Modeling and optimizing the integrated problem of closed-loop supply chain network design and disassembly line balancing

This paper describes an integrated model that jointly optimizes the strategic and tactical decisions of a closed-loop supply chain (CLSC). The strategic level decisions relate to the amounts of goods flowing on the forward and reverse chains. The tactical level decisions concern balancing disassembly lines in the reverse chain. The objective is to minimize costs of transportation, purchasing, refurbishing, and operating the disassembly workstations. A nonlinear mixed integer programming formulation is described for the problem. Numerical examples are presented using the proposed model.

[1]  Manoj Kumar Tiwari,et al.  A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem , 2008 .

[2]  Mehmet Ali Ilgin,et al.  Environmentally conscious manufacturing and product recovery (ECMPRO): A review of the state of the art. , 2010, Journal of environmental management.

[3]  Augusto Q. Novais,et al.  A strategic and tactical model for closed-loop supply chains , 2009, OR Spectr..

[4]  David J. Forkenbrock,et al.  Comparison of external costs of rail and truck freight transportation , 2001 .

[5]  Halit Üster,et al.  Integration of strategic and tactical decisions for vendor selection under capacity constraints , 2010, Comput. Oper. Res..

[6]  Turan Paksoy,et al.  Reverse supply chain optimisation with disassembly line balancing , 2013 .

[7]  Saman Hassanzadeh Amin,et al.  A multi-objective facility location model for closed-loop supply chain network under uncertain demand and return , 2013 .

[8]  Saman Hassanzadeh Amin,et al.  An integrated model for closed-loop supply chain configuration and supplier selection: Multi-objective approach , 2012, Expert Syst. Appl..

[9]  Yixiong Feng,et al.  A new multi-objective ant colony algorithm for solving the disassembly line balancing problem , 2010 .

[10]  Turan Paksoy,et al.  Operational and environmental performance measures in a multi-product closed-loop supply chain , 2011 .

[11]  L. N. Van Wassenhove,et al.  Concurrent product and closed-loop supply chain design with an application to refrigerators , 2003 .

[12]  Askiner Gungor,et al.  Issues in environmentally conscious manufacturing and product recovery: a survey , 1999 .

[13]  Riccardo Manzini,et al.  Strategic Design and Operational Management Optimization of a Multi Stage Physical Distribution System , 2009 .

[14]  Pierre Dejax,et al.  Production planning of a hybrid manufacturing–remanufacturing system under uncertainty within a closed-loop supply chain , 2012 .

[15]  Jacqueline M. Bloemhof-Ruwaard,et al.  THE IMPACT OF PRODUCT RECOVERY ON LOGISTICS NETWORK DESIGN , 2001 .

[16]  Govindan Kannan,et al.  A genetic algorithm approach for solving a closed loop supply chain model: A case of battery recycling , 2010 .

[17]  Can Akkan,et al.  Task-failure-driven rebalancing of disassembly lines , 2012 .

[18]  Surendra M. Gupta,et al.  Disassembly line balancing. , 2007 .

[19]  Levent Kandiller,et al.  Profit-oriented disassembly-line balancing , 2008 .

[20]  Mir Saman Pishvaee,et al.  A robust optimization approach to closed-loop supply chain network design under uncertainty , 2011 .

[21]  Surendra M. Gupta,et al.  Combinatorial optimization analysis of the unary NP-complete disassembly line balancing problem , 2007 .

[22]  Z. H. Che,et al.  Cooperator selection and industry assignment in supply chain network with line balancing technology , 2009, Expert Syst. Appl..

[23]  Halit Üster,et al.  Tabu Search and Benders Decomposition Approaches for a Capacitated Closed-Loop Supply Chain Network Design Problem , 2009, Transp. Sci..

[24]  Srivathsan Narayanan Optimizing Reverse Logistics with SAP ERP , 2010 .

[25]  Ronald S. Tibben-Lembke,et al.  Going Backwards: Reverse Logistics Trends and Practices , 1999 .

[26]  Turan Paksoy,et al.  Mixed model disassembly line balancing problem with fuzzy goals , 2013 .

[27]  Turan Paksoy,et al.  A mixed integer programming model for a closed-loop supply-chain network , 2013 .

[28]  Mark Pagell,et al.  The supply chain implications of recycling , 2007 .

[29]  Mir Saman Pishvaee,et al.  A possibilistic programming approach for closed-loop supply chain network design under uncertainty , 2010, Fuzzy Sets Syst..

[30]  Hokey Min,et al.  The spatial and temporal consolidation of returned products in a closed-loop supply chain network , 2006, Comput. Ind. Eng..

[31]  P. Miranda,et al.  INCORPORATING INVENTORY CONTROL DECISIONS INTO A STRATEGIC DISTRIBUTION NETWORK DESIGN MODEL WITH STOCHASTIC DEMAND , 2004 .

[32]  MengChu Zhou,et al.  Disassembly modeling, planning, and application , 2002 .

[33]  Halit Üster,et al.  A closed-loop supply chain network design problem with integrated forward and reverse channel decisions , 2010 .

[34]  Surendra M. Gupta,et al.  A balancing method and genetic algorithm for disassembly line balancing , 2007, Eur. J. Oper. Res..

[35]  Mir Saman Pishvaee,et al.  A memetic algorithm for bi-objective integrated forward/reverse logistics network design , 2010, Comput. Oper. Res..

[36]  Hsiao-Fan Wang,et al.  A closed-loop logistic model with a spanning-tree based genetic algorithm , 2010, Comput. Oper. Res..

[37]  Ihsan Sabuncuoglu,et al.  Two exact formulations for disassembly line balancing problems with task precedence diagram construction using an AND/OR graph , 2009 .

[38]  Erwin van der Laan,et al.  Quantitative models for reverse logistics: A review , 1997 .

[39]  Surendra M. Gupta,et al.  Disassembly line in product recovery , 2002 .

[40]  Rommert Dekker,et al.  A characterisation of logistics networks for product recovery , 2000 .

[41]  Nader Azad,et al.  Incorporating location, routing and inventory decisions in supply chain network design , 2010 .

[42]  Guangfen Yang,et al.  The optimization of the closed-loop supply chain network , 2009 .

[43]  Trisha D. Anderson,et al.  The closed-loop supply chain network with competition, distribution channel investment, and uncertainties , 2013 .

[44]  V D R Guide,et al.  A closed-loop logistics model for remanufacturing , 1999, J. Oper. Res. Soc..

[45]  Hai Jiang,et al.  A Lagrangian relaxation based approach for the capacitated lot sizing problem in closed-loop supply chain , 2012 .