Preliminary Reliability Allocation Method for Fusion Facility Based on Probabilistic Safety Assessment

Abstract The construction of ITER indicates that the development of fusion energy has entered the engineering stage. Reliability assurance, which is essential in the design and safety supervision of a new reactor, is an urgent problem to be solved in the process of fusion reactor engineering. But, up to now, the reliability work of a fusion device has not considered the security of the fusion reactor. This paper proposes a method to establish a reliability index for fusion safety–related components. The reliability index is a useful indicator to evaluate the reliability of the system, and it is also the regulatory basis for regulatory authorities. First, this paper gives the recommended values of probability safety goals for a fusion reactor. Second, the reliability requirements for the fusion safety system that meet the safety goals are calculated. In this part, a Probability Safety Assessment (PSA) is adopted to establish the risk models and calculate the undesired consequences of a fusion reactor. Based on the PSA analysis results, a risk-informed approach is used to categorize the plant structures, systems, and components of the fusion reactor as four categories according to their safety significance. Last, the reliability index of the safety-related components is given based on the results of the risk-informed safety categorization and PSA analysis results. The validation of the reliability index system is still being studied, and this work is expected to support the reliability evaluation and safety supervision of a fusion reactor in the future.

[1]  CONSIDERATIONS ON THE APPLICATION OF THE IAEA SAFETY REQUIREMENTS FOR THE DESIGN OF NUCLEAR POWER PLANTS , 2014 .

[2]  Victor F. Weisskopf,et al.  Reactor safety study , 1976 .

[3]  D. Maisonnier,et al.  The European power plant conceptual study , 2005 .

[4]  Zhang Gang-ping Development of Third Qinshan nuclear power plant Risk Monitor , 2011 .

[5]  Zhao Jun Risk-informed SSCs categorization method in nuclear power plant , 2009 .

[6]  Yican Wu,et al.  Development of reliability and probabilistic safety assessment program RiskA , 2015 .

[7]  Massimo Zucchetti,et al.  Summary of the 1st International Workshop on Environmental, Safety and Economic Aspects of Fusion Power , 2016, Nuclear Fusion.

[8]  Liqin Hu,et al.  Risk monitor riskangel for risk-informed applications in nuclear power plants , 2016 .

[9]  Robert Aymar Overview of the ITER Project , 1997 .

[10]  Maria Teresa Porfiri,et al.  Operating experiences from existing fusion facilities in view of ITER safety and reliability , 2010 .

[11]  Yican Wu,et al.  Nuclear safety in the unexpected second nuclear era , 2019, Proceedings of the National Academy of Sciences.

[12]  Wang Fang,et al.  A new importance assessment method for risk‐informed SSC categorization , 2018 .

[13]  Chen Hai-yan Development of an integrated probabilistic safety assessment program , 2007 .

[14]  N. Holtkamp,et al.  An overview of the ITER project , 2007 .

[15]  Liqin Hu,et al.  Failure Modes and Effects Analysis on ITER DFLL-TBM system , 2012 .

[16]  Robertas Alzbutas,et al.  Reliability and safety analysis for systems of fusion device , 2015 .

[17]  Yican Wu,et al.  Conceptual design and testing strategy of a dual functional lithium–lead test blanket module in ITER and EAST , 2007 .

[18]  C. Alejaldre,et al.  Identification of safety gaps for fusion demonstration reactors , 2016, Nature Energy.

[19]  K. Okayama,et al.  RAMI analysis for ITER fuel cycle system , 2011 .

[20]  D. van Houtte,et al.  RAMI Approach for ITER , 2010 .