Equipment Layout Improvement for Large-Scale Hot Cell Facility Logistics

This study presents approaches to equipment layout improvement for a large-scale hot cell facility. First, the original facility layout and target process are introduced, including the basic information and specifications. Second, the flow of process materials is analyzed and the relationships are evaluated in detail using a “from-to chart” and a “relationship chart” for the original layout, and the logistics are simulated using the selected discrete event simulator to calculate the traveling distances of process materials handled by teleoperated material handling systems. Third, the original layout is modified using the total closeness rating (TCR), and the efficiency and usage of the material handling system are calculated and compared with the original case to evaluate the efficiency improvement of the modified layout. This modification process, which included load reduction, enabled those aspects of the material handling system that would need to be changed to be identified; these changes were suggested by a quantitative analysis of the logistics between each pair of stations and intuitive rearrangement based on charts and figures. These approaches could be an initial step in the large-scale hot cell design process, with future work to follow.

[1]  Mario Tucci,et al.  Layout Design for a Low Capacity Manufacturing Line: A Case Study , 2013 .

[2]  Han-Soo Lee,et al.  Current Status of Pyroprocessing Development at KAERI , 2013 .

[3]  Andrew Kusiak,et al.  The facility layout problem , 1987 .

[4]  Peter Johansson,et al.  A model for effective development of plant layouts and material handling systems : En modell för effektiv utformning av fabrikslayouter och materialhanteringssystem , 2006 .

[5]  L. R. Foulds Techniques for Facilities Layout: Deciding which Pairs of Activities Should be Adjacent , 1983 .

[6]  M.S.J. Hashmi,et al.  Design and analysis of a virtual factory layout , 2001 .

[7]  W. Marsden I and J , 2012 .

[8]  G. Mirabelli,et al.  Material Flow Analysis and Plant Lay-Out Optimization of a Manufacturing System , 2005, 2005 IEEE Intelligent Data Acquisition and Advanced Computing Systems: Technology and Applications.

[10]  Hansoo Lee,et al.  PYROPROCESSING TECHNOLOGY DEVELOPMENT AT KAERI , 2011 .

[11]  Wolfgang Kuehn,et al.  Digital Factory - Simulation Enhancing the Product and Production Engineering Process , 2006, Proceedings of the 2006 Winter Simulation Conference.

[12]  Seong-In Moon,et al.  Development of Pyroprocess Integrated Inactive Demonstration Facility , 2012 .

[13]  Hau L. Lee,et al.  Strategic Analysis of Integrated Production-Distribution Systems: Models and Methods , 1988, Oper. Res..

[14]  Manocher Djassemi Improving factory layout under a mixed floor and overhead material handling condition , 2007 .

[15]  Hyo Jik Lee,et al.  Modeling of oxide reduction in repeated-batch pyroprocessing , 2016 .

[16]  Michael Schenk,et al.  Factory Planning Manual: Situation-Driven Production Facility Planning , 2009 .

[17]  Saifallah Benjaafar,et al.  Design of flexible plant layouts , 2000 .

[18]  T. Nakajima,et al.  Hazardous-duty Robots - Experiences And Needs , 1989, Proceedings. IEEE/RSJ International Workshop on Intelligent Robots and Systems '. (IROS '89) 'The Autonomous Mobile Robots and Its Applications.

[19]  Chuck Solbrig,et al.  PYROPROCESSING PROGRESS AT IDAHO NATIONAL LABORATORY , 2007 .

[20]  Han-Soo Lee,et al.  STATUS OF PYROPROCESSING TECHNOLOGY DEVELOPMENT IN KOREA , 2010 .