Cost-effective track geometry maintenance limits
暂无分享,去创建一个
[1] Michael J Markow. APPLICATION OF LIFE-CYCLE COSTING AND DEMAND-RESPONSIVE MAINTENANCE TO RAIL MAINTENANCE OF WAY , 1985 .
[2] Alan J Bing,et al. DEVELOPMENT OF RAILROAD TRACK DEGRADATION MODELS , 1983 .
[3] Ambika Prasad Patra,et al. Maintenance decision support models for railway infrastructure using RAMS and LCC analyses , 2009 .
[4] Tatsuya Ishikawa,et al. Modeling the transition process of railway track irregularity and its application to the optimal decision-making for multiple tie tamper operations , 2000 .
[5] Uday Kumar,et al. Holistic procedure for rail maintenance in Sweden , 2008 .
[6] Iman Arasteh Khouy. Optimization of track geometry maintenance: a study of track geometry degradation to specify optimal inspection intervals , 2011 .
[7] Luca Podofillini,et al. Risk-informed optimisation of railway tracks inspection and maintenance procedures , 2006, Reliab. Eng. Syst. Saf..
[8] Jianmin Zhao,et al. Optimizing Policies of Railway Ballast Tamping and Renewal , 2006 .
[9] Uday Kumar,et al. Optimisation of maintenance track possession time: A tamping case study , 2015 .
[10] Andrew Higgins. Scheduling of railway track maintenance activities and crews , 1998, J. Oper. Res. Soc..