Improvised construction management activity scheduling using proposed Cheng’s fuzzy entropy-analytical node activity hierarchy process (ANAHP)

In this paper, a new project management technique is modified for encompassing decision uncertainty. The previous method proposed is called Analytical Node Activity Hierarchy Process (ANAHP), with current study a Fuzzy Cheng’s technique is being introduced namely Cheng’s entropy technique. The process involves node network analysis along with a provision of fuzzy decision making of available alternative for an activity based on various criteria defined by the decision maker. For construction projects some of these criteria can be cost of the construction, time duration of the completion of work and durability of the component or reliability of the materials. For devising the method, a parametric model problem in terms of variables is described with corresponding independent variables varying from problem to problem. The modified method can help in improving the efficiency and dimensionality of the project management process while compensating for uncertainties. At the end of the paper a scope of the future studies is also mentioned that opens doors to new and more accurate techniques that can also be adopted or modified as per the need for the construction industry.

[1]  Patrick S. W. Fong,et al.  Final contractor selection using the analytical hierarchy process , 2000 .

[2]  Martin Skitmore,et al.  Contractor selection using multi criteria utility theory: an additive mode , 1998 .

[3]  Abdullah M. Alsugair Framework for Evaluating Bids of Construction Contractors , 1999 .

[4]  D. Chang Applications of the extent analysis method on fuzzy AHP , 1996 .

[5]  Ching-Hsue Cheng,et al.  Evaluating attack helicopters by AHP based on linguistic variable weight , 1999, Eur. J. Oper. Res..

[6]  Jyh-Rong Chou,et al.  A Gestalt-like perceptual measure for home page design using a fuzzy entropy approach , 2006, Int. J. Hum. Comput. Stud..

[7]  J. Buckley,et al.  Fuzzy hierarchical analysis , 1999, FUZZ-IEEE'99. 1999 IEEE International Fuzzy Systems. Conference Proceedings (Cat. No.99CH36315).

[8]  Ernest H. Forman,et al.  Decision by Objectives , 2001 .

[9]  Martin Skitmore,et al.  Criteria for contractor selection , 1997 .

[10]  Kamal M. Al‐Subhi Al‐Harbi,et al.  Application of the AHP in project management , 2001 .

[11]  Adrie J. M. Beulens,et al.  Simulation model of multi-compartment distribution in the catering supply chain , 1998, Eur. J. Oper. Res..

[12]  Philip G. Creed,et al.  The potential of foodservice systems for satisfying consumer needs , 2001 .

[13]  Luis F. Alarcón,et al.  PERFORMANCE MODELING FOR CONTRACTOR SELECTION , 2002 .

[14]  Ching-Hsue Cheng Evaluating naval tactical missile systems by fuzzy AHP based on the grade value of membership function , 1997 .