Road and bridge transition section grouting construction method used during jacking construction

The invention relates to a road and bridge transition section grouting construction method used during jacking construction. According to the method, with a drilling pipe, a plurality rows of scallop grouting holes are drilled from railway shoulders on two sides of a road and bridge transition section towards the lower part of the railway with an inclined downward scallop manner; when one hole is produced, the drilling pipe is fetched, a shock tunnel is inserted into the hole, and grouting fluid is injected; when the grouting fluid level is 2 meters far from the ground, grouting is stopped, a grouting port is sealed, and the next hole is proceeded; an included angle range of the grouting scallop area relative to a subgrade plane is 15-75 DEG, and an adjustment range of adjacent two grouting holes 5 is 5 DEG. With the road and bridge transition section grouting construction method provided by the invention, road and bridge transition sections can be strengthened without breaking normal railway operation; the work space is small; the operation is convenient; and subsidence deformation of the road and bridge transition sections can be effectively controlled, such that uneven subsidence between the road and bridge transition sections and mass boxes can be prevented. Therefore, the method is beneficial for traffic security and personal security of a railway, and provides substantial economic benefits.