Learning to see value-adding and non-value-adding work time in renovation production systems

For decades construction labour productivity has been stagnated or declining. Changing this issue requires new knowledge on the labour-intensive construction production system. The work sampling me...

[1]  Carl T. Haas,et al.  Setting Baseline Rates for On-Site Work Categories in the Construction Industry , 2015 .

[2]  Charles Egbu,et al.  Planning and control processes and techniques for refurbishment management , 1998 .

[3]  Bilal Ayub,et al.  Labor Productivity Assessment Using Activity Analysis on Semi High-Rise Building Projects in Pakistan , 2017 .

[4]  Farook Hamzeh,et al.  Understanding the planner’s role in lookahead construction planning , 2019, Production Planning & Control.

[5]  Lauri Koskela,et al.  Lean construction , 2018 .

[6]  Maryam Shahtaheri,et al.  Setting Target Rates for Construction Activity Analysis Categories , 2012 .

[7]  Charles O. Egbu Perceived degree of difficulty of management tasks in construction refurbishment work , 1995 .

[8]  Per-Erik Josephson,et al.  What do construction workers do? Direct observations in housing projects , 2005 .

[9]  Guilherme Henrich Development of a tool for diagnosing production management efficiency on construction sites , 2010 .

[10]  Charles Egbu,et al.  Skills, knowledge and competencies for managing construction refurbishment works , 1999 .

[11]  Søren Munch Lindhard Understanding the Effect of Variation in a Production System , 2014 .

[12]  Graham Winch,et al.  Benchmarking on-site productivity in France and the UK: a CALIBRE approach , 2001 .

[13]  Ahmad Hadavi,et al.  Lessons Learned from Multiphase Reconstruction Project , 1996 .

[14]  Paul M. Goodrum,et al.  U.S. construction labor productivity trends, 1970-1998 , 2000 .

[15]  Fwu‐Shiun Liou,et al.  Work Sampling Can Predict Unit Rate Productivity , 1986 .

[16]  Per-Erik Josephson,et al.  Why do work sampling studies in construction? The case of plumbing work in Scandinavia , 2013 .

[17]  Murat Gunduz,et al.  Assessment of delay factors in construction of sport facilities through multi criteria decision making , 2020 .

[18]  V. K. Handa,et al.  Forecasting productivity by work sampling , 1989 .

[19]  H. Randolph Thomas,et al.  Improving Productivity Estimates by Work Sampling , 1984 .

[20]  Leonhard E. Bernold,et al.  Effects of Design‐Integrated Process Planning on Productivity in Rebar Placement , 1994 .

[21]  Luis F. Alarcón,et al.  Coordination of teams, meetings, and managerial processes in construction projects: using a lean and complex adaptive mechanism , 2019, Production Planning & Control.

[22]  Farook Hamzeh,et al.  Impact of Activity Sequencing on Reducing Variability , 2019 .

[23]  Charles O. Egbu Refurbishment management: challenges and opportunities , 1997 .

[24]  Michael C. Gouett Activity Analysis for Continuous Productivity Improvement in Construction , 2010 .

[25]  Laurie Buys,et al.  Retrofitting Commercial Office Buildings for Sustainability: Tenants' Perspectives , 2008 .

[26]  Olav Torp,et al.  Labour productivity statistics: a reality check for the Norwegian construction industry , 2020 .

[27]  Ismail Bin Rahmat The planning and control process of refurbishment projects , 1997 .

[28]  Jochen Teizer,et al.  Determining the Relationship between Direct Work and Construction Labor Productivity in North America: Four Decades of Insights , 2020 .

[29]  Jochen Teizer,et al.  Construction resource efficiency improvement by Long Range Wide Area Network tracking and monitoring , 2020 .

[30]  Herman Glenn Ballard,et al.  THE LAST PLANNER SYSTEM OF PRODUCTION CONTROL , 2000 .

[31]  Bjørn Andersen,et al.  Analyzing electrical installation labor productivity through work sampling , 2017 .

[32]  Luis Miguel D. F. Ferreira,et al.  A methodology for the development of delay mitigation measures in construction projects , 2020 .

[33]  Jan Bröchner,et al.  Office conversions: the effects of craftsman-user interaction , 2000 .

