Regulation of transmission expansion in Argentina Part I: State ownership, reform and the Fourth Line

From 1992 to 2002, major expansions of the Argentine electricity transmission sector depended on users proposing, voting and paying for such expansions, which were then put out to competitive tender. Commentators hold this novel policy to have been unsuccessful, mainly on the ground that it substantially delayed investment in a much needed “Fourth Line” to Buenos Aire. This paper challenges this interpretation. The policy was chosen because the conventional regulatory framework could not be trusted to deliver more efficient transmission investment decisions. The delay to the Fourth Line was short. Most importantly, the Fourth Line was not economic. Hence the delay was beneficial both in deferring and in reducing costs. It indicated a need to reappraise transmission investment policy because the availability of gas had made it more economic to generate electricity near Buenos Aires than to transmit it a long distance.

[1]  José A. Gómez-Ibáñez,et al.  Regulating Infrastructure: Monopoly, Contracts, and Discretion , 2003 .

[2]  Fiona Woolf,et al.  Global Transmission Expansion: Recipes For Success , 2003 .

[3]  Thomas-Olivier Léautier,et al.  Regulation of an Electric Power Transmission Company , 2000 .

[4]  Stephen Littlechild,et al.  Transmission regulation, merchant investment, and the experience of SNI and Murraylink in the Australian National Electricity Market , 2003 .

[5]  M. A. Abdala,et al.  Transmission Investment in Competitive Power Systems: Decentralizing decisions in Argentina , 1999 .

[6]  Decentralized Investment and Quality Decisions In Common-Pool Networks , 2005 .

[7]  Ingo Vogelsang,et al.  Price Regulation for Independent Transmission Companies , 2001 .

[8]  I. Pérez-Arriaga,et al.  Marginal pricing of transmission services: a comparative analysis of network cost allocation methods , 2000 .

[9]  Steven Stoft,et al.  Electric grid investment under a contract network regime , 1996 .

[10]  Regulated and merchant interconnectors in Australia: SNI and Murraylink revisited , 2004 .

[11]  W. Hogan Contract networks for electric power transmission , 1992 .

[12]  S. Littlechild,et al.  Regulation of transmission expansion in Argentina Part II: Developments since the Fourth Line , 2004 .

[13]  A. Estache,et al.  Regulatory lessons from Argentina's power concessions , 1996 .

[14]  Steven Stoft,et al.  Improving private incentives for electric grid investment , 1997 .

[15]  Thomas-Olivier Léautier,et al.  Transmission Constraints and Imperfect Markets for Power , 2001 .

[16]  I. Pérez-Arriaga,et al.  Marginal pricing of transmission services: an analysis of cost recovery , 1995 .

[17]  Stephen C. Peck,et al.  A market mechanism for electric power transmission , 1996 .

[18]  Omar O. Chisari,et al.  High-tension electricity network expansions in Argentina: decision mechanisms and willingness-to-pay revelation , 2001 .