Preliminary Reliability Allocation Method for Fusion Facility Based on Probabilistic Safety Assessment
暂无分享,去创建一个
Fang Wang | Jie Wu | Jin Wang | Liqin Hu | Dagui Wang
[1] CONSIDERATIONS ON THE APPLICATION OF THE IAEA SAFETY REQUIREMENTS FOR THE DESIGN OF NUCLEAR POWER PLANTS , 2014 .
[2] Victor F. Weisskopf,et al. Reactor safety study , 1976 .
[3] D. Maisonnier,et al. The European power plant conceptual study , 2005 .
[4] Zhang Gang-ping. Development of Third Qinshan nuclear power plant Risk Monitor , 2011 .
[5] Zhao Jun. Risk-informed SSCs categorization method in nuclear power plant , 2009 .
[6] Yican Wu,et al. Development of reliability and probabilistic safety assessment program RiskA , 2015 .
[7] Massimo Zucchetti,et al. Summary of the 1st International Workshop on Environmental, Safety and Economic Aspects of Fusion Power , 2016, Nuclear Fusion.
[8] Liqin Hu,et al. Risk monitor riskangel for risk-informed applications in nuclear power plants , 2016 .
[9] Robert Aymar. Overview of the ITER Project , 1997 .
[10] Maria Teresa Porfiri,et al. Operating experiences from existing fusion facilities in view of ITER safety and reliability , 2010 .
[11] Yican Wu,et al. Nuclear safety in the unexpected second nuclear era , 2019, Proceedings of the National Academy of Sciences.
[12] Wang Fang,et al. A new importance assessment method for risk‐informed SSC categorization , 2018 .
[13] Chen Hai-yan. Development of an integrated probabilistic safety assessment program , 2007 .
[14] N. Holtkamp,et al. An overview of the ITER project , 2007 .
[15] Liqin Hu,et al. Failure Modes and Effects Analysis on ITER DFLL-TBM system , 2012 .
[16] Robertas Alzbutas,et al. Reliability and safety analysis for systems of fusion device , 2015 .
[17] Yican Wu,et al. Conceptual design and testing strategy of a dual functional lithium–lead test blanket module in ITER and EAST , 2007 .
[18] C. Alejaldre,et al. Identification of safety gaps for fusion demonstration reactors , 2016, Nature Energy.
[19] K. Okayama,et al. RAMI analysis for ITER fuel cycle system , 2011 .
[20] D. van Houtte,et al. RAMI Approach for ITER , 2010 .