An MILP Model for the Internal Audit Scheduling Problem
暂无分享,去创建一个
[1] F. Brian Talbot,et al. Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case , 1982 .
[2] Andreas Drexl,et al. Scheduling of Project Networks by Job Assignment , 1991 .
[3] Mario Vanhoucke,et al. An exact composite lower bound strategy for the resource-constrained project scheduling problem , 2018, Comput. Oper. Res..
[4] Armin Scholl,et al. A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer times , 2009 .
[5] E. Rolland,et al. Tabu search in audit scheduling , 1998, Eur. J. Oper. Res..
[6] Fayez F. Boctor,et al. An efficient genetic algorithm to solve the resource-constrained project scheduling problem with transfer times: The single mode case , 2018, Eur. J. Oper. Res..
[7] Bajis Dodin,et al. A decision support system for audit-staff scheduling with precedence constraints and due dates , 1986 .
[8] Philip M. Wolfe,et al. Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach , 1969 .
[9] A. A. Elimam,et al. Audit scheduling with overlapping activities and sequence-dependent setup costs , 1996 .
[10] Grzegorz Waligóra,et al. Project scheduling with finite or infinite number of activity processing modes - A survey , 2011, Eur. J. Oper. Res..
[11] C. Janie Chang. A Decision Support System For Audit Staff Scheduling Of Multiple And Large-Scaled Engagements , 2011, BIS 2011.
[12] Bajis Dodin,et al. Application of production scheduling methods to external and internal audit scheduling , 1991 .