Benefit/cost analysis of a robot-based construction automation system
暂无分享,去创建一个
Sung-Hoon An | Younghoon Lee | Hunhee Cho | Ung-Kyun Lee | Wi Sung Yoo | Taehoon Kim | Nakju Doh | S. An | N. Doh | W. Yoo | Ung-Kyun Lee | Taehoon Kim | Hunhee Cho | Y. Lee
[1] Jong-Tae Lim,et al. Metric based nonblocking supervisory control of discrete event systems , 2010, ICCAS 2010.
[2] Huaguo Zhou,et al. Methodology to Evaluate Effects of Access Control near Freeway Interchange Areas , 2008 .
[3] T. Saaty,et al. The Analytic Hierarchy Process , 1985 .
[4] Yuichi Ikeda,et al. Application of the Automated Building Construction System Using the Conventional Construction Method Together , 2006 .
[5] Yusuke Yamazaki,et al. The SMART system: an integrated application of automation and information technology in production process , 1998 .
[6] Zongzhi Li,et al. Highway Project Level Life-Cycle Benefit/Cost Analysis under Certainty, Risk, and Uncertainty: Methodology with Case Study , 2009 .
[7] Miroslaw J. Skibniewski,et al. Cost-Benefit Analysis of Embedded Sensor System for Construction Materials Tracking , 2009 .
[8] Ryoji Yoshitake,et al. Development of automated weather-unaffected building construction system , 1997 .
[9] Alexander H. Slocum,et al. Automation and robotics opportunities: Construction versus manufacturing , 1994 .
[10] Cengiz Kahraman,et al. Fuzzy multi-criteria evaluation of industrial robotic systems , 2007, Comput. Ind. Eng..
[11] Tareq Rezaul Haque,et al. Cost-based cooperative strategy to search mobile evader in roadmap based environment , 2010, ICCAS 2010.
[12] Tatsuya Wakisaka,et al. Automated construction system for high-rise reinforced concrete buildings , 1997 .