[34]  Henry G. Irwig,et al.  Disturbance Scheduling Technique for Managing Renovation Work , 1988 .

[35]  Lauri Koskela,et al.  Towards a lean model for production management of refurbishment projects, VTT Technology: 94 , 2013 .

[36]  Søren Wandahl,et al.  Exploration of the reasons for delays in construction , 2014 .

[37]  Yogendra Kumar,et al.  Productivity Analysis of Small Construction Projects in India , 2014 .

[38]  H. Randolph Thomas Can Work Sampling Lower Construction Costs , 1981 .

[39]  Lauri Koskela,et al.  Understanding Production Management of Refurbishment Projects of a Housing Association – an Exploratory Case Study , 2014 .

[40]  Behrouz Zarei,et al.  Delay causes analysis in complex construction projects: a Semantic Network Analysis approach , 2018 .

[41]  Lauri Koskela,et al.  Why Hasn’T Waste Reduction Conquered Construction? , 2016 .

[42]  David Arditi,et al.  Trends in productivity improvement in the US construction industry , 2000 .

[43]  Robert D. Logcher,et al.  Management Impacts on Labor Productivity , 1978 .

[44]  Bo Terje Kalsaas WORK-TIME WASTE IN CONSTRUCTION , 2010 .

[45]  Bon-Gang Hwang,et al.  Improving labour productivity in process construction maintenance and shutdown/turnaround projects , 2018, International Journal of Construction Management.

[46]  Mohamed Abdel-Wahab,et al.  Trends of productivity growth in the construction industry across Europe, US and Japan , 2011 .

[47]  Olli Seppänen,et al.  Takt Time Planning: Lessons for Construction Industry from a Cruise Ship Cabin Refurbishment Case Study , 2016 .

[48]  Glenn Ballard,et al.  What Kind of Production Is Construction , 1998 .

[49]  Søren Wandahl,et al.  Continuous Improvements at Operator Level , 2020 .

[50]  Charles Odita Egbu Management education and training for refurbishment work within the construction industry , 1994 .

[51]  David Bryde,et al.  Applying Lean principles to a building refurbishment project: experiences of key stakeholders , 2012 .

[52]  Iris D. Tommelein,et al.  PARADE GAME :I MPACT OF WORK FLOW VARIABILITY ON TRADE PERFORMANCE , 1999 .

[53]  Charles O. Egbu,et al.  Refurbishment management practices in the shipping and construction industries — lessons to be learned: Comparative study of refurbishment management practices conducted to extend the boundaries of knowledge and encourage transfer of information between the sectors , 1996 .

[54]  Paul M. Goodrum,et al.  An analysis of construction productivity differences between Canada and the United States , 2014 .

[55]  Ronald Carl Smith Estimating and tendering for building work , 1986 .

[56]  Jie Gong,et al.  Effectiveness of craft time utilization in construction projects , 2011 .

[57]  Gary David Holt,et al.  Factors influencing craftsmen's productivity in Indonesia , 1997 .

[58]  Jochen Teizer,et al.  Application of Last Planner System to Modular Offshore Wind Construction , 2020 .

[59]  Luis F. Alarcón,et al.  Variability propagation in the production planning and control mechanism of construction projects , 2017 .

[60]  Serdar Ulubeyli,et al.  Effect of basic motivational factors on construction workforce productivity in turkey , 2008 .

[61]  Lauri Koskela,et al.  Developing a Lean Model for Production Management of Refurbishment Projects , 2012 .

[62]  Søren Wandahl,et al.  Feedback Loop—The Missing Link in Activity Analysis , 2020 .

[63]  Luis F. Alarcón,et al.  Investigating the relationship between planning reliability and project performance , 2007 .

[64]  Paul. Olomolaiye,et al.  Problems influencing craftsmen's productivity in Nigeria , 1987 .

[65]  Paul M. Goodrum,et al.  Activity Analysis for Direct-Work Rate Improvement in Construction , 2011 .

[66]  Olli Seppänen,et al.  Improving workflow and resource usage in construction schedules through location-based management system (LBMS) , 2018 .

[67]  Steven K. Thompson,et al.  Sample Size for Estimating Multinomial Proportions , 1987 .

[68]  Bo Terje Kalsaas,et al.  To Measure Workflow and Waste. A Concept for Continuous Improvement , 2014 .