind energy , 1997, IEEE WESCANEX 97 Communications, Power and Computing. Conference Proceedings.
[36] T. J. Hammons,et al. Assessment of alternative energy sources for generation of electricity in the UK following privatisation of the electricity supply industry , 1990 .
[37] R. J. Ringlee,et al. Bulk power system reliability criteria and indices trends and future needs , 1994 .
[38] K. Chou,et al. Simulation of hourly wind speed and array wind power , 1981 .
[39] H. M. Merrill,et al. Conflicting objectives and risk in power system planning , 1993 .
[40] Roy Billinton,et al. Power-system reliability in perspective , 1984 .
[41] Roy Billinton,et al. Effect of bus load uncertainty and correlation in composite system adequacy evaluation , 1991 .
[42] H. Chen,et al. Reliability optimization in generalized stochastic-flow networks , 1991 .
[43] Shien-Ming Wu,et al. Time series and system analysis with applications , 1983 .
[44] Gwilym M. Jenkins,et al. Time series analysis, forecasting and control , 1972 .
[45] T. S. Chung,et al. A chronological probabilistic approach in production costing with multi-area transfer consideration , 1997 .
[46] Roy Billinton,et al. Cost/benefit approach to establish optimum adequacy level for generating system planning , 1988 .
[47] Hossein Salehfar,et al. Modeling and Evaluation of the System Reliability Effects of Direct Load Control , 1989, IEEE Power Engineering Review.
[48] Roy Billinton,et al. Evaluation of reliability worth in an electric power system , 1994 .
[49] Roy Billinton,et al. Utilization of interrupted energy assessment rates in generation and transmission system planning , 1991 .
[50] Roy Billinton,et al. A Computerized Approach to Substation and Switching Station Reliability Evaluation , 1974 .
[51] R. Billinton,et al. Station Originated Multiple Outages in the Reliability Analysis of a Composite Generation and Transmission System , 1981, IEEE Transactions on Power Apparatus and Systems.