Robotic U-shaped assembly line balancing using particle swarm optimization
暂无分享,去创建一个
[1] Ihsan Sabuncuoglu,et al. Balancing of U-type assembly systems using simulated annealing , 2001 .
[2] Armin Scholl,et al. State-of-the-art exact and heuristic solution procedures for simple assembly line balancing , 2006, Eur. J. Oper. Res..
[3] S. G. Ponnambalam,et al. Obstacle avoidance control of redundant robots using variants of particle swarm optimization , 2012 .
[4] J. Wijngaard,et al. The U-line balancing problem , 1994 .
[5] Armin Scholl,et al. Data of assembly line balancing problems , 1995 .
[6] Yakup Kara. Line balancing and model sequencing to reduce work overload in mixed-model U-line production environments , 2008 .
[7] R. W. Sierenberg. An Algorithm for the Line Balancing Problem , 1972 .
[8] H Aigbedo,et al. A PARAMETRIC PROCEDURE FOR MULTICRITERION SEQUENCE SCHEDULING FOR JUSTIN-TIME MIXED-MODEL ASSEMBLY LINES , 1997 .
[9] Alexandre Dolgui,et al. A taxonomy of line balancing problems and their solutionapproaches , 2013 .
[10] Yeongho Kim,et al. An endosymbiotic evolutionary algorithm for the integration of balancing and sequencing in mixed-model U-lines , 2006, Eur. J. Oper. Res..
[11] S. G. Ponnambalam,et al. A Multi-Objective Genetic Algorithm for Solving Assembly Line Balancing Problem , 2000 .
[12] S. G. Ponnambalam,et al. An efficient PSO for type II robotic assembly line balancing problem , 2012, 2012 IEEE International Conference on Automation Science and Engineering (CASE).
[13] 윤태혁,et al. (The) U-line line balancing problem with the moving time of operator = U자형 라인에서 작업자 이동시간을 고려한 라인밸런싱에 관한 연구 , 1996 .
[14] Jianjun Yu,et al. A hybrid ant colony algorithm for U-line balancing and rebalancing in just-in-time production environment , 2014 .
[15] Mitsuo Gen,et al. U-shaped assembly line balancing problem with genetic algorithm , 2008 .
[16] John B. Kidd,et al. Toyota Production System , 1993 .
[17] John Miltenburg,et al. Balancing U-lines in a multiple U-line facility , 1998, Eur. J. Oper. Res..
[18] Katsuhisa Ohno,et al. An optimal worker allocation problem for a U-shaped production line , 1999 .
[19] T. K. Bhattacharjee,et al. Complexity of single model assembly line balancing problems , 1990 .
[20] Sener Akpinar,et al. Performance evaluation of ant colony optimization-based solution strategies on the mixed-model assembly line balancing problem , 2014 .
[21] Roger L. Wainwright,et al. Applying genetic algorithms to the U-shaped assembly line balancing problem , 1998, 1998 IEEE International Conference on Evolutionary Computation Proceedings. IEEE World Congress on Computational Intelligence (Cat. No.98TH8360).
[22] Mitsuo Gen,et al. An efficient approach for type II robotic assembly line balancing problems , 2009, Comput. Ind. Eng..
[23] Gregory Levitin,et al. A genetic algorithm for robotic assembly line balancing , 2006, Eur. J. Oper. Res..
[24] E. Lenz,et al. RALB – A Heuristic Algorithm for Design and Balancing of Robotic Assembly Lines , 1993 .
[25] Riccardo Poli,et al. Particle swarm optimization , 1995, Swarm Intelligence.
[26] U. Martinez,et al. Heuristic approaches to solve the U-shaped line balancing problem augmented by genetic algorithms , 2004, Proceedings of the 2004 IEEE Systems and Information Engineering Design Symposium, 2004..
[27] Avraham Shtub,et al. Assembly Line Balancing with Resource Dependent Task Times , 1992 .
[28] M. Yadin,et al. ON THE PROBLEM OF ASSEMBLY LINE BALANCING , 1969 .
[29] Gordon Johnson,et al. Currently practiced formulations for the assembly line balance problem , 1983 .
[30] Sun Jin Kim,et al. Balancing and sequencing mixed-model U-lines with a co-evolutionary algorithm , 2000 .
[31] Hadi Gökçen,et al. A shortest route formulation of simple U-type assembly line balancing problem , 2005 .
[32] Uğur Özcan,et al. A fuzzy goal programming model for the simple U-line balancing problem with multiple objectives , 2008 .
[33] Armin Scholl,et al. ULINO: Optimally balancing U-shaped JIT assembly lines , 1999 .
[34] Majid Aminnayeri,et al. Type II robotic assembly line balancing problem: An evolution strategies algorithm for a multi-objective model , 2012 .
[35] P. Chutima,et al. Multi-objective Particle Swarm Optimization with Negative Knowledge for U-shaped Assembly Line worker allocation problems , 2010, 2010 IEEE International Conference on Industrial Engineering and Engineering Management.
[36] Wen-Chyuan Chiang,et al. The stochastic U-line balancing problem: A heuristic procedure , 2006, Eur. J. Oper. Res..
[37] Wenming Cheng,et al. An Exact Method for U-Shaped Assembly Line Balancing Problem , 2010, 2010 2nd International Workshop on Intelligent Systems and Applications.
[38] Qidi Wu,et al. Biogeography-based particle swarm optimization with fuzzy elitism and its applications to constrained engineering problems , 2014 .
[39] K.Y. Lee,et al. Application of Particle Swarm Optimization to Economic Dispatch Problem: Advantages and Disadvantages , 2006, 2006 IEEE PES Power Systems Conference and Exposition.
[40] Ertan Güner,et al. Simple and U-type assembly line balancing problems with a learning effect , 2008 .
[41] Timothy L. Urban,et al. Note. Optimal Balancing of U-Shaped Assembly Lines , 1998 .
[42] Ezey M. Dar-El,et al. MALB—A Heuristic Technique for Balancing Large Single-Model Assembly Lines , 1973 .
[43] Alan Davies,et al. JIT—Factory Revolution , 1990 .
[44] Rajeev Jain,et al. A heuristic approach for U-shaped assembly line balancing to improve labor productivity , 2013, Comput. Ind. Eng..
[45] Ashutosh Tiwari,et al. A review on assembly sequence planning and assembly line balancing optimisation using soft computing approaches , 2012 .
[46] Adil Baykasoglu,et al. Multi-rule Multi-objective Simulated Annealing Algorithm for Straight and U Type Assembly Line Balancing Problems , 2006, J. Intell. Manuf..
[47] Richard M. Karp,et al. Reducibility Among Combinatorial Problems , 1972, 50 Years of Integer Programming.
[48] Upendra Dave. Stochastic Integrals and Goodness-of-fit Tests , 1995 .
[49] Dong Wang,et al. A Novel Assembly Line Balancing Method Based on PSO Algorithm , 2014 .
[50] S. G. Ponnambalam,et al. Multi-rule multi-objective Ant Colony Optimization for straight and U-type assembly line balancing problem , 2009, 2009 IEEE International Conference on Automation Science and Engineering.
[51] Lionel Amodeo,et al. Solving a robotic assembly line balancing problem using efficient hybrid methods , 2014, J. Heuristics.
[52] Masoud Rabbani,et al. A hybrid multi-objective particle swarm algorithm for a mixed-model assembly line sequencing problem , 2007 .
[53] P. Sivasankaran,et al. Literature review of assembly line balancing problems , 2014 .