Hospital CHCP system optimization assisted by TRNSYS building energy simulation tool

Abstract The feasibility study of a trigeneration plant intended to integrate the existing natural gas fired-boiler central plant serving a 714 bed hospital located in Parma, North of Italy, is presented. The electric load and the heat load for both sanitary hot water and process steam are estimated on an hourly basis from the monitored actual consumption. The space heating and the cooling loads, instead, are computed, on an hourly basis, by the building energy software tool TRNSYS, version 16, by accounting for the actual climate of the considered location. The energy analysis points out that the Primary Energy Saving (PES) index is inadequate for sizing the Combined Heat and Power generation system (CHP). The approach based on the second principle of thermodynamics, instead, allows to identify its optimal configuration and size, i.e. Combined generation of Heat, Cooling and Power (CHCP) with prime mover overall nominal capacity equal or higher than about 7 MW. The economic analysis confirms that the maximum annual money saving occurs with trigeneration at a prime mover overall nominal capacity of about 7 MW. At higher values the operating financial budget deteriorates because of a too low electricity selling price. At the optimal economic condition the CHCP system simple payback period is of about 15 months. The national policies supporting cogeneration have a great effect on the results of the economic analysis and beyond them cogeneration may loose its economic appeal.

[1]  George Mavrotas,et al.  Energy planning of a hospital using Mathematical Programming and Monte Carlo simulation for dealing with uncertainty in the economic parameters , 2010 .

[2]  Gian Luca Morini,et al.  New technologies for an effective energy retrofit of hospitals , 2006 .

[3]  M. J. Moran,et al.  Thermal design and optimization , 1995 .

[4]  Antonio Piacentino,et al.  A new approach to exergoeconomic analysis and design of variable demand energy systems , 2006 .

[5]  Marc Medrano,et al.  Integration of distributed generation systems into generic types of commercial buildings in California , 2008 .

[6]  Petr Stehlík,et al.  Integrating renewable sources of energy into an existing combined heat and power system , 2006 .

[7]  Alexandre Szklo,et al.  Energy consumption indicators and CHP technical potential in the Brazilian hospital sector , 2004 .

[8]  Luis M. Serra,et al.  Structure optimization of energy supply systems in tertiary sector buildings , 2009 .

[9]  Sara Rainieri,et al.  Modeling of a thermal energy storage system coupled with combined heat and power generation for the heating requirements of a University Campus , 2010 .

[10]  Weijun Gao,et al.  Optimal option of distributed generation technologies for various commercial buildings , 2009 .

[11]  Gaetano Florio,et al.  A mixed integer programming model for optimal design of trigeneration in a hospital complex , 2007 .

[12]  Alojz Poredoš,et al.  Economics of a trigeneration system in a hospital , 2006 .

[13]  Gian Luca Morini,et al.  Greenhouse gas reduction and primary energy savings via adoption of a fuel cell hybrid plant in a hospital , 2004 .

[14]  Antonio Piacentino,et al.  Optimal design of CHCP plants in the civil sector by thermoeconomics , 2007 .

[15]  L. Serra,et al.  Multicriteria synthesis of trigeneration systems considering economic and environmental aspects , 2012 .

[16]  Luis M. Serra,et al.  Geographic evaluation of trigeneration systems in the tertiary sector. Effect of climatic and electricity supply conditions , 2011 .

[17]  Luis M. Serra,et al.  Optimal synthesis of trigeneration systems subject to environmental constraints , 2011 .