The flow management problem in air traffic control: a model of assigning priorities for landings at a congested airport

An Air Traffic Control (ATC) network consists of departure airports, a single landing airport and a network of airways connecting the airports. The flights planned to be carried over the network represent the demand for service which should be served during a given period of time under given conditions. Landing airport capacity is the element of the network which causes congestion and potentially lengthy flight delays which spread over the network. Under such conditions the landing airport and the ATC network are considered to be overloaded. This paper presents a model of assigning priorities for landings in such an overloaded system. The model is based on a concept of deterministic priority queues which enables ATC to control and distribute the total delays and their costs to particular flights subject to given criteria. The model can be used for planning purposes. It will also support calculation of the total cost of aircraft delays under various conditions prevailing in the ATC network during a given time period, as well as sensitivity analysis of the cost of these delays depending on changes in various influencing factors.

[1]  Amedeo R. Odoni,et al.  Landings at Logan Airport: Describing and Increasing Airport Capacity , 1993, Transp. Sci..

[2]  Adib Kanafani,et al.  DEVELOPMENTS IN AIRPORT CAPACITY ANALYSIS , 1974 .

[3]  Dušan Teodorović,et al.  Fuzzy inference approach to the flow management problem in air traffic control , 1993 .

[4]  Yosef S. Sherif,et al.  AN ALGORITHM FOR COMPUTER ASSISTED SEQUENCING AND SCHEDULING OF TERMINAL AREA OPERATIONS , 1991 .

[5]  Giovanni Andreatta,et al.  Aircraft Flow Management under Congestion , 1987, Transp. Sci..

[6]  Mirjana Cangalovic,et al.  SOME MODELS AND ALGORITHMS FOR EN ROUTE AIR TRAFFIC FLOW MANAGEMENT. , 1995 .

[7]  S E Fawcett,et al.  CONGESTION AT CAPACITY-CONSTRAINED AIRPORTS: A QUESTION OF ECONOMICS AND REALISM , 1988 .

[8]  Harilaos N. Psaraftis,et al.  A Dynamic Programming Approach for Sequencing Groups of Identical Jobs , 1980, Oper. Res..

[9]  Matthew Rosenshine,et al.  The Application of Semi-Markov Decision Processes to Queueing of Aircraft for Landing at an Airport , 1985, Transp. Sci..

[10]  Vojin S. Tosic,et al.  Air route flow management — problems and research efforts , 1995 .

[11]  Ignacy Tarski THE TIME FACTOR IN TRANSPORTATION PROCESSES , 1987 .

[12]  Gordon F. Newell,et al.  Airport Capacity and Delays , 1979 .

[13]  Robert W. Simpson AN INTEGRATED VIEW OF AIR TRAFFIC MANAGEMENT PROBLEMS , 1987 .

[14]  Adib Kanafani,et al.  Transportation Demand Analysis , 1983 .

[15]  A. Odoni The Flow Management Problem in Air Traffic Control , 1987 .

[16]  Robert Horonjeff,et al.  Planning and design of airports , 1950 .

[17]  Salah G. Hamzawi Lack of airport capacity: Exploration of alternative solutions , 1992 .

[18]  Amedeo R. Odoni,et al.  Solving Optimally the Static Ground-Holding Policy Problem in Air Traffic Control , 1993, Transp. Sci..