Heuristics for the common due date weighted tardiness problem
暂无分享,去创建一个
[1] Wayne E. Smith. Various optimizers for single‐stage production , 1956 .
[2] Albert Schild,et al. On Scheduling Tasks with Associated Linear Loss Functions , 1961 .
[3] Eugene L. Lawler. On Scheduling Problems with Deferral Costs , 1964 .
[4] J. M. Moore,et al. A Functional Equation and its Application to Resource Allocation and Sequencing Problems , 1969 .
[5] Jan Karel Lenstra,et al. Complexity of machine scheduling problems , 1975 .
[6] E. Lawler. A “Pseudopolynomial” Algorithm for Sequencing Jobs to Minimize Total Tardiness , 1977 .
[7] E.L. Lawler,et al. Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey , 1977 .
[8] Thomas E. Morton,et al. Myopic Heuristics for the Single Machine Weighted Tardiness Problem , 1982 .
[9] E. L. Lawler,et al. A fully polynomial approximation scheme for the total tardiness problem , 1982, Oper. Res. Lett..
[10] Jerzy Kyparisis,et al. Single machine scheduling research , 1987 .
[11] Ram Mohan V. Rachamadugu,et al. Technical Note - A Note on the Weighted Tardiness Problem , 1987, Oper. Res..