Uncertainty evaluation of wellbore stability model predictions
暂无分享,去创建一个
[1] E. Fjaer,et al. Petroleum Related Rock Mechanics , 1992 .
[2] Bernt S. Aadnøy,et al. Advanced Drilling and Well Technology , 2009 .
[3] Reidar Brumer Bratvold,et al. Making Good Decisions , 2010 .
[4] Øystein Arild,et al. BlowFlow - a New Tool within Blowout Risk Management , 2008 .
[5] Bernt S. Aadnøy. Quality Assurance of Wellbore Stability Analyses , 2011 .
[6] James A. Murtha,et al. Monte Carlo Simulation: Its Status and Future , 1997 .
[7] Tove Loberg,et al. KickRisk—A Well Specific Approach to the Quantification of Well Control Risks , 2009 .
[8] Øystein Arild,et al. Uncertainty-Based Approach for Predicting the Operating Window in UBO Well Design , 2013 .
[9] W. B. Bradley. Failure of Inclined Boreholes , 1979 .
[10] Nobuo Morita. Uncertainty analysis of borehole stability problems , 1995 .
[11] B. Aadnøy,et al. Bounds on In-Situ Stress Magnitudes Improve Wellbore Stability Analyses , 2005 .
[12] Øystein Arild,et al. The How's and Why's of Probabilistic Well Cost Estimation , 2008 .
[13] Q. J. Liang,et al. Application of Quantitative Risk Analysis to Pore Pressure and Fracture Gradient Prediction , 2002 .
[14] Bernt S. Aadnøy,et al. Inversion Technique To Determine the In-Situ, Stress Field From Fracturing Data , 1988 .
[15] Steven J. Sawaryn,et al. Monte Carlo Techniques Applied to Well Forecasting: Some Pitfalls , 2006 .
[16] Colin Gibson,et al. Probabilistic Well-Time Estimation Revisited , 2010 .
[17] Barkim Demirdal,et al. Use of Quantitative Risk Analysis for Uncertainty Quantification on Drilling Operations-Review and Lessons Learned , 2005 .
[18] D. Reddish,et al. Assessment of Uncertainties in Wellbore Stability Analysis , 2006 .
[19] Bernt S. Aadnøy,et al. STABILITY OF HIGHLY INCLINED BOREHOLES. , 1987 .
[20] R. C. McCann,et al. Borehole Stability Assessment Using Quantitative Risk Analysis , 1999 .