istorical variation in the capital costs of natural gas , carbon dioxide and ydrogen pipelines and implications for future infrastructure

Abstract The construction of large pipeline infrastructures for CH 4 , CO 2 and H 2 transportation usually constitutes a major and time-consuming undertaking, because of safety and environmental issues, legal and (geo)political siting arguments, technically un-trivial installation processes, and/or high investment cost requirements. In this paper we focus on the latter and present an overview of both the total costs and cost components of the transmission of these three gases via pipelines. Possible intricacies and external factors that strongly influence these costs, like the choice of location and terrain, are also included in our analysis. Our cost breakdown estimates are based on transportation data for CH 4 , which we adjust for CO 2 and H 2 in order to account for the specific additional characteristics of these two gases. Our main finding is that the economics of CH 4 , CO 2 and H 2 transportation through pipelines are volatile. In particular for CH 4 and CO 2 the overall trend seems that pipeline construction costs have not decreased over recent decades or, at least, that possible reductions in overall costs have been outshadowed by the variability in the costs of key inputs. We speculate on the reasons why we observe limited learning-by-doing effects and expect that negligible construction cost reductions for future CH 4 and CO 2 pipeline projects will materialize. Cost data of individual pipeline projects may strongly deviate from the global average because of national or regional effects, such as related to varying costs of labor and fluctuating market prices of components like steel. We conclude that only in an optimistic scenario we may observe learning effects for H 2 pipeline construction activity in the future, but there are currently insufficient data to fully support the limited evidence for this claim, so that the uncertainty of this prediction for now remains large.

[1]  Ambuj D. Sagar,et al.  Technological innovation in the energy sector : R&D, deployment, and learning-by-doing , 2006 .

[2]  F Ferioli,et al.  Learning in times of change: a dynamic explanation for technological progress. , 2009, Environmental science & technology.

[3]  Warren R. True Interstate pipeline systems reflect restructuring , 1987 .

[4]  Warren R. True Construction plans jump; operations skid in 1996 , 1997 .

[5]  Christopher E. Smith Pipeline profits, capacity expansion plans grow despite increased costs , 2009 .

[6]  André Faaij,et al.  Potential for CO2 sequestration and enhanced coalbed methane production in the Netherlands , 2006 .

[7]  Warren R. True,et al.  US construction plans slide; pipeline companies experience flat 2003, continue mergers , 2004 .

[8]  Christopher E. Smith US gas carriers' 2005 net incomes climb; construction costs plummet , 2006 .

[9]  Christopher E. Smith Natural gas pipeline profrits surge; oil flot , 2008 .

[10]  J. Gibbins,et al.  Carbon Capture and Storage , 2008 .

[11]  Christopher Yang,et al.  Determining the lowest-cost hydrogen delivery mode , 2007 .

[12]  Warren R. True U.S. INTERSTATE PIPELINES STRENGTHEN IN 1988 , 1989 .

[13]  W. R. True,et al.  Weather, construction inflation could squeeze North American pipelines , 1998 .

[14]  J. Zhao Diffusion, Costs and Learning in the Development of International Gas Transmission Lines , 2000 .

[15]  K. Schoots,et al.  The Cost of Pipelining Climate Change Mitigation: An Overview of the Economics of CH4, CO2 and H2 Transportation , 2010 .

[16]  Warren R. True U.S. INTERSTATE PIPELINES BEGIN 1993 ON UPBEAT , 1993 .

[17]  Warren R. True NEW CONSTRUCTION PLANS UP; REVENUES, INCOMES CONTINUE TO DECREASE , 1988 .

[18]  Warren R. True,et al.  US gas carriers see 2004 net jump; construction plans rebound , 2005 .

[19]  James J. Dooley,et al.  Comparing Existing Pipeline Networks with the Potential Scale of Future U.S. CO2 Pipeline Networks , 2009 .

[20]  Warren R. True U.S. PIPELINES EXPERIENCE ANOTHER TIGHT YEAR, REFLECT MERGER FRENZY , 1999 .

[21]  Warren R. True U.S. interstate pipelines ran more efficiently in 1994 , 1995 .

[22]  G. Kramer,et al.  Technology learning for fuel cells: An assessment of past and potential cost reductions , 2010 .

[23]  W. True U.S. GAS PIPELINES IMPROVE OPERATIONS, WANT TO EXPAND , 1990 .

[24]  Warren R. True 1990 U.S. INTERSTATE PIPELINES' EFFICIENCY CONTINUES IMPROVING , 1991 .

[25]  Warren R. True U.S. PIPELINES REPORT MIXED RESULTS FOR 1993 , 1994 .

[26]  Nathan Parker,et al.  Using Natural Gas Transmission Pipeline Costs to Estimate Hydrogen Pipeline Costs , 2004 .

[27]  Christopher E. Smith US oil carriers' 2006 net incomes rebound; or increases push up construction costs , 2007 .

[28]  Warren R. True,et al.  U.S. PIPELINES CONTINUE GAINS INTO 1996 , 1996 .

[29]  Warren R. True,et al.  US pieline companies solidly profitable in 2002, scale back construction plans , 2003 .

[30]  William D'haeseleer,et al.  The use of the natural-gas pipeline infrastructure for hydrogen transport in a changing market structure , 2007 .

[31]  K. Schoots,et al.  Learning curves for hydrogen production technology: An assessment of observed cost reductions , 2008 .

[32]  Tore A. Torp,et al.  CO2 underground storage costs as experienced at Sleipner and Weyburn , 2005 .

[33]  Harry Audus,et al.  Greenhouse gas mitigation technology: An overview of the CO2 capture and sequestration studies and further activities of the IEA Greenhouse Gas R&D Programme , 1997 .

[34]  Warren R. True U.S. INTERSTATE PIPELINES MAKE PAINFUL ADJUSTMENTS IN 1991 , 1992 .

[35]  F. Ferioli,et al.  Use and limitations of learning curves for energy technology policy: A component-learning hypothesis , 2009 .

[36]  Jean-Philippe Nicot,et al.  Risk Assessment for future CO2 Sequestration Projects Based CO2 Enhanced Oil Recovery in the U.S. , 2009 .