A stockyard planning problem
暂无分享,去创建一个
[1] Martin W. P. Savelsbergh,et al. Optimizing the Hunter Valley Coal Chain , 2012 .
[2] Andrea Lodi,et al. Two-dimensional packing problems: A survey , 2002, Eur. J. Oper. Res..
[3] Erhan Kozan,et al. Optimization of container process at seaport terminals , 2010, J. Oper. Res. Soc..
[4] K. L. Mak,et al. Yard planning for vessel services with a cyclical calling pattern , 2010 .
[5] Gilbert Laporte,et al. Optimizing yard assignment in an automotive transshipment terminal , 2008, Eur. J. Oper. Res..
[6] Andreas T. Ernst,et al. Integration of stockyard and rail network: a scheduling case study , 2004 .
[7] Erhan Kozan,et al. Scheduling trains as a blocking parallel-machine job shop scheduling problem , 2009, Comput. Oper. Res..
[8] Philippe Rigo,et al. Space and time allocation in a shipyard assembly hall , 2010, Ann. Oper. Res..
[9] Alexandra M. Newman,et al. A Review of Operations Research in Mine Planning , 2010, Interfaces.
[10] William D. Nordhaus,et al. Environmental Accounting for Pollution in the United States Economy , 2011 .
[11] Cd Glassock,et al. An Application of Dynamic Simulation to a Bulk Solids Handling Facility , 1995 .
[12] Der-Horng Lee,et al. A heuristic algorithm for yard truck scheduling and storage allocation problems , 2009 .
[13] Johan W. Joubert,et al. Scheduling at coal handling facilities using Simulated Annealing , 2008, Math. Methods Oper. Res..